| 11/13/2020 |
123598348 |
02 |
A2 |
P APPROVED |
11/16/2020 |
|
BURY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1
|
| 10/22/2020 |
140968530 |
01 |
A2 |
X SIGNED OFF |
06/24/2024 |
0081378 PE |
BOWEN |
|
NOT APPLICABLE
|
|
STRUCTURAL MODIFICATIONS TO ACCOMMODATE NEW DUNNAGE AND SITE WORK FOR THE
|
|
Work on Floor(s): ROF
|
| 09/23/2020 |
123670223 |
03 |
A2 |
P APPROVED |
09/25/2020 |
|
COPELAND |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 034,035
|
| 01/09/2020 |
140882267 |
01 |
A2 |
X SIGNED OFF |
05/13/2020 |
0036266 RA |
LUTZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF INTERIOR PARTITIONS AND FINISHES ON PARTIAL 1ST FLOOR TO
|
|
Work on Floor(s): 001
|
| 12/19/2019 |
123710369 |
01 |
A2 |
X SIGNED OFF |
04/20/2021 |
0025160 RA |
JABRO |
|
NOT APPLICABLE
|
|
REMOVE PARTITIONS AND FINISHES IN COMMERCIAL SPACE ON PARTIAL 1ST FLOOR AS
|
|
Work on Floor(s): 001
|
| 11/21/2019 |
121149284 |
07 |
A1 |
P APPROVED |
12/12/2019 |
0036266 RA |
LUTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 11/08/2019 |
140875523 |
01 |
A2 |
X SIGNED OFF |
01/31/2020 |
0036266 RA |
LUTZ |
|
NOT APPLICABLE
|
|
REMOVE PARTITIONS AND FINISHES IN COMMERCIAL SPACE ON PARTIAL 1ST FLOOR AS
|
|
Work on Floor(s): 001
|
| 09/27/2019 |
123548713 |
02 |
A2 |
P APPROVED |
10/03/2019 |
|
HOLOWITZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 08/08/2019 |
140862047 |
01 |
A2 |
X SIGNED OFF |
03/20/2020 |
0031922 RA |
KATZ |
|
NOT APPLICABLE
|
|
REPLACEMENT OF FENCE ON 34TH FLOOR ROOF TERRACE AS PER PLANS FILED HEREWIT
|
|
Work on Floor(s): 034
|
| 06/18/2019 |
123181323 |
02 |
A2 |
P APPROVED |
06/19/2019 |
|
HOLOWITZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1
|
| 05/03/2019 |
123670223 |
01 |
A2 |
X SIGNED OFF |
02/26/2021 |
0025160 RA |
JABRO |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATIONS TO THE DUPLEX APARTMENT LOCATED ON PARTIAL FLOORS 34
|
|
Work on Floor(s): 034,035
|
| 05/03/2019 |
123670223 |
02 |
A2 |
X SIGNED OFF |
02/26/2021 |
0045101 PE |
COPELAND |
|
NOT APPLICABLE
|
|
PLUMBING AND HVAC MODIFICATIONS TO ACCOMMODATE THE RENOVATION OF THE APART
|
|
Work on Floor(s): 034,035
|
| 04/25/2019 |
121149284 |
06 |
A1 |
P APPROVED |
05/03/2019 |
|
MCSWIENE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 01/24/2019 |
123439797 |
02 |
A2 |
P APPROVED |
02/05/2019 |
|
ZIMMERMA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 036
|
| 01/17/2019 |
123598348 |
01 |
A2 |
X SIGNED OFF |
11/23/2020 |
0087331 PE |
BURY |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE 3 HOT WATER HEATERS IN THE SUB-CELLAR AS PER PLANS FILE
|
|
Work on Floor(s): SC1
|
| 08/28/2018 |
123548713 |
01 |
A2 |
X SIGNED OFF |
10/03/2019 |
0059135 PE |
HOLOWITZ |
|
NOT APPLICABLE
|
|
MODIFICATION TO TO HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS
|
|
Work on Floor(s): 001
|
| 08/28/2018 |
123445913 |
01 |
A2 |
R PERMIT-ENTIRE |
06/25/2019 |
0094685 PE |
MITCHELL |
|
NOT APPLICABLE
|
|
MODIFICATIONS TO FIRE ALARM SYSTEM
|
|
Work on Floor(s): 001
|
| 05/04/2018 |
123602039 |
01 |
A3 |
P APPROVED |
05/04/2018 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
PROPOSED FACADE SSP FILING (AS ALT3) IN CONJUNCTION WITH DOB JOB #: 123439
|
|
Work on Floor(s): FAC 001 thru 035
|
| 04/23/2018 |
123439797 |
01 |
A2 |
X SIGNED OFF |
01/14/2020 |
0014327 RA |
ZIMMERMA |
|
NOT APPLICABLE
|
|
MISCELLANEOUS CONCRETE PATCH REPAIR AT NORTH & SOUTH ELEVATIONS. REMOVAL &
|
|
Work on Floor(s): 001 thru 036
|
| 03/20/2018 |
140748314 |
01 |
A3 |
P APPROVED |
03/20/2018 |
0060136 PE |
SILVA |
|
NOT APPLICABLE
|
|
FIRE PROTECTION PLAN NO WORK UNDER THIS APPLICATION
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 004
|
| 01/31/2018 |
123181323 |
01 |
A2 |
X SIGNED OFF |
06/25/2019 |
0059135 PE |
HOLOWITZ |
|
NOT APPLICABLE
|
|
MODIFICATION TO EXITING STEAM PIPING AS INDICATED ON PLANS FILED HEREWITH.
