| 09/30/2009 |
120167880 |
01 |
A3 |
X SIGNED OFF |
02/17/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF 32 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR EXTERIOR RE
|
|
Work on Floor(s): OSP
|
| 09/25/2009 |
120166195 |
01 |
A3 |
R PERMIT-ENTIRE |
10/22/2009 |
0026939 RA |
JOSHUA |
|
NOT APPLICABLE
|
|
NEW TEMPORARY CONSTRUCTION FENCE FOR APPLICATION NUMBER 120144879. NO CHAN
|
|
Work on Floor(s): OSP
|
| 09/21/2009 |
120161065 |
01 |
A3 |
R PERMIT-ENTIRE |
04/23/2010 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLDING AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO
|
|
Work on Floor(s): OSP
|
| 08/31/2009 |
120144879 |
01 |
A2 |
R PERMIT-ENTIRE |
10/23/2009 |
0026939 RA |
JOSHUA |
|
NOT APPLICABLE
|
|
REPAIR STUCCO ON FRONT BUILDING FACADE. REPAIR EXISTING CONCRETE SIDEWALK
|
|
Work on Floor(s): OSP
|
| 09/17/2007 |
104902651 |
01 |
A3 |
R PERMIT-ENTIRE |
09/20/2007 |
OT |
DEL MAST |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SHED 20' DURING FACADE REPAIR . NO CHANGES
|
|
Work on Floor(s): 001
|
| 06/08/1990 |
100045069 |
01 |
A2 |
R PERMIT-ENTIRE |
07/06/1990 |
0012965 RA |
RYCER |
|
NOT APPLICABLE
|
|
RELOCATING EXISTING PARTITIONS ON THE 3RD & 4TH FLOORS.STRUCTURAL
|
|
Work on Floor(s): 3, 4
|