| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/13/2017 |
122552068 |
04 |
A2 |
P APPROVED |
12/15/2017 |
|
PEACHY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 11/06/2017 |
122552068 |
03 |
A2 |
P APPROVED |
11/08/2017 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 12/01/2015 |
122552068 |
02 |
A2 |
P APPROVED |
12/09/2015 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 10/22/2015 |
122552068 |
01 |
A2 |
R PERMIT-ENTIRE |
11/08/2017 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
LEGALIZE EXISTING BOILER AND (2) HOT WATER HEATERS AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): CEL
|
| 09/15/2009 |
120153733 |
01 |
A3 |
R PERMIT-ENTIRE |
09/15/2009 |
0020916 PE |
ATLAS |
|
NOT APPLICABLE
|
|
INSTALLATION OF APPROXIMATELY 20 L.F. OF HEAVYDUTY SIDEWALK SHED FOR REMED
|
|
Work on Floor(s): OPS
|
| 07/13/2000 |
102698733 |
01 |
A2 |
X SIGNED OFF |
01/04/2001 |
0631921 PE |
Moulana |
|
NOT APPLICABLE
|
|
To re-inforce &/ Or replace existing ceiling joist to avert immediate fail
|
|
Work on Floor(s): 003,4
|