| 04/20/2017 |
123081627 |
01 |
A3 |
R PERMIT-ENTIRE |
04/20/2017 |
0083149 PE |
ALAUDDIN |
|
NOT APPLICABLE
|
|
MINOR STUCCO REPAIR AND THOROCOAT AS PER DRAWINGS. NO CHANGE IN USE, OCCUP
|
|
Work on Floor(s): 001 thru 005
|
| 01/23/2012 |
120957232 |
01 |
A2 |
R PERMIT-ENTIRE |
02/16/2012 |
0010727 RA |
SCHMITT |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO APT. 4FW, MINOR INTERIOR PARTITIONS AND PLUMBING. N
|
|
Work on Floor(s): 004
|
| 10/01/2002 |
103079678 |
02 |
A2 |
P APPROVED |
12/23/2002 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/14/2002 |
102834569 |
03 |
A1 |
P APPROVED |
06/20/2002 |
0018533 RA |
PINNER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 5, ROF
|
| 05/24/2002 |
102834569 |
02 |
A1 |
G PAA FEE DUE |
05/24/2002 |
0018533 RA |
PINNER |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/14/2002
|
|
Work on Floor(s): 5, ROF
|
| 01/22/2002 |
103079678 |
01 |
A2 |
R PERMIT-ENTIRE |
01/31/2002 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE GAS HEATING BOILER (NYC BOILER #21796-01) AND INSTALL GAS
|
|
Work on Floor(s): CEL
|
| 02/17/2000 |
102834569 |
01 |
A1 |
X SIGNED OFF |
03/10/2003 |
0018533 RA |
PINNER |
|
NOT APPLICABLE
|
|
RENOVATE THTREE 3 APARTMENTS ON 5TH FLOO R WITH DUPLEX PENTHOUSE FOR EA
|
|
Work on Floor(s): 5, ROF
|
| 09/19/1994 |
100899459 |
01 |
A2 |
R PERMIT-ENTIRE |
10/12/1994 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING APT. 1RE NEW PARTITONS AND PLUMBING FIXTURES. NO CHA
|
|
Work on Floor(s): 1
|
| 11/10/1993 |
100731193 |
01 |
A2 |
Q PERMIT-PARTIAL |
11/22/1993 |
60500-1 PE |
WITTMANN |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING APARTMENT 2RW, NEW PAR TITIONS AND PLUMBING, NO CHANGE
|
|
Work on Floor(s): 2ND
|
| 05/07/1990 |
100037568 |
01 |
A2 |
X SIGNED OFF |
09/19/1990 |
0008205 RA |
GLECKMAN |
|
NOT APPLICABLE
|
|
PROPOSE TO RECONSTRUCT THE EXISTING FOUR APARTMENTS ON THE 5TH STORY.
|
|
Work on Floor(s): 5
|