 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 06/21/2018 |
140777728 |
PR |
E LAA FILED |
06/21/2018 |
MP 002447 |
GUAMBI |
|
IN APARTMENT 11B ON THE 11TH FLOOR, IN THE BATHROOM WE WILL REPLACE TOILET
|
|
Work on Floor(s): 011
|
| 12/01/2014 |
140286571 |
PR |
I LAA SIGNED OFF |
12/17/2014 |
MP 001824 |
MICELI |
|
APT 2A LOCATED ON SECOND FLOOR CAP AND REMOVE: 1 GAS RANGE , 1 LAV , 1 W/C
|
|
Work on Floor(s): 002
|
| 11/15/2013 |
121653843 |
PR |
I LAA SIGNED OFF |
07/24/2014 |
MP 001549 |
DEMARINI |
|
INSTALLATION OF ONE 6" WILKINS 350DA, MEA#147-99-M DCD AND ONE 6" WILKINS
|
|
Work on Floor(s): CEL
|
| 11/15/2013 |
121653834 |
PR |
I LAA SIGNED OFF |
07/24/2014 |
MP 001549 |
DEMARINI |
|
INSTALLATION OF TWO 6" WILKINS 350DA, MEA#147-99-M DCD IN THE CELLAR. CONN
|
|
Work on Floor(s): CEL
|
| 04/03/2013 |
140067246 |
PR |
I LAA SIGNED OFF |
09/06/2013 |
OBI 001509 |
BENDJOUY |
|
CHANGE GRADE OF FUEL FROM #6 OIL TO #4 OIL. WE WILL REMOVE THE PRE-HEATER
|
|
Work on Floor(s): BAS
|