 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 10/02/2017 |
122594086 |
PR |
I LAA SIGNED OFF |
11/06/2017 |
MP 001608 |
STAVRIAN |
|
IN APT #6A ON THE 6TH FLOOR REPLACE TO EXISTING ROUGHING (1)TOILET, (1)LAV
|
|
Work on Floor(s): 006
|
| 09/26/2017 |
140699554 |
PR |
I LAA SIGNED OFF |
11/09/2017 |
MP 000872 |
DIETZ |
|
IN APARTMENT 6G ON THE 6TH FLOOR IN THE BATHROOM, WE WILL REPLACE A TUB WI
|
|
Work on Floor(s): 006
|
| 09/17/2017 |
140695629 |
PR |
I LAA SIGNED OFF |
07/26/2021 |
MP 000341 |
RUBENSTE |
|
REPLACEMENT OF NEW KITCHEN SINK FAUCET AND SPEEDY VALVES ON EXISTING ROUGH
|
|
Work on Floor(s): 006
|
| 09/12/2017 |
140693453 |
PR |
E LAA FILED |
09/12/2017 |
MP 001608 |
STAVRIAN |
|
JOB CLOSED 02 12 2018
|
|
Work on Floor(s): 006
|
| 03/30/2017 |
122324984 |
PR |
I LAA SIGNED OFF |
05/03/2017 |
MP 002373 |
MUJAHODZ |
|
IN APT #5F REPLACE KITCHEN SINK WITH WASHING MACHINE & REPLACE APPROX 4' O
|
|
Work on Floor(s): 005
|
| 04/19/2016 |
140485099 |
PR |
I LAA SIGNED OFF |
10/11/2016 |
MP 002406 |
MARTIN |
|
IN APT 10J ON 10TH FLOOR REPLACE ON EXISTING ROUGHING (1) KITCHEN SINK & (
|
|
Work on Floor(s): 010
|
| 08/04/2015 |
140385241 |
PR |
I LAA SIGNED OFF |
10/26/2015 |
MP 001332 |
VAGLICA |
|
BATHTUB TO SHOWER CONVERSION INSTALL NEW WATER PIPING FROM MAIN RISER TO
|
|
Work on Floor(s): 9TH
|
| 06/10/2015 |
140359305 |
PR |
I LAA SIGNED OFF |
07/31/2015 |
MP 001332 |
VAGLICA |
|
DIRECT REPLACEMENT TO EXISTING ROUGHING 1 TOILET, 1 LAVATORY, 1 BATHTUB, 1
|
|
Work on Floor(s): 9TH
|
| 02/10/2015 |
140310278 |
PR |
I LAA SIGNED OFF |
04/14/2015 |
MP 002316 |
SAMUEL |
|
REPLACEMENT OF 1 LAV, 1 TOILET AND 1 SHOWER ON EXISTING ROUGHING. ALL WORK
|
|
Work on Floor(s): 009
|
| 01/14/2015 |
140301206 |
PR |
I LAA SIGNED OFF |
04/14/2015 |
MP 002316 |
SAMUEL |
|
REPLACEMENT OF 1 LAV, 1 TOILET, 1 TUB ON THE EXISTING ROUGHING. IN APT 10A
|
|
Work on Floor(s): 010
|
| 12/13/2013 |
140144163 |
PR |
I LAA SIGNED OFF |
02/26/2014 |
MP 002184 |
SANTULLO |
|
RENEWAL OF LAA APPLICATION #110572265 EXPIRED MAY 2013 FOR INSTALLATION OF
|
|
Work on Floor(s): CEL
|
| 07/29/2013 |
140100897 |
PR |
E LAA FILED |
07/29/2013 |
MP 001350 |
HARVEY |
|
JOB CLOSED 02 12 2018
|
|
Work on Floor(s): 006
|
| 07/11/2013 |
140095199 |
PR |
I LAA SIGNED OFF |
09/11/2013 |
MP 001592 |
JOHNSON |
|
REPLACE 2 TOILETS,2 BASINS, 1 TUB, REPLACE 1 TUB WITH SHOWER.RUN 20 FEET 3
|
|
Work on Floor(s): 012
|
| 05/15/2012 |
110572265 |
PR |
E LAA FILED |
05/17/2012 |
MP 002184 |
MARCO-SA |
|
INSTALL TWO PRIMARY BACKFLOW DEVICES ON DOMESTIC AND FIRE LINES -1
|
|
Work on Floor(s): CEL
|
| 01/31/2012 |
110566370 |
PR |
I LAA SIGNED OFF |
06/26/2012 |
MP 001332 |
VAGLICA |
|
IN APT 6C ON THE 6TH FLOOR REPLACE TO EXISTING ROUGHING. 1 TOILET, 1 VANIT
|
|
Work on Floor(s): 006
|
| 03/29/2011 |
110534645 |
PR |
I LAA SIGNED OFF |
01/24/2012 |
MP 001332 |
VAGLICA |
|
IN 1ST BATHROOM REPLACE TO EXISTING ROUGHING (1)SHOWER (1)TOILET (1)LAVATO
|
|
Work on Floor(s): 011
|
| 01/24/2011 |
110527617 |
PR |
I LAA SIGNED OFF |
03/21/2011 |
MP 001669 |
TANELLA |
|
IN APT 11P ON THE 11TH FLOOR REPLACE (1) KITCHEN SINK ON EXISTING ROUGHING
|
|
Work on Floor(s): 011
|
| 01/05/2011 |
110526119 |
PR |
I LAA SIGNED OFF |
03/18/2011 |
MP 001286 |
PESCATOR |
|
INSTALL 40' OF 1/2" COPPER PIPE & FITTINGS W/NEW TILE STOPS& FIXTURE VALVE
|
|
Work on Floor(s): 012
|
| 08/12/2008 |
110234069 |
PR |
I LAA SIGNED OFF |
11/01/2018 |
MP 001592 |
JOHNSON |
|
1968,REPLACE HOT & COLD WATER LINED FROM EXISTING RISER,REPLACE 1 GAS STOV
|
|
Work on Floor(s): 012
|
| 02/28/2008 |
103876959 |
PR |
I LAA SIGNED OFF |
04/05/2008 |
MP 001332 |
VAGLICA |
|
REPLACE SHOWER, TOILET & SINK TO EXISTING ROUGHING. EXP DATE: 02/28/09.
|
|
Work on Floor(s): 009
|