| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/21/2023 |
121205702 |
11 |
A1 |
P APPROVED |
03/02/2023 |
|
DOYLE |
|
AMENDED 08/12/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 07/05/2022 |
121205702 |
10 |
A1 |
P APPROVED |
07/20/2022 |
|
DOYLE |
|
AMENDED 08/12/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 05/25/2022 |
121205702 |
09 |
A1 |
P APPROVED |
05/27/2022 |
|
DOYLE |
|
AMENDED 08/12/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 05/16/2022 |
121205702 |
08 |
A1 |
P APPROVED |
05/19/2022 |
|
DOYLE |
|
AMENDED 08/12/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 02/23/2022 |
121205702 |
07 |
A1 |
P APPROVED |
03/14/2022 |
|
DOYLE |
|
AMENDED 08/12/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 12/20/2021 |
121205702 |
06 |
A1 |
P APPROVED |
12/28/2021 |
|
DOYLE |
|
AMENDED 08/12/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 09/07/2021 |
140926700 |
03 |
A2 |
P APPROVED |
09/09/2021 |
|
MCERLEAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 006
|
| 08/30/2021 |
140926700 |
02 |
A2 |
P APPROVED |
08/31/2021 |
|
MCERLEAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 006
|
| 07/02/2021 |
121205702 |
05 |
A1 |
P APPROVED |
07/12/2021 |
0084716 PE |
KREMMIDA |
|
AMENDED 08/12/2021
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL
|
| 05/10/2021 |
121205702 |
04 |
A1 |
P APPROVED |
08/12/2021 |
|
DOYLE |
|
AMENDED 08/12/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 07/16/2020 |
140926700 |
01 |
A2 |
X SIGNED OFF |
03/31/2022 |
0079601 PE |
MCERLEAN |
|
NOT APPLICABLE
|
|
PARTIAL DEMOLITION ON FLOORS, SUB, CEL, 001-006, ROF, AS SHOWN ON PLANS.
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 006
|
| 06/16/2020 |
140913661 |
01 |
A3 |
X SIGNED OFF |
04/28/2022 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY ROOF / OVERHEAD PROTECTION AT ADJACENT PROPERTIE
|
|
Work on Floor(s): OSP
|
| 12/26/2019 |
121205702 |
03 |
A1 |
X SIGNED OFF |
09/13/2023 |
0090694 PE |
CERMAK |
|
AMENDED 08/12/2021
|
|
SUBSEQUENT FILING FOR SOE WORK, AS SHOWN ON PLANS.
|
|
Work on Floor(s): SUB
|
| 12/24/2019 |
121205702 |
02 |
A1 |
X SIGNED OFF |
09/13/2023 |
0084716 PE |
KREMMIDA |
|
AMENDED 08/12/2021
|
|
SUBSEQUENT FILING FOR FOUNDATION WORK, AS SHOWN ON PLANS.
|
|
Work on Floor(s): CEL
|
| 12/02/2019 |
123774727 |
02 |
A2 |
P APPROVED |
12/04/2019 |
|
DOYLE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 NON-STRUCTURAL DEMOLITION AND RESCONSTRUCTI
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 07/05/2019 |
121205702 |
01 |
A1 |
X SIGNED OFF |
09/13/2023 |
0014548 RA |
DOYLE |
|
AMENDED 08/12/2021
|
|
INTERIOR AND EXTERIOR RENOVATIONS TO EXISTING HOUSE OF WORSHIP ON SUB, CEL
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 06/27/2019 |
123774727 |
01 |
A2 |
X SIGNED OFF |
05/10/2022 |
0014548 RA |
DOYLE |
|
NOT APPLICABLE
|
|
NON-STRUCTURAL DEMOLITION AND RESCONSTRUCTION OF FIRE RATED MATERIAL ON
|
|
Work on Floor(s): SUB,CEL,MZ6,ROF 001 thru 006
|
| 08/23/2016 |
140539237 |
01 |
A3 |
X SIGNED OFF |
04/28/2017 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL COMPL
|
|
Work on Floor(s): OSP
|
| 08/23/2016 |
140539228 |
01 |
A3 |
X SIGNED OFF |
04/28/2017 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
| 07/28/2016 |
140527954 |
01 |
A2 |
R PERMIT-ENTIRE |
08/01/2016 |
0014908 RA |
COMPTON |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/10/2023 EXISTING WINDOW RESTORATION AT SOUTH FACADE, NO C
|
|
Work on Floor(s): FAC
|
| 03/16/2015 |
140321792 |
01 |
A2 |
X SIGNED OFF |
04/26/2017 |
0014908 RA |
TARTAGLI |
|
NOT APPLICABLE
|
|
REMOVAL OF STUCCO ON NORTH, EAST AND WEST FACADE AS INDICATED ON ATTACHED
|
|
Work on Floor(s): FAC
|
| 03/12/2015 |
122335400 |
01 |
A2 |
X SIGNED OFF |
11/10/2022 |
0088508 PE |
ANWAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF MANUAL & AUTOMATIC SMOKE/CO DETECTION FIRE ALARM SYSTEM.
