 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/06/2021 |
123189272 |
07 |
A1 |
P APPROVED |
06/07/2021 |
|
DOHERTY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 08/16/2019 |
140864955 |
01 |
A3 |
P APPROVED |
08/16/2019 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
FACADE SSP FILED IN CONJUNCTION WITH BIS APPLICATION #123753991. NO WORK,
|
|
Work on Floor(s): FAC
|
| 06/19/2019 |
123753991 |
01 |
A2 |
X SIGNED OFF |
01/29/2021 |
0058291 PE |
EPSTEIN |
|
NOT APPLICABLE
|
|
FACADE REPAIRWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS,
|
|
Work on Floor(s): FAC
|
| 02/13/2019 |
123189272 |
06 |
A1 |
P APPROVED |
03/05/2019 |
|
DOHERTY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 08/13/2018 |
123189272 |
05 |
A1 |
P APPROVED |
08/27/2018 |
|
DOHERTY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 08/03/2018 |
123189272 |
04 |
A1 |
P APPROVED |
08/08/2018 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL
|
| 06/29/2018 |
123189272 |
03 |
A1 |
P APPROVED |
07/03/2018 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL
|
| 03/14/2018 |
123218320 |
01 |
A2 |
R PERMIT-ENTIRE |
05/24/2018 |
0074657 PE |
FISKAA |
|
NOT APPLICABLE
|
|
INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION FIRE ALARM SYSTEM
|
|
Work on Floor(s): CEL,001
|
| 03/14/2018 |
123387593 |
02 |
A2 |
R PERMIT-ENTIRE |
04/04/2018 |
0074657 PE |
FISKAA |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK PERTAINING TO COMMERCIAL BUILD OUT.
|
|
Work on Floor(s): CEL,001
|
| 03/14/2018 |
123387593 |
01 |
A2 |
R PERMIT-ENTIRE |
04/04/2018 |
0025177 RA |
LANGAN |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION INCLUDING THE REMOVAL AND INSTALLATION OF INTERIOR,
|
|
Work on Floor(s): CEL,001
|
| 03/14/2018 |
123387584 |
01 |
A2 |
R PERMIT-ENTIRE |
04/11/2018 |
0074657 PE |
FISKAA |
|
NOT APPLICABLE
|
|
SPRINKLER WORK PERTAINING TO COMMERCIAL BUILD OUT. NO CHANGE IN USE, EGRES
|
|
Work on Floor(s): CEL,001
|
| 01/18/2018 |
123197030 |
01 |
A2 |
R PERMIT-ENTIRE |
01/19/2018 |
0018172 RA |
DOHERTY |
|
NOT APPLICABLE
|
|
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FI
|
|
Work on Floor(s): 001
|
| 01/10/2018 |
123189272 |
02 |
A1 |
R PERMIT-ENTIRE |
04/26/2018 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
ALTERATION 1. REMOVAL OF WATER, SANITARY AND GAS PIPING. INSTALLATION OF W
|
|
Work on Floor(s): CEL
|
| 01/10/2018 |
123189272 |
01 |
A1 |
R PERMIT-ENTIRE |
09/10/2018 |
0018172 RA |
DOHERTY |
|
NOT APPLICABLE
|
|
CREATION OF ACCESSORY TENANT FITNESS ROOMS ON SECOND FLOOR VIA INTERIOR
|
|
Work on Floor(s): 002
|
| 01/10/2018 |
123189263 |
01 |
A2 |
R PERMIT-ENTIRE |
01/12/2018 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
(3) NEW FLOOR CONTROL VALVES IN CELLAR, AND (14) NEW SPRINKLER HEADS ON 2N
|
|
Work on Floor(s): 002,CEL
|
| 05/16/2017 |
121831269 |
02 |
A2 |
P APPROVED |
08/15/2018 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 ORIGINAL DESCRIPTION:HEREWITH FILED REVISED
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 020
|
| 01/30/2017 |
123008164 |
01 |
A2 |
X SIGNED OFF |
05/02/2017 |
0016698 RA |
HAYES |
|
NOT APPLICABLE
|
|
REMOVAL AND DISPOSAL OF INTERIOR PARTITIONS, DOORS, CEILINGS AND FINISHES
|
|
Work on Floor(s): BAS,GRD
|
| 11/10/2016 |
122839633 |
02 |
A2 |
R PERMIT-ENTIRE |
11/17/2016 |
0064095 PE |
MURRAY |
|
NOT APPLICABLE
|
|
FILING FOR TEMPORARY SHORING. WORK TO INCLUDE SELECTED DEMOLITION/REMOVAL
|
|
Work on Floor(s): CEL,001
|
| 11/10/2016 |
122839633 |
01 |
A2 |
R PERMIT-ENTIRE |
04/06/2017 |
0073701 PE |
MOKRIS |
|
NOT APPLICABLE
|
|
FILING FOR REPLACEMENT INSTALLATION OF LP STEAM ABSORPTION CHILLER AND PUM
|
|
Work on Floor(s): CEL,001
|
| 10/19/2015 |
122558188 |
01 |
A2 |
X SIGNED OFF |
12/14/2015 |
0051702 PE |
DELORENZ |
|
NOT APPLICABLE
|
|
LEGAL FOUR TON AIR CONDITIONING UNIT FOR ELEVATOR MACHINE ROOM.
