| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/23/2017 |
121223675 |
01 |
A2 |
X SIGNED OFF |
08/05/2020 |
0089113 PE |
COLLINS |
|
NOT APPLICABLE
|
|
REPLACEMENT OF THE FACP FOR AN EXISTING APPROVED FIRE ALARM SYSTEM IN ACCO
|
|
Work on Floor(s): CEL
|
| 05/10/2017 |
123095658 |
01 |
A2 |
X SIGNED OFF |
04/25/2018 |
0018105 RA |
ARNTSEN |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR
|
|
Work on Floor(s): FAC
|
| 02/21/2017 |
140608439 |
01 |
A3 |
R PERMIT-ENTIRE |
02/24/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2014 BU
|
|
Work on Floor(s): OSP
|
| 10/24/2016 |
140566714 |
01 |
A3 |
R PERMIT-ENTIRE |
10/19/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BU
|
|
Work on Floor(s): OSP
|
| 12/17/2014 |
122194589 |
01 |
A2 |
X SIGNED OFF |
09/22/2016 |
0014327 RA |
ZIMMERMA |
|
NOT APPLICABLE
|
|
REPLACEMENT OF EXISTING PIPE INSULATION AND DUCTWORK REPLACEMENT OF MOISTU
|
|
Work on Floor(s): CEL 001 thru 013
|
| 06/16/2014 |
122018280 |
01 |
A2 |
P APPROVED |
11/24/2014 |
0014327 RA |
ZIMMERMA |
|
NOT APPLICABLE
|
|
REPLACE EXISTING GATE AND FENCE WITH NEW. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): OSP
|
| 03/25/2013 |
121574750 |
01 |
A2 |
X SIGNED OFF |
12/30/2013 |
0034322 RA |
LU |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF AN EXISTING RESIDENTIAL SPACE AS PER PLANS FILED
|
|
Work on Floor(s): 008
|
| 12/22/2011 |
104128347 |
08 |
A2 |
P APPROVED |
12/29/2011 |
|
MASS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 11/22/2011 |
104812151 |
02 |
A2 |
P APPROVED |
08/22/2013 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 014
|
| 11/15/2010 |
104128347 |
07 |
A2 |
P APPROVED |
11/19/2010 |
|
Mass |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 08/11/2010 |
104128347 |
06 |
A2 |
P APPROVED |
10/07/2010 |
|
Mass |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 03/09/2010 |
120145280 |
03 |
A2 |
P APPROVED |
04/14/2010 |
|
HANINGTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 009
|
| 09/01/2009 |
120145280 |
02 |
A2 |
X SIGNED OFF |
06/03/2011 |
0041708 PE |
HANINGTO |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLERS FOR APT RENO ALL AS PER PLANS FILED HEREWITH .
|
|
Work on Floor(s): 009
|
| 09/01/2009 |
120145280 |
01 |
A2 |
X SIGNED OFF |
06/03/2011 |
0041708 PE |
HANINGTO |
|
NOT APPLICABLE
|
|
REMOVAL & INSTALLATION OF NON LOAD BEARING PARTITIONS & RELATED FINISHES,
|
|
Work on Floor(s): 009
|
| 01/08/2009 |
104128347 |
05 |
A2 |
P APPROVED |
01/14/2009 |
|
Mass |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 12/04/2008 |
110418325 |
02 |
A2 |
X SIGNED OFF |
02/17/2010 |
0074933 PE |
DESIMONE |
|
NOT APPLICABLE
|
|
FILING HEREWITH STRUCTURAL DRAWINGS FOR RENOVATION OF ROOF TERRACE.
