 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/13/2018 |
122815025 |
01 |
A2 |
P APPROVED |
12/04/2018 |
0020227 RA |
BRANDT |
|
NOT APPLICABLE
|
|
EXTERIOR ALTERATIONS OF THE AREAWAY STEPS AND ASSOCIATED WITH IT ARCHITECT
|
|
Work on Floor(s): OSP
|
| 12/17/1997 |
101484993 |
04 |
A1 |
P APPROVED |
12/23/1997 |
0012475 RA |
DIDONNO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 12/11/1997 |
101484993 |
03 |
A1 |
D A/P ENTIRE |
12/15/1997 |
0012475 RA |
DIDONNO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/23/1997
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 06/13/1997 |
101484993 |
02 |
A1 |
X SIGNED OFF |
10/10/2000 |
0070920 PE |
D'ANTONI |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW GAS FURNACE HEATING AND AIR CONDITIONING UNITS ON RO
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 03/25/1997 |
101484993 |
01 |
A1 |
X SIGNED OFF |
10/10/2000 |
0012475 RA |
DIDONNO |
|
NOT APPLICABLE
|
|
THE SCOPE SHALL INCLUDE MISC.DEMOLITION, FRAMING,PARTITIONS,MECHANICAL A
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|