 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/30/2003 |
103096686 |
02 |
A2 |
P APPROVED |
08/13/2003 |
0018190 RA |
Eshkar |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 11/26/2002 |
103321996 |
01 |
A3 |
R PERMIT-ENTIRE |
12/06/2002 |
0654301 RA |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALALTION OF A SCAFFOLD, 50'X75' DURING FACADE REPAIR. NO
|
|
Work on Floor(s): GRD
|
| 02/20/2002 |
103103115 |
01 |
A3 |
R PERMIT-ENTIRE |
01/14/2003 |
|
O'FARREL |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SHED 50' DURING FACADE REPAIR. NO CHANGE
|
|
Work on Floor(s): GRD
|
| 02/14/2002 |
103096686 |
01 |
A2 |
X SIGNED OFF |
02/09/2004 |
0018190 RA |
Eshkar |
|
NOT APPLICABLE
|
|
Complete interior demolition. New Partitions, Plumbing and fixtures as per
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 10/28/1999 |
102424468 |
01 |
A2 |
X SIGNED OFF |
07/11/2002 |
0009252 RA |
KNAFO |
|
NOT APPLICABLE
|
|
REPLACE GAS BOILER. INSTALL NEW HOT WATER TANKLESS COIL
|
|
Work on Floor(s): CEL
|