BIS Menu  |  Applications   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 1
Premises: 149 EAST 60 STREET MANHATTAN BIN: 1041923    Block: 1395    Lot: 23

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
10/03/2016 140558304 01 A3 X SIGNED OFF 07/03/2019 0082770 PE BAILEY NOT APPLICABLE
 PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
 Work on Floor(s): OSP

08/12/2016 140534615 01 A3 X SIGNED OFF 07/03/2019 0082770 PE BAILEY NOT APPLICABLE
 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
 Work on Floor(s): OSP

06/19/2015 140364451 01 A3 H P/E IN PROCESS 06/19/2015 0083278 PE HOQUE NOT APPLICABLE
 ADMIN CLOSED 08/18/2015 INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. ALL WO
 Work on Floor(s): OSP

12/19/2014 122228927 01 DM X SIGNED OFF 07/01/2018 0090971 PE PATTOU NOT APPLICABLE
 DEMOLITION OF A BUILDING MECHANICAL REQUEST
09/17/2003 103566767 01 A2 X SIGNED OFF 12/02/2003 0025168 RA King NOT APPLICABLE
 It is proposed to renovate existing store on first floor. Install partitio
 Work on Floor(s): 001

06/23/1998 101894078 01 A2 X SIGNED OFF 04/03/2006 0051094 PE Katz NOT APPLICABLE
 Replace existing stair sprinkler system with new system in stair hallway o
 Work on Floor(s): 001,005

05/14/1997 101571773 01 A2 X SIGNED OFF 07/02/2003 0027885 PE SHUSTKIN NOT APPLICABLE
 INSTALL NEW OFFICE PARTITIONS AT 2 ND FL AND AT FIRST FL. INSTALL NEW
 Work on Floor(s): 1, 2



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Applications