 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 09/28/2018 |
123563991 |
PR |
I LAA SIGNED OFF |
04/22/2019 |
MP 002028 |
CORBO |
|
REPLACE ON EXISTING ROUGHING (2) WATER CLOSETS, (2) LAVS & (1) TUB. REPLAC
|
|
Work on Floor(s): 002
|
| 06/11/2018 |
140774213 |
PR |
I LAA SIGNED OFF |
09/11/2018 |
MP 002331 |
FILA |
|
CAP AND REMOVE BATHTUB. REPLACING 3 FEET OF 2" NH PIPE, WITH 2" WYE CONNEC
|
|
Work on Floor(s): 024
|
| 01/16/2018 |
140731457 |
PR |
I LAA SIGNED OFF |
04/06/2018 |
MP 002028 |
CORBO |
|
IN APT #21A ON THE 21ST FLOOR REPLACE TO EXISTING ROUGHING (1) KITCHEN SIN
|
|
Work on Floor(s): 021
|
| 01/16/2018 |
140731439 |
PR |
I LAA SIGNED OFF |
04/06/2018 |
MP 002028 |
CORBO |
|
IN APT #21A ON THE 21ST FLOOR INSTALL (1) WASHING MACHINE & RUN APPROX 10'
|
|
Work on Floor(s): 021
|
| 08/24/2017 |
140686700 |
PR |
I LAA SIGNED OFF |
04/11/2019 |
MP 001512 |
LONG |
|
REPLACE ON EXISTING ROUGHING ONE KITCHEN SINK, ONE DISHWASHER AND ONE STOV
|
|
Work on Floor(s): 015
|
| 07/12/2017 |
140667384 |
PR |
I LAA SIGNED OFF |
08/01/2017 |
MP 000870 |
KAPLAN |
|
IN APARTMENT 7D ON THE 7TH FLOOR IN THE BATHROOM WE WILL REPLACE (1)TOILET
|
|
Work on Floor(s): 007
|
| 06/27/2017 |
140661317 |
PR |
I LAA SIGNED OFF |
11/09/2017 |
MP 001638 |
MEIMAROG |
|
IN APT 11D ON THE 11TH FLOOR. WE WILL REPLACE(2) TOILETS, (2) BATHROOM SIN
|
|
Work on Floor(s): 011
|
| 06/26/2017 |
140660513 |
PR |
I LAA SIGNED OFF |
10/19/2017 |
MP 002331 |
FILA |
|
REPLACING FIXTURES (2 TOILETS, 2 LAVATORIES, 2 BATHTUBS) ON EXISTING ROUGH
|
|
Work on Floor(s): 015
|
| 06/15/2017 |
122327785 |
PR |
I LAA SIGNED OFF |
09/12/2017 |
MP 001356 |
BELLINI |
|
WITHIN PANTRY OF APT 32C,LOCATED ON THE 32ND FLOOR,WE SHALL INSTALL NEW WA
|
|
Work on Floor(s): 032
|
| 02/16/2017 |
140607369 |
PR |
E LAA FILED |
02/16/2017 |
MP 001071 |
WEISS |
|
CHANGING THE BATHROOM FIXTURES ON EXISTING ROUGH.WATER CLOSET,LAVATORY,AND
|
|
Work on Floor(s): 011
|
| 02/15/2017 |
140606976 |
PR |
I LAA SIGNED OFF |
07/11/2018 |
MP 001884 |
NATKANIE |
|
RELOCATE WATER CLOSET AND LAVATORY IN BATH 1. RELOCATE WATER CLOSET AND
|
|
Work on Floor(s): 014
|
| 12/10/2016 |
140584302 |
PR |
E LAA FILED |
12/10/2016 |
MP 001638 |
MEIMAROG |
|
IN APT 9N ON THE 9TH FLOOR WE WILL REPLACE THE EXISTING BATHTUB WITH NEW
|
|
Work on Floor(s): 009
|
| 12/04/2016 |
140581733 |
PR |
I LAA SIGNED OFF |
03/25/2017 |
MP 002331 |
FILA |
|
CAP AND REMOVE BATHTUB. NEW STANDING SHOWER IN PLACE OF CAPPED BATHTUB. 5"
