 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/21/2011 |
120797815 |
02 |
A3 |
P APPROVED |
09/22/2011 |
|
PITERA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/18/2011 |
120797815 |
01 |
A3 |
X SIGNED OFF |
11/01/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION A PIPE SCAFFOLD AS PER PLAN AT 313 EAST 74 STREET. DURING REM
|
|
Work on Floor(s): OSP
|
| 02/09/2011 |
120597292 |
01 |
A2 |
X SIGNED OFF |
08/19/2013 |
0018403 RA |
SPADE |
|
GRANTED 05/16/2011
|
|
9'-0" ADDITION TO REAR OF 5-STORY BUILDING, EXTENDING EXISTING ROOMS. THE
|
|
Work on Floor(s): 001,002,003,004
|
| 03/30/2010 |
120160823 |
02 |
A2 |
M P/E PAA $ RESOLV |
04/05/2013 |
|
SPADE |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/16/2013 INTEIOR RENOVATION OF INSTALATION OF NEW 6 STOP R
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 10/19/2009 |
120160823 |
01 |
A2 |
R PERMIT-ENTIRE |
10/22/2010 |
0018403 RA |
SPADE |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AND EXTERIOR ADDITION FOR INSTALLATION OF NEW 6-STOP R
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/16/2003 |
103552772 |
01 |
A2 |
X SIGNED OFF |
07/28/2006 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE OIL BOILER WITH GAS BOILER AND REMOVE 275 GALLON OIL TANK. NO CHA
|
|
Work on Floor(s): CEL
|