| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/16/2017 |
123083974 |
02 |
A2 |
P APPROVED |
10/25/2017 |
|
GOULD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 08/23/2017 |
123122708 |
01 |
A2 |
R PERMIT-ENTIRE |
12/29/2017 |
0063714 PE |
DUNNE |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK TO INCLUDE THE REMOVAL OF EXISTING SLAB AT FIRST FLOOR EXI
|
|
Work on Floor(s): CEL,001
|
| 07/12/2017 |
123328577 |
01 |
A2 |
X SIGNED OFF |
10/04/2018 |
0023320 RA |
GOULD |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE
|
|
Work on Floor(s): CEL,001
|
| 04/21/2017 |
123083974 |
01 |
A2 |
R PERMIT-ENTIRE |
12/29/2017 |
0023320 RA |
GOULD |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION CONSISTING OF GENERAL CONSTRUCTION AS PER PLANS FILED
|
|
Work on Floor(s): CEL,001
|
| 05/05/2015 |
122352426 |
02 |
A2 |
P APPROVED |
05/15/2015 |
|
GOULD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 03/27/2015 |
122352426 |
01 |
A2 |
X SIGNED OFF |
06/17/2015 |
0023320 RA |
GOULD |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AND RELATED PLUMBING WORK AS PER PLANS FILED. NO CHANG
|
|
Work on Floor(s): 006
|
| 08/02/2010 |
120432727 |
01 |
A2 |
R PERMIT-ENTIRE |
11/01/2010 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
PARTITION AND PLUMBING WORK IN APT#9.ALL AS PER PLANS AND APPLICATIONS FIL
|
|
Work on Floor(s): 002
|
| 03/20/2008 |
110211645 |
01 |
A2 |
X SIGNED OFF |
11/26/2008 |
0028075 RA |
POMPEO |
|
NOT APPLICABLE
|
|
APPLICATION IS FILED FOR THE INKIND REPLACEMENT OF EXISTING PARAPETS AND L
|
|
Work on Floor(s): ROO
|
| 06/08/2004 |
103804652 |
01 |
A3 |
R PERMIT-ENTIRE |
06/11/2004 |
OT |
Duraku |
|
NOT APPLICABLE
|
|
Erect 40' of temporary heavy duty sidewalk shed 300 psf for protection dur
|
|
Work on Floor(s): 001
|
| 07/11/2003 |
103510531 |
01 |
A2 |
R PERMIT-ENTIRE |
08/19/2003 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
PARTITION & PLUMBING WORK IN EXISTING APARTMENT. ALL AS PER PLANS &
|
|
Work on Floor(s): 004,ROF
|
| 07/07/1998 |
101881386 |
01 |
A2 |
Q PERMIT-PARTIAL |
10/13/1998 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
PARTITION AND PLUMBING WORK IN EXISTING APARTMENT, ALL AS PER PLANS AND
|
|
Work on Floor(s): 004
|
| 07/15/1994 |
100868349 |
01 |
A2 |
R PERMIT-ENTIRE |
07/27/1994 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
INTERIOR PARTITONS REMOVED & REARRANGED, REMOVING & REPLACING EXISTING
|
|
Work on Floor(s): 2
|
| 11/02/1990 |
100137193 |
01 |
A2 |
Q PERMIT-PARTIAL |
11/16/1990 |
0006733 RA |
DAUB |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATION INCLUDING NEW PARTITIONS,FINISHES AND FIXTURES
|
|
Work on Floor(s): 1ST
|