|
|
Work on Floor(s): 023
|
| 11/04/2016 |
140572182 |
PR |
E LAA FILED |
11/04/2016 |
FSC 000404 |
NEUHAUSE |
|
JOB CLOSED 02 07 2022
|
|
Work on Floor(s): GAR
|
| 11/04/2016 |
140572155 |
PR |
E LAA FILED |
11/04/2016 |
MP 001349 |
NEUHAUSE |
|
JOB CLOSED 03 30 2022
|
|
Work on Floor(s): GAR
|
| 02/16/2016 |
140459144 |
PR |
I LAA SIGNED OFF |
07/22/2016 |
MP 001839 |
MCMILLAN |
|
MASTER BEDROOM,TO REPLACE TOILET AND LAVATORY AND TO CHANGE TUB TO A SHOWE
|
|
Work on Floor(s): 027
|
| 08/05/2015 |
140386213 |
PR |
I LAA SIGNED OFF |
11/29/2015 |
MP 001268 |
ALTADONN |
|
INSTALL NEW WASHING MACHINE. INSTALL APPROXIMATELY 3' OF 2" NO HUB PIPING
|
|
Work on Floor(s): 021
|
| 07/21/2015 |
140378302 |
PR |
I LAA SIGNED OFF |
01/12/2016 |
MP 001464 |
MCFARLAN |
|
REPLACE FIXTURES IN TWO BATHROOMS AND KITCHEN ON EXISTING ROUGH-INS
|
|
Work on Floor(s): 015
|
| 05/21/2015 |
122295113 |
PR |
I LAA SIGNED OFF |
12/02/2015 |
MP 001268 |
ALTADONN |
|
RESTORATION OF GAS FOR COOKING PURPOSES IN 33 RESIDENTIAL UNITS. REPLACING
|
|
Work on Floor(s): CEL 033
|
| 02/04/2015 |
140308156 |
PR |
E LAA FILED |
02/04/2015 |
MP 001969 |
ARANDA |
|
IN APT#35A ON THE 35TH FL, DIRECT REPLACEMENT ON EXISTING ROUGHING:(3) TOI
|
|
Work on Floor(s): 035
|
| 01/21/2015 |
140303927 |
PR |
E LAA FILED |
01/21/2015 |
MP 001101 |
KOUMPARO |
|
DIRECT REPLACEMENT ON EXISTING ROUGHING 2- WATER CLOSETS, 2- LAVATORIES WI
|
|
Work on Floor(s): 2ND
|
| 12/04/2014 |
140288739 |
PR |
I LAA SIGNED OFF |
08/21/2015 |
MP 002253 |
MIRZO |
|
IN APT 17H ON THE 17TH FL REPLACE ON EXISTING ROUGHING (3) TOILETS, (3)LAV
|
|
Work on Floor(s): 017
|
| 11/12/2014 |
140280194 |
PR |
I LAA SIGNED OFF |
02/25/2015 |
MP 001671 |
TROMBETT |
|
IN APT # 16A, REPLACE IN EXISTING ROUGHING WITH NEW, THE FOLLOWING W/S FIX
|
|
Work on Floor(s): 016
|
| 10/28/2014 |
140273451 |
PR |
E LAA FILED |
10/28/2014 |
MP 001969 |
ARANDA |
|
IN APT#17G ON THE 17TH FL, DIRECT REPLACEMENT OF (1) TOILET (1) LAV (1)
|
|
Work on Floor(s): 017
|
| 10/13/2014 |
140267173 |
PR |
I LAA SIGNED OFF |
11/25/2014 |
MP 002331 |
FILA |
|
INSTALLATION OF SHUT OFF VALVES FOR THE BATHROOM. REPLACING SINK BASIN AND
|
|
Work on Floor(s): 022
|
| 08/04/2014 |
140235699 |
PR |
E LAA FILED |
08/04/2014 |
MP 001876 |
HEO |
|
DIRECT REPLACEMENT ON EXISTING ROUGHING 2-WATER CLOSET, 2-LAVATORY WITH FA
|
|
Work on Floor(s): 002
|
| 07/09/2014 |
140223434 |
PR |
E LAA FILED |
07/09/2014 |
MP 001762 |
BUONO |
|