|
|
Work on Floor(s): SC1
|
| 09/20/2017 |
121149284 |
05 |
A1 |
P APPROVED |
09/25/2017 |
|
MCSWIENE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 09/19/2017 |
100065331 |
16 |
A1 |
P APPROVED |
09/25/2017 |
|
CLAMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,MEZ,002
|
| 09/19/2017 |
121408538 |
06 |
A1 |
P APPROVED |
09/25/2017 |
|
ERENBERG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 06/24/2016 |
140513497 |
01 |
A2 |
R PERMIT-ENTIRE |
06/28/2016 |
0095847 PE |
ARENA |
|
NOT APPLICABLE
|
|
REPLACE OUTDOOR AC UNIT AND INSTALL NEW AC UNITS PER PLANS.
|
|
Work on Floor(s): ROF,1ST
|
| 08/24/2015 |
122483124 |
01 |
A2 |
P APPROVED |
08/25/2015 |
0087331 PE |
BURY |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE HOT WATER STORAGE TANKS IN THE SUB-CELLAR AS PER PLANS
|
|
Work on Floor(s): SC1
|
| 02/25/2015 |
122273565 |
01 |
A2 |
X SIGNED OFF |
08/14/2015 |
0087331 PE |
BURY |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE CONDENSER WATER PIPING IN THE MECHANICAL PENTHOUSE AS P
|
|
Work on Floor(s): PH
|
| 11/20/2014 |
140280158 |
01 |
A3 |
R PERMIT-ENTIRE |
11/25/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 11/06/2014 |
122005775 |
01 |
A2 |
R PERMIT-ENTIRE |
11/06/2014 |
0080457 PE |
WLADYKA |
|
NOT APPLICABLE
|
|
REPLACEMENT OF CHILLER ON ROOF AS PER PLANS. NO CHANGE TO ZONING, USE,
|
|
Work on Floor(s): 004
|
| 07/25/2014 |
121408538 |
05 |
A1 |
P APPROVED |
08/04/2014 |
0074872 PE |
GUTKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 003
|
| 11/12/2013 |
121829879 |
01 |
A2 |
X SIGNED OFF |
06/10/2014 |
0020881 RA |
ERENBERG |
|
NOT APPLICABLE
|
|
MODIFICATION TO ENTRANCE DOOR, INTERIOR VESTIBULE AND FINISHES TO ACCOMMOD
|
|
Work on Floor(s): 001
|
| 06/10/2013 |
121408538 |
04 |
A1 |
P APPROVED |
06/20/2013 |
0074872 PE |
GUTKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 003
|
| 05/08/2013 |
121149284 |
04 |
A1 |
P APPROVED |
06/03/2013 |
0591351 PE |
HOLOWITZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 002,ROF
|
| 04/08/2013 |
121408538 |
03 |
A1 |
R PERMIT-ENTIRE |
04/18/2013 |
0074872 PE |
GUTKIN |
|
NOT APPLICABLE
|
|
SPRINKLER INSTALLATION IN 1 NEW APARTMENT ON PARTIAL 3RD FLOOR IN THE EXIS
|
|
Work on Floor(s): 003
|
| 04/01/2013 |
121573886 |
01 |
A2 |
R PERMIT-ENTIRE |
04/01/2013 |
0020881 RA |
ERENBERG |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION IN THE EXISTING OFFICE SUITE ON PARTIAL 3RD FLOOR AS P
|
|
Work on Floor(s): 003
|
| 02/20/2013 |
121149284 |
03 |
A1 |
R PERMIT-ENTIRE |
03/13/2013 |
0034836 PE |
SELNICK |
|
NOT APPLICABLE
|
|
CONSTRUCT A NEW EXTERIOR STAIR FROM 2ND FLOOR TO GRADE TO ACCOMMDOATE THE
|
|
Work on Floor(s): 001,002
|
| 02/20/2013 |
121502935 |
01 |
A2 |
R PERMIT-ENTIRE |
04/12/2013 |
0074872 PE |
GUTKIN |
|
NOT APPLICABLE
|
|
FIRE ALARM MODIFICATION ON PARTIAL 3RD FLORO TO ACCOMMDOATE NEW APARTMENTS
|
|
Work on Floor(s): 003
|
| 01/17/2013 |
121054232 |
01 |
A2 |
R PERMIT-ENTIRE |
06/27/2013 |
0023556 RA |
MCSWIENE |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION IN THE EXISTING OFFICES ON PARTIAL 2ND FLOOR AS PER PL
|
|
Work on Floor(s): 002
|
| 11/30/2012 |
121427214 |
01 |
A2 |
X SIGNED OFF |
08/22/2013 |
0591351 PE |
HOLOWITZ |
|
NOT APPLICABLE
|
|
MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM TO ACCOMMODATE ALTERATIONS
|
|
Work on Floor(s): 002
|
| 11/28/2012 |
121149284 |
02 |
A1 |
R PERMIT-ENTIRE |
03/22/2013 |
0591351 PE |
HOLOWITZ |
|
NOT APPLICABLE
|
|
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK WITH ASSOCIATED PLUMBING WORK
|
|
Work on Floor(s): 002,ROF
|