| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/10/2013 |
140077985 |
01 |
A3 |
R PERMIT-ENTIRE |
05/11/2013 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 07/18/2012 |
121153045 |
01 |
A2 |
X SIGNED OFF |
05/09/2017 |
0032850 RA |
AIELLO |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH.FILED IN CONJUNCT
|
|
Work on Floor(s): 002,004,ROF
|
| 06/05/2012 |
110465700 |
02 |
A1 |
J P/E DISAPPROVED |
05/06/2013 |
|
AIELLO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 APPLICATION FILED TO ENLARGE 4TH FLR. ADDIT
|
|
Work on Floor(s): 001,004,ROF
|
| 03/03/2009 |
110465700 |
01 |
A1 |
R PERMIT-ENTIRE |
03/04/2014 |
0032850 RA |
AIELLO |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO ENLARGE FOURTH FLOOR. TOTAL ADDITIONAL SQUARE FOOTAGE
|
|
Work on Floor(s): 004
|
| 04/29/2008 |
110152487 |
01 |
A1 |
J P/E DISAPPROVED |
06/11/2008 |
0017381 RA |
WRIGHT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/05/2008 APPLICATION FILED TO ENLARGE FOURTH FLOOR AND A
|
|
Work on Floor(s): 4, 5
|
| 01/08/2008 |
110070565 |
01 |
A2 |
R PERMIT-ENTIRE |
02/01/2008 |
0051224 PE |
Parikh |
|
NOT APPLICABLE
|
|
Underpinning as per plans filed herewith. No change in use, egress or
|
|
Work on Floor(s): CEL
|
| 03/13/2007 |
104023094 |
06 |
A1 |
P APPROVED |
03/21/2007 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 001 thru 004
|
| 09/13/2006 |
104023094 |
05 |
A1 |
G PAA FEE DUE |
09/13/2006 |
0015561 RA |
VENEZIAL |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/15/2006
|
|
Work on Floor(s): CEL 001 thru 004
|
| 08/28/2006 |
104023094 |
04 |
A1 |
P APPROVED |
09/05/2006 |
0015561 RA |
VENEZIAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 03/20/2006 |
104374883 |
01 |
A2 |
X SIGNED OFF |
05/01/2007 |
0038991 PE |
Joselow |
|
NOT APPLICABLE
|
|
Install sprinkler system throughout building as per plans. No change to us
|
|
Work on Floor(s): CEL 001 thru 004
|
| 11/10/2005 |
104280074 |
01 |
A3 |
X SIGNED OFF |
05/11/2007 |
|
SIWIEC |
|
NOT APPLICABLE
|
|
INSTALLATION OF 25' LENGTH BY 30' HEIGHT PIPE SCAFFOLDING. NO CHANGE IN
|
|
Work on Floor(s): GRD
|
| 11/10/2005 |
104280065 |
01 |
A3 |
X SIGNED OFF |
05/03/2007 |
|
SIWIEC |
|
NOT APPLICABLE
|
|
INSTALLATION OF 25' SIDEWALK SHED FOR THE PURPOSE OF FACADE INSPECTION.
|
|
Work on Floor(s): GRD
|
| 03/24/2005 |
104023094 |
03 |
A1 |
X SIGNED OFF |
06/29/2007 |
0025634 PE |
WING |
|
NOT APPLICABLE
|
|
RELATED STRUCTURAL WORK IN CONJUNCTION W ITH 4TH FLOOR ADDITION AND
|
|
Work on Floor(s): CEL 001 thru 004
|
| 02/07/2005 |
104023094 |
02 |
A1 |
X SIGNED OFF |
06/29/2007 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
RELATED MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH 4TH FLOOR
|
|
Work on Floor(s): CEL 001 thru 004
|
| 02/07/2005 |
104023094 |
01 |
A1 |
X SIGNED OFF |
06/29/2007 |
0015561 RA |
VENEZIAL |
|
NOT APPLICABLE
|
|
NEW 4TH FLOOR ADDITION TO EXISTING ONE F AMILY DWELLING. ENTIRE INTERIOR
|
|
Work on Floor(s): CEL 001 thru 004
|