DIRECT FIXTURE REPLACEMENT OF KITCHEN SINK, TOILET AND LAVATORY SINK. ADD
|
|
Work on Floor(s): 010
|
| 06/10/2014 |
140210386 |
PR |
I LAA SIGNED OFF |
10/07/2014 |
MP 001884 |
NATKANIE |
|
REPLACE SHOWER BODY, REPLACE TOILET AND SINK ON EXISTING LOCATION. REPLACE
|
|
Work on Floor(s): 002
|
| 05/14/2014 |
140198765 |
PR |
I LAA SIGNED OFF |
04/16/2015 |
MP 001483 |
MCMANUS |
|
REPLACEMENT OF TUB & SHOWER BODY, INSTALLATION OF 1 NEW KITCHEN SINK & DEC
|
|
Work on Floor(s): 7TH
|
| 05/05/2014 |
140194698 |
PR |
I LAA SIGNED OFF |
12/29/2014 |
MP 001671 |
TROMBETT |
|
ON 3RD FLOOR IN APT 3L IN BATHROOM WILL REPLACE TUB WITH SHOWER IN SAME LO
|
|
Work on Floor(s): 003
|
| 05/08/2013 |
140077164 |
PR |
E LAA FILED |
05/08/2013 |
MP 000699 |
CALIX |
|
REPLACE ON EXISTING ROUGHING FIXTURES IN 2 BATHROOMS, 1 POWDER ROOM, 1 KIT
|
| 03/04/2013 |
140059488 |
PR |
I LAA SIGNED OFF |
06/05/2013 |
MP 001268 |
ALTADONN |
|
FURNISH AND INSTALL NEW 6" DCDA CONBRACO MODEL # 4SG-600 ;MEA# 417-87-M V
|
|
Work on Floor(s): CEL
|
| 03/04/2013 |
140059479 |
PR |
I LAA SIGNED OFF |
05/24/2013 |
MP 001268 |
ALTADONN |
|
FURNISH AND INSTALL TWO (2) NEW 6" WILKINS MODEL # 475V RPZ; MEA# 468-99-M
|
|
Work on Floor(s): CEL
|
| 06/09/2012 |
110574067 |
PR |
I LAA SIGNED OFF |
06/28/2012 |
MP 000620 |
KRAUS |
|
IN APARTMENT 22B, TO RELOCATE EXISTING GAS GRILL ON TERRACE 10-FT USING 30
|
|
Work on Floor(s): 022
|
| 04/30/2012 |
140015392 |
PR |
I LAA SIGNED OFF |
10/01/2012 |
MP 001969 |
ARANDA |
|
AT 6TH FLOOR AT APT#6D, REPLACE (1) TOILET (1), LAVATORY SINK, (1) RESIDEN
|
|
Work on Floor(s): 006
|
| 04/07/2003 |
102274361 |
PR |
I LAA SIGNED OFF |
08/28/2003 |
MP 000620 |
KRAUS |
|
KIT,INSTALL FIXTURES ON EXISTING ROUGH. REROUGH WASTE,WATER & VENT IN POWE
|
|
Work on Floor(s): 005
|
| 04/12/2002 |
102159646 |
PR |
I LAA SIGNED OFF |
11/07/2002 |
MP 000945 |
BRESALIE |
|
MASTERBEDROOM REMOVE BATHROOM REROUGH FOR 2" WASTE FOR INSTALLATION OF SHO
|
|
Work on Floor(s): 020
|
| 05/18/2000 |
102023472 |
PR |
I LAA SIGNED OFF |
06/28/2000 |
MP 001524 |
CRITELLI |
|
REPLACED LEAKING SECTIONS OF GAS PIPING ON 22ND, 27TH, AND 30TH FLOORS.
|
|
Work on Floor(s): 22, 27, 30
|
| 09/15/1999 |
102038607 |
PR |
E LAA FILED |
09/15/1999 |
MP 008805 |
WESCOTT |
|
RELOCATE 1-LAVATORY & REPLACING EXISTING BATHTUB & WATER CLOSET
|
| 08/25/1999 |
102022428 |
PR |
E LAA FILED |
08/25/1999 |
MP 001110 |
ELENIS |
|
JOB CLOSED 07 25 2023 REPLACE ONE TUB, ONE SHOWER AND SHOWER BODY, TOW VAN
|