 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 10/03/2018 |
140809150 |
PR |
I LAA SIGNED OFF |
06/06/2025 |
MP 000960 |
LAMARCA |
|
IN KIND REPLACEMENT OF KITCHEN SINK AND FAUCET TO EXISTING PIPING; RECONNE
|
|
Work on Floor(s): 011
|
| 08/01/2018 |
140789332 |
PR |
I LAA SIGNED OFF |
11/13/2018 |
MP 000954 |
MULLIGAN |
|
IN APT. 8D ON THE 8TH FLOOR REPLACE TO EXISTING ROUGHING 1 KITCHEN SINK,
|
|
Work on Floor(s): 8TH
|
| 06/19/2018 |
140776872 |
PR |
E LAA FILED |
06/19/2018 |
MP 000848 |
EURICH |
|
IN APT 2A ON THE 2ND FLOOR, IN THE BATHROOM, REPLACE TUB, TOILET AND LAV O
|
|
Work on Floor(s): 002
|
| 11/11/2016 |
140574741 |
PR |
I LAA SIGNED OFF |
06/13/2017 |
MP 001342 |
DISABATO |
|
IN APARTMENT 14C ON THE 14TH FLOOR REPLACE KITCHEN SINK AND DW ON NEW W/S
|
|
Work on Floor(s): 014
|
| 07/31/2015 |
121884498 |
PR |
I LAA SIGNED OFF |
10/03/2015 |
MP 001285 |
KOULLIAS |
|
SUPERSEDE APP #122289889 AND APP#140346249.ON EXISTING ROUGH IN REPLACE 1
|
|
Work on Floor(s): 010
|
| 05/11/2015 |
140346249 |
PR |
E LAA FILED |
05/11/2015 |
MP 001285 |
KOULLIAS |
|
REPLACE ON EXISTING ROUGHING ONE WATER CLOSET AND ONE LAVATORY. CONVERT ON
|
|
Work on Floor(s): 010
|
| 02/23/2015 |
122289889 |
PR |
E LAA FILED |
04/16/2015 |
MP 001671 |
TROMBETT |
|
ON 10TH FLOOR IN APARTMENT 10A REPLACE 1-TOILET, 1-BATHROOM SINK ON EXISTI
|
|
Work on Floor(s): 010
|
| 04/21/2014 |
140188570 |
PR |
I LAA SIGNED OFF |
08/06/2014 |
MP 001790 |
SANGIRAY |
|
REPLACE (1) TOILET (1) BATHROOM LAVATORY AND (1) BATHTUB ON EXISTING ROUGH
|
|
Work on Floor(s): 002
|
| 02/25/2013 |
110589792 |
PR |
E LAA FILED |
03/01/2013 |
MP 001356 |
BELLINI |
|
(1) 4" CONBRACO, 40-200, MEA# 451-04-M. INSTALLING (1) ONE BACKFLOW
|
|
Work on Floor(s): CEL
|
| 05/26/2011 |
110542440 |
PR |
I LAA SIGNED OFF |
09/26/2011 |
MP 000870 |
KAPLAN |
|
IN APT 7B ON 7TH FLOOR, REPLACE 2 SHOWER BODIES & INSTALL NEW CONTROL VALV
|
|
Work on Floor(s): 007
|
| 05/01/2006 |
102378909 |
PR |
I LAA SIGNED OFF |
07/10/2006 |
MP 000886 |
INWALD |
|
REPLACING AN OLD SINK, TOILET & TUB WITH NEW FIXTURES. THE TUB TO BE REPLA
|
| 02/25/2005 |
102370355 |
PR |
I LAA SIGNED OFF |
07/05/2005 |
MP 001341 |
TRAKTMAN |
|
1ST BATH REPL WATER CLOSET AND LAV ON THE EXISTING ROUGHNG 2ND BATH INSTAL
|
| 02/03/2005 |
102368821 |
PR |
I LAA SIGNED OFF |
02/28/2005 |
MP 001375 |
MINARIK |
|
FURNISH LABOR AND MATERIAL TO REPLACE APPROXIAMTELY 70' OF GAS PIPING FROM
|
|
Work on Floor(s): BAS,004
|
| 09/29/1997 |
101713022 |
PR |
I LAA SIGNED OFF |
02/18/1999 |
MP 000787 |
MATZEN |
|
REPLACE TWO (2) WATER CLOSETS, TWO ( 2) LAVATORIES ONE (1) BATHTUB & ONE (
|
| 03/11/1996 |
101222366 |
PR |
E LAA FILED |
03/11/1996 |
MP 000809 |
BURTON |
|
RELOCATE TOILET OVER 40" AND REPLACE TUB AND BASIN ON THE SAME ROUGHING.
|
| 10/25/1995 |
101137789 |
PR |
E LAA FILED |
10/25/1995 |
MP 001137 |
GOWIE |
|
JOB CLOSED 07 23 2024 INSTALL ONE ADDITIONAL FIXTURE (SHOWER STALL) IN APT
|
|
Work on Floor(s): 14
|