| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/05/2020 |
123573533 |
01 |
A2 |
R PERMIT-ENTIRE |
06/15/2020 |
0038763 RA |
MCDONALD |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE TOWNHOUSE. MINOR DEMOLITION AND CONSTRUCTI
|
|
Work on Floor(s): 001 thru 004
|
| 03/19/2011 |
110393930 |
12 |
A1 |
P APPROVED |
03/25/2011 |
|
COPE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 03/03/2011 |
110393930 |
11 |
A1 |
P APPROVED |
03/11/2011 |
|
COPE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 06/10/2010 |
110393930 |
10 |
A1 |
P APPROVED |
06/28/2010 |
0075607 PE |
MCCUTCHE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 05/21/2010 |
110393930 |
09 |
A1 |
D A/P ENTIRE |
05/25/2010 |
0075607 PE |
MCCUTCHE |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/04/2010
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 02/01/2010 |
110393930 |
08 |
A1 |
P APPROVED |
02/09/2010 |
0075607 PE |
MCCUTCHE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 12/02/2009 |
110393930 |
07 |
A1 |
P APPROVED |
12/14/2009 |
0075607 PE |
MCCUTCHE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/17/2009 |
110393930 |
06 |
A1 |
P APPROVED |
09/28/2009 |
0020105 RA |
COPE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/14/2009 |
120154698 |
01 |
A3 |
X SIGNED OFF |
04/13/2010 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS TO ORIGINATE FROM SIDEWALK S
|
|
Work on Floor(s): OSP
|
| 09/14/2009 |
120154652 |
01 |
A3 |
X SIGNED OFF |
04/14/2010 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 09/02/2009 |
120146387 |
01 |
A3 |
X SIGNED OFF |
08/17/2010 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 12 LINEAR FEET BY 54 FEET APPROXIMATE HEIGHT OF TUBULAR S
|
|
Work on Floor(s): 001
|
| 06/24/2009 |
110393930 |
05 |
A1 |
P APPROVED |
07/01/2009 |
|
FRIEDMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 06/17/2009 |
110393930 |
04 |
A1 |
P APPROVED |
07/08/2009 |
|
FRIEDMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 11/21/2008 |
110393930 |
01 |
A1 |
X SIGNED OFF |
03/25/2011 |
0020105 RA |
COPE |
|
NOT APPLICABLE
|
|
RENOVATION OF BUILDING TO CHANGE FROM MIX USE TO SINGLE FAMILY. WORK TO I
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 11/19/2008 |
110393930 |
03 |
A1 |
X SIGNED OFF |
03/25/2011 |
0069183 PE |
FRIEDMAN |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK ASSOCIATED WITH THE RENOVATION AND ENLARGEMENT OF EXISTING
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 11/19/2008 |
110393930 |
02 |
A1 |
X SIGNED OFF |
03/25/2011 |
0075607 PE |
MCCUTCHE |
|
NOT APPLICABLE
|
|
MECHANICAL, PL. & SPRINKLER WORK ASSOCIATED WITH THE RENOVATION AND ENLARG
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/29/2008 |
110345181 |
01 |
A2 |
X SIGNED OFF |
07/06/2009 |
0020105 RA |
COPE |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION OF EXISTING SINGLE FAMILY TRIPLEX UNIT. WORK TO INLCU
|
|
Work on Floor(s): 001 thru 003
|
| 09/29/2008 |
110345172 |
01 |
A2 |
X SIGNED OFF |
07/02/2009 |
0020105 RA |
COPE |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION OF EXISTING DOCTOR'S OFFICE. WORK TO INCLUDE REMOVAL
|
|
Work on Floor(s): CEL,BAS
|
| 05/21/1991 |
100254341 |
01 |
A2 |
R PERMIT-ENTIRE |
01/09/1992 |
0008205 RA |
GLECKMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/26/2010 INSTALL HVAC SYSTEM THROUGHOUT THE BLDG NEW HWH &
|
|
Work on Floor(s): C 1 thru 4
|