|
|
Work on Floor(s): ROF
|
| 12/04/2008 |
110418325 |
01 |
A2 |
X SIGNED OFF |
02/17/2010 |
0012761 RA |
RUBIN |
|
NOT APPLICABLE
|
|
. RAISE TERRACE LEVEL AROUND TUB ON STRUCTURAL
|
|
Work on Floor(s): ROF
|
| 10/30/2008 |
104128347 |
04 |
A2 |
P APPROVED |
11/06/2008 |
|
Mass |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 08/01/2008 |
103993966 |
06 |
A1 |
P APPROVED |
01/27/2014 |
|
FARINELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 06/26/2008 |
110229841 |
01 |
A2 |
X SIGNED OFF |
04/29/2009 |
0024458 RA |
FARINELL |
|
NOT APPLICABLE
|
|
REPLACEMENT OF THE EXIST'G SIDEWALK AT 823 PARK AVENUE. NO CHANGE IN USE (
|
|
Work on Floor(s): 1
|
| 06/26/2008 |
110229841 |
02 |
A2 |
X SIGNED OFF |
04/29/2009 |
0074933 PE |
DESIMONE |
|
NOT APPLICABLE
|
|
SIDEWALK REPLACEMENT. SCOPE TO INCLUDE, STRUCTURAL FRAMING, METAL DECKING
|
|
Work on Floor(s): 1
|
| 01/07/2008 |
103993966 |
05 |
A1 |
P APPROVED |
04/10/2008 |
0024458 RA |
FARINELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 10/04/2007 |
104128347 |
03 |
A2 |
P APPROVED |
10/24/2007 |
0028355 PE |
Mass |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 09/26/2007 |
104909048 |
01 |
A3 |
P APPROVED |
02/08/2008 |
0024456 RA |
FARINELL |
|
NOT APPLICABLE
|
|
FIRE PROTECTION PLAN IN CONJUNCTION WITH MAJOR ALTRATION OF BUILDING
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 09/10/2007 |
104026304 |
02 |
A2 |
J P/E DISAPPROVED |
09/20/2007 |
0028355 PE |
MASS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/05/2007
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 012
|
| 07/10/2007 |
103993966 |
04 |
A1 |
P APPROVED |
07/16/2007 |
0024458 RA |
FARINELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 07/06/2007 |
104128347 |
02 |
A2 |
P APPROVED |
10/03/2007 |
0028355 PE |
Mass |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PEN 001 thru 012
|
| 06/25/2007 |
104812151 |
01 |
A2 |
X SIGNED OFF |
10/11/2013 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER ALARM/SMOKE DETECTION SYSTEM AS PER PLAN FILED
|
|
Work on Floor(s): CEL,ROF 001 thru 014
|
| 07/18/2006 |
104488225 |
01 |
A3 |
X SIGNED OFF |
03/22/2011 |
OT |
O'FARREL |
|
NOT APPLICABLE
|
|
INSTALLATION OF A PLYWOOD-FENCE 33' LONG BY 4' WIDE DURING FACADE REPAIR.
|
|
Work on Floor(s): 001
|
| 03/08/2006 |
103993966 |
03 |
A1 |
P APPROVED |
04/06/2006 |
0024458 RA |
FARINELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 07/11/2005 |
104128347 |
01 |
A2 |
X SIGNED OFF |
06/13/2013 |
0028355 PE |
MASS |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HVAC SYSTEM, ASSOCIATED DUCTWORK AND AIR HANDLI
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 04/20/2005 |
104088693 |
01 |
A3 |
X SIGNED OFF |
04/20/2009 |
0060591 PE |
SHAPIRO |
|
NOT APPLICABLE
|
|
INSTALLATION OF ALIMAK 28/37 TD PERSONNEL/ MATERIAL HOIST 175' HIGH DURING
|
|
Work on Floor(s): 001
|
| 04/19/2005 |
104088700 |
01 |
A3 |
X SIGNED OFF |
04/20/2009 |
0060591 PE |
SHAPIRO |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD 130' LONG X 150' HIGH DURING BUILDING RENOVATIO
|
|
Work on Floor(s): 001
|
| 03/15/2005 |
104060034 |
01 |
A3 |
X SIGNED OFF |
05/07/2009 |
OT |
O'FARREL |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SIDEWALK SHED 230' DURING BUILDING RENOVATION. NO CHANGE
|
|
Work on Floor(s): 001
|
| 02/04/2005 |
104026304 |
01 |
A2 |
X SIGNED OFF |
10/16/2013 |
0028355 PE |
MASS |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF SPRINKLER SYSTE M AND PLUMBING FOR SPRINKLER CO
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 012
|
| 12/20/2004 |
103993966 |
02 |
A1 |
X SIGNED OFF |
03/28/2014 |
0074933 PE |
DESIMONE |
|
NOT APPLICABLE
|
|
PROPOSING NEW STRUCTURAL STEEL AND REIN- FORCED CONCRETE FOR NEW SCISSOR
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 12/20/2004 |
103993966 |
01 |
A1 |
X SIGNED OFF |
03/28/2014 |
0024458 RA |
FARINELL |
|
NOT APPLICABLE
|
|
RENOVATION OF ENTIRE BUILDING NEW SCISSO R STAIR ELEVATOR SHAFTS ENLARGE
|
|
Work on Floor(s): CEL,ROF 001 thru 013
|
| 12/07/2004 |
103987946 |
01 |
A3 |
X SIGNED OFF |
03/01/2011 |
0078402 PE |
Blinn |
|
NOT APPLICABLE
|
|
Erect temporary scaffold 60 x 170 on Park Ave. & 100' x 170' tall in walkw
|
|
Work on Floor(s): 001
|
| 12/02/2004 |
103985742 |
01 |
A2 |
X SIGNED OFF |
12/15/2011 |
0026250 RA |
Alwari |
|
NOT APPLICABLE
|
|
Herewith filing for repair and restoration of all facades to existing buil
|
|
Work on Floor(s): PEN 001 thru 012
|
| 11/24/2004 |
103980710 |
01 |
A3 |
X SIGNED OFF |
03/22/2011 |
OT |
Hama |
|
NOT APPLICABLE
|
|
Erect 168' of Temporary Heavy Duty Sidewalk Shed 300 psf for protection du
|
|
Work on Floor(s): 001
|