BIS Menu  |  Applications   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
ARA / LAA Job Overview
Page: 1 of 1
Premises: 226 EAST 73 STREET MANHATTAN BIN: 1043975    Block: 1427    Lot: 30

To start overview at new date, select Month:   Day:   Year:  

FILE DATE JOB # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT
07/09/2018 140782455 PR I LAA SIGNED OFF 11/07/2018 MP 001638 MEIMAROG
 ON THE 3RD FLOOR IN APARTMENT 3CD WE WILL REPLACE ON THE EXISTING ROUGHING
 Work on Floor(s): 003

05/15/2018 140766428 PR I LAA SIGNED OFF 09/14/2018 MP 001790 SANGIRAY
 INSTALL APPROX 10FT OF 2" NHCI FOR WASTE AND VENT LINES AND APPROX 10FT OF
 Work on Floor(s): 011

12/31/2015 140445383 PR I LAA SIGNED OFF 02/04/2016 MP 002359 MORENO
 INSTALL ON EXISTING ROUGHING ONE (1) TOILET, ONE (1) SINK, ONE (1) BATHTUB
 Work on Floor(s): 011

12/04/2014 140288481 PR I LAA SIGNED OFF 12/23/2014 MP 001824 MICELI
 INSTALL NEW KITCHEN SINK ON EXISTING LOCATION ON EXISTING ROUGH
 Work on Floor(s): 002

04/14/2014 140185840 PR E LAA FILED 04/14/2014 MP 002025 POLADIAN
 JOB CLOSED 03 28 2019
 Work on Floor(s): 7TH

02/11/2014 140162142 PR I LAA SIGNED OFF 10/27/2014 MP 001332 VAGLICA
 BATHTUB TO SHOWER CONVERSATION, TOILET AND LAVATORY INSTALLED TO SAME LOCA
 Work on Floor(s): 011

01/17/2013 140049846 PR I LAA SIGNED OFF 03/27/2013 OBI 005270 SANTULLI
 REMOVAL OF SIDE ARM HEATERS AND INSTALLATION OF ANTI SIPHON VALVE IN CONNE
 Work on Floor(s): N/A

01/02/2013 140047143 PR E LAA FILED 01/02/2013 MP 000341 RUBENSTE
 INSTALLATION OF 2 NEW FIXTURES BATHTUB IN SAME LOCATION NEW WASHING MACH
 Work on Floor(s): 012

10/25/2012 140035799 PR I LAA SIGNED OFF 12/18/2012 OBI 005270 SANTULLI
 CONVERT EXISTING OIL BURNER FROM #6 OIL TO #4 OIL. PRIMARY OIL PREHEATER T
 Work on Floor(s): 001

10/01/2012 140031301 PR I LAA SIGNED OFF 03/18/2013 MP 001268 ALTADONN
 FURNISH AND INSTALL NEW 3" WATTS MODEL 909; MEA#145-83-M; AND 2" WATTS MO
 Work on Floor(s): CEL

09/12/2009 110274845 PR I LAA SIGNED OFF 12/28/2009 MP 001814 UGARKOVI
 REPLACE 1 BATH TUB WITH 1 SHOWER STALL. ALL WORK TO BE DONE IN PHA ON PENT
 Work on Floor(s): PEN

07/03/2002 102263239 PR E LAA FILED 07/03/2002 MP 000501 CAVALIER
 REPLACEMENT OF EXISTING BATHTUB AND WATERCLOSET. INSTALLATION OF A NEW WAS
 Work on Floor(s): 005

03/20/2002 102158665 PR E LAA FILED 03/20/2002 MP 001573 ANNUNZIA
 REPLACING BATHTUB WITH SHOWER IN APT#3E.
06/11/2001 102143271 PR E LAA FILED 06/11/2001 MP 000413 BRENNER
 REPLACE PLUMBING FIXTURES IN BATHROOM ON EXISTING ROUGHING ONE 1 WATER CLO
 Work on Floor(s): 001



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Applications