|
|
Work on Floor(s): ROF
|
| 08/20/2014 |
122107111 |
01 |
A3 |
R PERMIT-ENTIRE |
08/20/2014 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD FOR FACADE REPAIR AT ROOF LEVEL AND TERRACES AS P
|
|
Work on Floor(s): OSP
|
| 12/18/2013 |
121831269 |
01 |
A2 |
R PERMIT-ENTIRE |
07/07/2014 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
ORIGINAL DESCRIPTION:HEREWITH FILED REVISED DRAWINGS PER FIRE DEPT. REQUIR
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 020
|
| 02/12/2013 |
140055286 |
01 |
A3 |
X SIGNED OFF |
08/09/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 01/25/2013 |
121507636 |
01 |
A2 |
X SIGNED OFF |
10/29/2014 |
0058291 PE |
EPSTEIN |
|
NOT APPLICABLE
|
|
EXTERIOR REPAIRWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS, USE
|
|
Work on Floor(s): 001 thru 021
|
| 07/11/2012 |
120493082 |
03 |
A2 |
P APPROVED |
11/15/2012 |
|
CHETRIT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL
|
| 12/30/2011 |
120494090 |
02 |
A2 |
P APPROVED |
01/27/2012 |
|
CHETRIT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 09/16/2011 |
120727981 |
02 |
A2 |
D A/P ENTIRE |
09/19/2011 |
|
WALSH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF NEW SEPARATE MANUAL, AUTOMA
|
|
Work on Floor(s): CEL,001
|
| 06/21/2011 |
120727981 |
01 |
A2 |
R PERMIT-ENTIRE |
07/26/2011 |
0025292 RA |
WALSH |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW SEPARATE MANUAL, AUTOMATIC SMOKE DETECTION & SP FA SYS
|
|
Work on Floor(s): CEL,001
|
| 10/06/2010 |
120494090 |
01 |
A2 |
X SIGNED OFF |
07/16/2013 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
SPRINKLER MODIFICATIONS ON THE CELLAR LEVEL AS INDICATED ON DRAWINGS. NO C
|
|
Work on Floor(s): CEL
|
| 10/05/2010 |
120493082 |
01 |
A2 |
X SIGNED OFF |
12/17/2012 |
0019078 RA |
KRACAUER |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION MODIFICATIONS TO THE CELLAR LEVEL AS INDICATED ON DRA
|
|
Work on Floor(s): CEL
|
| 10/05/2010 |
120493082 |
02 |
A2 |
X SIGNED OFF |
12/17/2012 |
0052439 PE |
CHETRIT |
|
NOT APPLICABLE
|
|
MECHANICAL & PLUMBING MODIFICATIONS TO THE CELLAR AS INDICATED ON DRAWINGS
|
|
Work on Floor(s): CEL
|
| 08/12/2010 |
120372603 |
05 |
A2 |
P APPROVED |
09/03/2010 |
|
CORWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001
|
| 08/11/2010 |
120372603 |
04 |
A2 |
P APPROVED |
09/07/2010 |
|
WONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 06/08/2010 |
120372603 |
03 |
A2 |
X SIGNED OFF |
10/05/2010 |
0646016 PE |
DANN |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK ASSOCAITED WITH NEW CONVENIENCE STAIR OPENING AT 1ST FLOOR
|
|
Work on Floor(s): CEL,001
|
| 06/08/2010 |
120372603 |
02 |
A2 |
X SIGNED OFF |
10/05/2010 |
0823641 PE |
CORWIN |
|
NOT APPLICABLE
|
|
HVAC AND PLUMBING WORK IN CONJUNCTION WITH NEW COMMERCIAL BUILDOUT.
|
|
Work on Floor(s): CEL,001
|
| 06/08/2010 |
120372603 |
01 |
A2 |
X SIGNED OFF |
10/05/2010 |
0021665 RA |
WONG |
|
NOT APPLICABLE
|
|
RETAIL RENOVATION TO INCLUDE DEMOLITION AND GENERAL CONSTRUCTION TO INCLUD
|
|
Work on Floor(s): CEL,001
|
| 04/07/2006 |
104400596 |
01 |
A2 |
R PERMIT-ENTIRE |
04/26/2006 |
0073243 PE |
Flynn |
|
NOT APPLICABLE
|
|
Install 2 cell cooling tower on roof. No change in use, egress or occupan
|
|
Work on Floor(s): ROF
|
| 04/07/2006 |
104400596 |
02 |
A2 |
R PERMIT-ENTIRE |
04/26/2006 |
0064012 PE |
Valerio |
|
NOT APPLICABLE
|
|
Structural modifications in conjunction with the installation of new cooli
|
| 09/11/2002 |
103258582 |
01 |
SG |
X SIGNED OFF |
01/28/2021 |
0020822 RA |
ILL |
|
NOT APPLICABLE
|
|
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN
|
|
Work on Floor(s): 001
|
| 09/11/2002 |
103258573 |
01 |
SG |
X SIGNED OFF |
01/28/2021 |
0020822 RA |
ILL |
|
NOT APPLICABLE
|
|
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN
|
|
Work on Floor(s): 001
|