 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 06/01/2018 |
140771458 |
PR |
E LAA FILED |
06/01/2018 |
MP 002200 |
DAYAN |
|
ON THE 17TH FLOOR IN APT#PHE,PERFORM FIXTURE REPLACEMENT ON EXISTING ROUGH
|
|
Work on Floor(s): 017
|
| 11/08/2017 |
140714751 |
PR |
E LAA FILED |
11/08/2017 |
MP 001399 |
JARKOW |
|
IN APT #16C ON THE 16TH FLOOR REPLACE & RELOCATE STOVE APPROX 3' & RUN APP
|
|
Work on Floor(s): 016
|
| 11/08/2017 |
140714742 |
PR |
E LAA FILED |
11/08/2017 |
MP 001399 |
JARKOW |
|
IN APT #16C ON THE 16TH FLOOR REPLACE (1)KITCHEN SINK & (1) DISHWASHER ON
|
|
Work on Floor(s): 016
|
| 08/16/2017 |
140682802 |
PR |
I LAA SIGNED OFF |
09/13/2017 |
MP 000620 |
KRAUS |
|
IN THE CELLAR,EXISTING LAUNDRY ROOM LISTED ON C OF O 114970, TO INSTALL 4
|
|
Work on Floor(s): CEL
|
| 08/11/2017 |
140681251 |
PR |
E LAA FILED |
08/11/2017 |
MP 001342 |
DISABATO |
|
IN APARTMENT 6E ON 6TH FLOOR, REPLACE TOILET, LAV AND TUB ON EXIST W/S ROU
|
|
Work on Floor(s): 006
|
| 06/02/2017 |
140651168 |
PR |
I LAA SIGNED OFF |
11/17/2017 |
MP 002200 |
DAYAN |
|
ON THE 16TH FLOOR IN APT#16H,PERFORM FIXTURE REPLACEMENT ON EXISTING ROUGH
|
|
Work on Floor(s): 016
|
| 04/21/2017 |
140632475 |
PR |
I LAA SIGNED OFF |
10/31/2019 |
MP 001490 |
LOMBARDO |
|
DIRECT REPLACE ON EXISTING ROUGHING(1) TOILET,(1) LAVATORY
|
|
Work on Floor(s): 016
|
| 02/24/2017 |
140610015 |
PR |
I LAA SIGNED OFF |
10/16/2018 |
MP 002406 |
MARTIN |
|
IN APT #6G ON THE 6TH FLOOR REPLACE TO EXISTING ROUGHING (1) TOILET, (1) L
|
|
Work on Floor(s): 006
|
| 10/04/2016 |
140558723 |
PR |
I LAA SIGNED OFF |
03/07/2017 |
MP 000872 |
DIETZ |
|
GAS TO GAS, NO GAS TEST REQUIRED.REPLACE (1) 3/4" GAS FLEX AFTER 3/4" SHUT
|
|
Work on Floor(s): 015
|
| 10/04/2016 |
140558670 |
PR |
I LAA SIGNED OFF |
03/16/2017 |
MP 000872 |
DIETZ |
|
IN APT.15H ON THE 15TH FLOOR REPLACE 1 KITCHEN SINK,1 DISHWASHER ON EXISTI
|
|
Work on Floor(s): 015
|
| 05/19/2016 |
140497781 |
PR |
I LAA SIGNED OFF |
10/04/2016 |
MP 000872 |
DIETZ |
|
IN APT.11A ON THE 11TH FLOOR REPLACE 1 KITCHEN SINK,1 W/C AND 1 LAV ON EXI
|
|
Work on Floor(s): 011
|
| 10/19/2015 |
140418251 |
PR |
I LAA SIGNED OFF |
03/14/2016 |
MP 000761 |
HELD |
|
BATHROOM: REPLACE (1) WC AND (1) LAVATORY ON EXISTING ROUGH-IN, REMOVE (1
|
|
Work on Floor(s): 008
|
| 09/04/2015 |
140399511 |
PR |
I LAA SIGNED OFF |
02/02/2016 |
MP 001790 |
SANGIRAY |
|
REPLACE (1) STOVE (1) SINK (1) TUB (1) LAVATORY AND (1) TOILET ON EXSITING
|
|
Work on Floor(s): 007
|
| 11/10/2014 |
140279099 |
PR |
I LAA SIGNED OFF |
02/13/2015 |
MP 001790 |
SANGIRAY |
|
REPLACE (2) LAVATORIES (2) TOILETS AND (2) TUBS ON EXISTING ROUGH IN APT 2
|
|
Work on Floor(s): 002
|
| 07/23/2014 |
140230275 |
PR |
I LAA SIGNED OFF |
11/25/2014 |
MP 001285 |
KOULLIAS |
|
REPLACE ON EXISTING ROUGHING TWO WATER CLOSETS, TWO LAVATORIES, ONE BATHTU
|
|
Work on Floor(s): PEN
|
| 04/15/2014 |
140186135 |
PR |
I LAA SIGNED OFF |
07/25/2014 |
OBI 005260 |
CAPUTO |
|
CHANGE GRADE OF OIL FROM #6 TO #4. INSTALL ANTI-SYPHON DEVICE ON SUPPLY LI
|
|
Work on Floor(s): CEL
|
| 01/15/2014 |
140153045 |
PR |
I LAA SIGNED OFF |
04/01/2014 |
MP 002080 |
HUCKEMEY |
|
TO REPLACE (1) BATHTUB, (1) TOILET, (1) BASIN, (1) KITCHEN SINK ALL AT EXI
|
|
Work on Floor(s): 4TH
|
| 12/10/2013 |
140142888 |
PR |
I LAA SIGNED OFF |
07/18/2014 |
MP 002080 |
HUCKEMEY |
|
TO REPLACE (1) KITCHEN SINK AND (1) TOILET ON EXISTING PIPING SAME LOCATIO
|
|
Work on Floor(s): 004
|
| 11/15/2011 |
110561730 |
PR |
J LAA DISAPPROVED |
11/17/2011 |
MP 000960 |
LAMARCA |
|
INSTALL (6) SALAMANDER TYPE HEATERS FOR TEMP HEAT. (1) IN CELLAR, (2) ON 1
|
|
Work on Floor(s): CEL 001 thru 004
|
| 02/06/1997 |
101413392 |
PR |
I LAA SIGNED OFF |
03/03/1997 |
MP 001567 |
WHELAN |
|
REPLACE TWO TOILETS, TWO SINKS & TUB ON EXISTING ROUGHING.
|