 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/16/2020 |
140991354 |
01 |
A2 |
X SIGNED OFF |
04/30/2021 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
DOOR INSTALLATION FOR APARTMENTS 3 AND 4 TO REMOVE ECB VIOLATION 39022900X
|
|
Work on Floor(s): 001
|
| 07/14/2014 |
140225003 |
01 |
A3 |
X SIGNED OFF |
04/08/2015 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 07/14/2014 |
140224996 |
01 |
A3 |
X SIGNED OFF |
04/08/2015 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE I
|
|
Work on Floor(s): OSP
|
| 04/12/2013 |
120476724 |
02 |
A2 |
P APPROVED |
05/06/2013 |
|
JUST |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 09/20/2010 |
120476724 |
01 |
A2 |
R PERMIT-ENTIRE |
07/10/2015 |
0018270 RA |
JUST |
Y |
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION ANS STRUCTURAL WORK AT CELLAR AND 1ST FLOOR INDICATED
|
|
Work on Floor(s): CEL,001
|