 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 04/05/2016 |
140479346 |
PR |
I LAA SIGNED OFF |
05/06/2016 |
MP 001350 |
HARVEY |
|
ON 9TH.FLOOR IN APT.9A,REPLACE ONE EXISTING KITCHEN SINK ON ITS EXISTING
|
|
Work on Floor(s): 009
|
| 03/09/2016 |
140468072 |
PR |
I LAA SIGNED OFF |
06/07/2016 |
MP 001972 |
ELENIS |
|
REPLACE EXISTING (WITH NEW) HOT & COLD WATER BRANCH PIPING AND DRAIN & VEN
|
|
Work on Floor(s): 015
|
| 04/29/2015 |
140340824 |
PR |
I LAA SIGNED OFF |
08/06/2015 |
MP 001667 |
CHEUNG |
|
REPLACE TWO TOILETS, TWO LAVATORIES, ONE SHOWER, ONE BATHTUB, ONE KITCHEN
|
|
Work on Floor(s): 010
|
| 12/04/2014 |
140288622 |
PR |
I LAA SIGNED OFF |
12/19/2014 |
OBI 005270 |
SANTULLI |
|
CA172798 NOTIFICATION OF FUEL GRADE CHANGE FROM #6 OIL TO #4 OIL. WE WILL
|
|
Work on Floor(s): CEL
|
| 07/02/2014 |
140220810 |
PR |
I LAA SIGNED OFF |
05/15/2015 |
MP 000761 |
HELD |
|
REPLACE 1 PC LAVATORY AND 1 PC WATER CLOSET ON EXISTING ROUGHING.
|
|
Work on Floor(s): 016
|
| 03/04/2014 |
140168841 |
PR |
I LAA SIGNED OFF |
05/21/2014 |
MP 001592 |
JOHNSON |
|
REPLACE 2 TOILETS,2 BASINS,1 KITCHEN SINK,1 STOVE,1 DISHWASHER EXISTING
|
|
Work on Floor(s): 6TH
|
| 11/13/2013 |
140134370 |
PR |
I LAA SIGNED OFF |
01/14/2014 |
OBI 005270 |
SANTULLI |
|
CONVERTING FROM #6 OIL BOILER TO #4 OIL. REMOVAL OF SIDE ARM HEATER.
|
|
Work on Floor(s): N/A
|
| 05/17/2013 |
121484081 |
PR |
E LAA FILED |
07/10/2013 |
MP 001483 |
MCMANUS |
|
INSTALL 2 INCH ANSUL (EMERGENCY SHUT-OFF) VALVE
|
|
Work on Floor(s): CEL
|
| 03/14/2013 |
140062198 |
PR |
I LAA SIGNED OFF |
06/05/2013 |
MP 001110 |
ELENIS |
|
IN APT. 17C ON THE 17TH FLOOR, KITCHEN : REPLACE 1 SINK, 1 FAUCET ON EXIST
|
|
Work on Floor(s): 017
|
| 12/10/2012 |
140043423 |
PR |
I LAA SIGNED OFF |
02/04/2013 |
MP 001354 |
QUATTLAN |
|
INSTALL (1) 4" WILKINS 375 MEA# 6-99-M & (1) 4" WILKINS 350 DA 147-99-M IN
|
|
Work on Floor(s): CEL
|
| 05/03/1999 |
102006758 |
PR |
E LAA FILED |
05/03/1999 |
MP 000728 |
GERAKARI |
|
DIRECT REPLACEMENT OF SINK, TOILET AND BATHTUB TO EXISTING ROUGH PLUMBING.
|