| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/01/2017 |
140689510 |
01 |
A2 |
X SIGNED OFF |
04/13/2018 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE TWO (2) GAS BOILERS (NYC BOILER NO. NO'S MD41604-03 & 04). AND CON
|
|
Work on Floor(s): CEL
|
| 08/31/2017 |
140689486 |
01 |
A2 |
H P/E IN PROCESS |
08/31/2017 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/01/2017 REPLACE TWO (2) GAS BOILERS (NYC BOILER NO. NO'S
|
|
Work on Floor(s): CEL
|
| 06/22/2017 |
120886728 |
03 |
A2 |
P APPROVED |
07/07/2017 |
|
ZINGHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 05/09/2017 |
123093446 |
01 |
A3 |
R PERMIT-ENTIRE |
05/09/2018 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED
|
|
Work on Floor(s): OSP
|
| 07/27/2016 |
122287952 |
02 |
A2 |
P APPROVED |
08/01/2016 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 03/24/2015 |
122287952 |
01 |
A2 |
X SIGNED OFF |
03/28/2017 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE (2) GAS BOILERS WITH (3) GAS BOILERS AS PER PLANS. NO CHANGE IN US
|
|
Work on Floor(s): CEL
|
| 07/30/2013 |
121730029 |
01 |
A3 |
P APPROVED |
07/30/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF A 600LB CAPACITY BETA MAX ELECTRIC MATERIAL HOIST ATTACHED
|
|
Work on Floor(s): OSP
|
| 06/18/2013 |
120886728 |
02 |
A2 |
P APPROVED |
08/22/2013 |
|
ZINGHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 08/06/2012 |
121160091 |
01 |
A3 |
R PERMIT-ENTIRE |
05/14/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPT
|
|
Work on Floor(s): OSP
|
| 11/16/2011 |
120886728 |
01 |
A2 |
R PERMIT-ENTIRE |
06/07/2018 |
0052081 PE |
ZINGHER |
|
NOT APPLICABLE
|
|
APPLICATION FILE TO REPAIR BUILDING FA ADE, NO CHANGE IN USE, OCCUPANCY OR
|
|
Work on Floor(s): FAC
|
| 06/07/2011 |
120711809 |
01 |
A2 |
X SIGNED OFF |
08/11/2011 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
REPLACEMENT OF EXISTING CHILLER IN CELLAR THERE WILL BE NO CHANGE IN USE E
|
|
Work on Floor(s): CEL
|
| 12/05/2001 |
103053703 |
01 |
A3 |
X SIGNED OFF |
06/18/2008 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED.
|
| 12/05/2001 |
103053696 |
01 |
A3 |
X SIGNED OFF |
11/01/2005 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SCAFFOLD- 50' LONG BY 15' HIGH
|
| 11/20/2000 |
102901763 |
01 |
A3 |
R PERMIT-ENTIRE |
11/29/2000 |
|
ZAHARIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLDING 43'X 160'HGH DURING FACADE REPAIR
|
|
Work on Floor(s): GRD
|
| 10/05/1999 |
102456600 |
01 |
A2 |
X SIGNED OFF |
08/14/2003 |
0052081 PE |
ZINGHER |
|
NOT APPLICABLE
|
|
FACADE REPAIRS.
|
|
Work on Floor(s): FAC
|
| 03/12/1999 |
102003797 |
01 |
A3 |
X SIGNED OFF |
06/24/2004 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHED:56' LONG
|
| 11/07/1991 |
100205751 |
01 |
A3 |
R PERMIT-ENTIRE |
11/08/1991 |
|
O'FARREL |
|
NOT APPLICABLE
|
|
44' SHED- LENGTH OF BUILDING PLUS 20' EACH END EXTENSION. NO CHANGE IN
|
|
Work on Floor(s): GRD
|
| 11/02/1990 |
100139002 |
01 |
A2 |
R PERMIT-ENTIRE |
11/02/1990 |
0039958 PE |
KATZ |
|
NOT APPLICABLE
|
|
INSTALL REFUSE COMPACTOR IN EXISTING IN- CINERATOR ROOM.NO CHANGE IN USE
|
|
Work on Floor(s): CEL
|
| 08/23/1990 |
100103200 |
01 |
A2 |
R PERMIT-ENTIRE |
09/20/1990 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL 3 THREE GAS BOILER AND 1 ONE GAS HOT WATER HEATER NO CHANGE IN
|
|
Work on Floor(s): CEL
|