|
|
Work on Floor(s): 001,002
|
| 10/30/2014 |
122181664 |
01 |
A2 |
X SIGNED OFF |
02/01/2016 |
0080457 PE |
WLADYKA |
|
NOT APPLICABLE
|
|
DIRECT REPLACEMENT OF A/C UNIT AS PER PLANS. NO CHANGE TO ZONING, USE, EG
|
|
Work on Floor(s): CEL
|
| 05/12/2014 |
121922991 |
03 |
A2 |
R PERMIT-ENTIRE |
05/08/2015 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/01/2022 REPLACE AND INSTALL PLUMBING FIXTURES ON SECOND F
|
|
Work on Floor(s): 002
|
| 02/20/2014 |
121922991 |
01 |
A2 |
R PERMIT-ENTIRE |
05/08/2015 |
0024830 RA |
EISNER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/01/2022 RENOVATE EXITING PRESCHOOL ON SECOND FLOOR. RELOC
|
|
Work on Floor(s): 002
|
| 02/20/2014 |
121922991 |
02 |
A2 |
R PERMIT-ENTIRE |
01/09/2015 |
0080959 PE |
CUONO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/01/2022 REINFORCE THIRD FLOOR BY INSTALLING STEEL BEAMS.
|
|
Work on Floor(s): 002
|
| 03/10/2010 |
120061930 |
02 |
PA |
P APPROVED |
03/18/2010 |
0016521 RA |
SUBEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 09/18/2009 |
120061930 |
01 |
PA |
U COMPLETED |
07/09/2010 |
0016521 RA |
SUBEN |
|
NOT APPLICABLE
|
|
Work on Floor(s): BAS
|
| 03/10/2008 |
110219219 |
01 |
A2 |
R PERMIT-ENTIRE |
03/26/2008 |
0064012 PE |
VALERIO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/01/2022 FILING TO REINFORCE BEAMS ON FIRST FLOOR STAGE NO
|
|
Work on Floor(s): 1 thru 2
|
| 10/12/2001 |
103017913 |
01 |
A2 |
Q PERMIT-PARTIAL |
10/31/2001 |
0063353 PE |
MORTMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/21/2023 INSTALL 18 NEW SPRINKLER HEADS AND NEW 3" FIRE SE
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 05/17/2001 |
102558563 |
01 |
A2 |
R PERMIT-ENTIRE |
05/22/2001 |
0007310 RA |
Westphal |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/01/2022 Replace existing 20 Tons Cooling Tower. No Change
|
|
Work on Floor(s): 001
|
| 11/01/2000 |
102783668 |
01 |
A2 |
R PERMIT-ENTIRE |
11/17/2000 |
0053541 PE |
Hahn |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/12/2023 Upgrade exist. fire suppression system, as shown
|
|
Work on Floor(s): 001
|
| 07/08/1998 |
101746835 |
02 |
A2 |
R PERMIT-ENTIRE |
05/18/1999 |
0019729 RA |
SHALAT |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/01/2022 RELOCATE EXISTING LAVATORY IN BASEMENT HANDICAP B
|
|
Work on Floor(s): BAS
|
| 07/08/1998 |
101746835 |
01 |
A2 |
R PERMIT-ENTIRE |
05/20/1999 |
0019729 RA |
SHALAT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/01/2022 INSTALLATION OF N E HANDICAP LIFT AND ACCESSIBLE
|
|
Work on Floor(s): BAS
|
| 02/28/1996 |
101270722 |
01 |
A2 |
R PERMIT-ENTIRE |
10/16/1997 |
0015870 RA |
GEORGOPO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 12/01/2022 REFURBISH EXISTING BATHROOMS & ENLARGE, MISC.PARTI
|
|
Work on Floor(s): BAS
|
| 10/12/1993 |
100716012 |
01 |
A3 |
R PERMIT-ENTIRE |
11/08/1993 |
0013685 RA |
BLOCH |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/01/2022 ROOF REPAIR AND REPLACEMENT.
|
|
Work on Floor(s): ROF
|
| 05/07/1993 |
100633637 |
01 |
A3 |
X SIGNED OFF |
11/21/2022 |
|
BRESLIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD 75' LONG BY 65' HIGH DURING FACADE REPAIR ON
|
|
Work on Floor(s): GRO
|
| 07/22/1992 |
100445449 |
01 |
A2 |
X SIGNED OFF |
11/23/1992 |
0012075 RA |
SCHWARZ |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING ENTRY AND VESTIBLE AS FOLLOWS: RELOCATE DOOR AND STEPS
|
|
Work on Floor(s): 1ST
|
| 05/15/1990 |
100045906 |
01 |
A3 |
X SIGNED OFF |
12/29/2022 |
|
BRESLIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHED 71 FEET ON EAST 74TH STREET.
|
|
Work on Floor(s): GR.
|
| 05/10/1990 |
100043490 |
01 |
A3 |
X SIGNED OFF |
11/21/2022 |
|
O,FARREL |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHED 20` ON WEST END AND 20` ON EAST END TOTAL 115`
|
|
Work on Floor(s): 001
|