Premises: 113 EAST 60 STREET MANHATTAN BIN: 1041913    Block: 1395    Lot: 6

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
01/09/2019 121285448 06 A1 P APPROVED 01/18/2019 HOUSTOUN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 006

12/24/2018 123217599 02 A2 P APPROVED 01/07/2019 TAN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 004

07/02/2018 121285448 05 A1 P APPROVED 07/06/2018 0077896 PE TAN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL,ROF 001 thru 006

07/02/2018 121285448 04 A1 P APPROVED 07/06/2018 HOUSTOUN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 006

03/12/2018 123217599 01 A2 X SIGNED OFF 06/26/2019 0077896 PE TAN NOT APPLICABLE
 INSTALLATION OF 3 NEW COMBI-BOILERS IN CELLAR. NO CHANGE TO EGRESS, OCCUPA
 Work on Floor(s): CEL,ROF 001 thru 004

01/22/2018 123199047 01 A2 J P/E DISAPPROVED 02/09/2018 0082794 PE YEE-LYNN NOT APPLICABLE
 JOB WITHDRAWN 05/01/2018 INSTALLATION OF NEW MANUAL & AUTOMATIC SMOKE/ HEA
 Work on Floor(s): CEL,ROF 001 thru 006

07/27/2017 121287650 02 A2 P APPROVED 07/31/2017 TAN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 006

05/25/2017 121291093 03 A2 P APPROVED 05/26/2017 0096142 PE YELKIKAN NOT APPLICABLE
 DOC WITHDRAWN 10/04/2017 SUBSEQUENT STRUCTURAL FILING AS SHOWN HERE WITH.
 Work on Floor(s): CEL,001,002

05/25/2017 121291093 02 A2 P APPROVED 05/26/2017 0077896 PE TAN NOT APPLICABLE
 DOC WITHDRAWN 10/04/2017 SUBSEQUENT FILING FOR PLUMBING AND MECHANICAL AS
 Work on Floor(s): CEL,001,002

05/25/2017 121291093 01 A2 P APPROVED 05/26/2017 0032278 RA HOUSTOUN NOT APPLICABLE
 JOB WITHDRAWN 10/04/2017 INTERIOR RENNOVATION AS SHOWN ON PLANS HERE WITH.
 Work on Floor(s): CEL,001,002

05/18/2017 121285448 03 A1 X SIGNED OFF 10/25/2019 0096142 PE YELKIKAN NOT APPLICABLE
 SUBSQUENT STRUCTURAL FILING AS SHOWN HEREWITH.
 Work on Floor(s): CEL,ROF 001 thru 006

05/18/2017 121285448 02 A1 X SIGNED OFF 10/25/2019 0077896 PE TAN NOT APPLICABLE
 SUBSQUENT FILING FOR PLUMBING AND MECHANICAL AS SHOWN HEREWITH.
 Work on Floor(s): CEL,ROF 001 thru 006

05/18/2017 121285448 01 A1 X SIGNED OFF 10/25/2019 0032278 RA HOUSTOUN NOT APPLICABLE
 GENERAL CONSTRUCTION AND CHANGES TO OCCUPANCY USE OF ENTIRE BUILDING AS SH
 Work on Floor(s): CEL,ROF 001 thru 006

05/15/2017 121287650 01 A2 X SIGNED OFF 09/18/2018 0077896 PE TAN NOT APPLICABLE
 INSTALLATION OF ADDITIONAL SPRINKLER HEADS TO ENTIRE BUILDING AS SHOWN HER
 Work on Floor(s): CEL,ROF 001 thru 006

05/15/2017 121223960 01 A2 X SIGNED OFF 08/14/2018 0077896 PE TAN NOT APPLICABLE
 INSTALLATION OF NEW MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION SPRINKLER S
 Work on Floor(s): CEL,ROF 001 thru 006

02/17/2016 110366871 05 A2 D A/P ENTIRE 08/05/2016 FREYER NOT APPLICABLE
 DOC WITHDRAWN 09/12/2019
 Work on Floor(s): CEL

05/21/2014 120002727 03 A2 D A/P ENTIRE 05/22/2014 FREYER NOT APPLICABLE
 DOC WITHDRAWN 03/28/2016
 Work on Floor(s): CEL

06/30/2010 120397971 01 A2 X SIGNED OFF 12/20/2010 0015865 RA FREYER NOT APPLICABLE
 INTERIOR RENOVATIONS TO INCLUDE DRYWALL PARTITIONS, NEW AC EQUIPMENT AND
 Work on Floor(s): CEL

09/23/2009 120002727 02 A2 P APPROVED 09/29/2009 FREYER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL

09/10/2009 110366871 04 A2 P APPROVED 09/10/2009 FREYER NOT APPLICABLE
 DOC WITHDRAWN 09/12/2019
 Work on Floor(s): CEL

04/01/2009 120002727 01 A2 X SIGNED OFF 02/09/2018 0015865 RA FREYER NOT APPLICABLE
 INSTALLATION OF 3 BOILERS IN CELLAR. NO CHANGE TO USE OCCUPANCY OR EGRESS
 Work on Floor(s): CEL

01/13/2009 110366871 03 A2 P APPROVED 01/15/2009 FREYER NOT APPLICABLE
 DOC WITHDRAWN 09/12/2019
 Work on Floor(s): CEL

12/30/2008 110366871 02 A2 P APPROVED 01/05/2009 FREYER NOT APPLICABLE
 DOC WITHDRAWN 09/12/2019
 Work on Floor(s): CEL

11/05/2008 101648889 11 A1 P APPROVED 11/07/2008 FREYER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 2, 3, 4, 5

10/20/2008 110366871 01 A2 R PERMIT-ENTIRE 03/02/2015 0015865 RA FREYER NOT APPLICABLE
 JOB WITHDRAWN 09/12/2019 INSTALLATION OF NEW BOILERS AND HOT WATER HEATERS
 Work on Floor(s): CEL

10/18/2008 101648889 10 A1 P APPROVED 10/21/2008 FREYER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 2, 3, 4, 5

05/22/2008 101648889 09 A1 P APPROVED 07/24/2008 FREYER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 2, 3, 4, 5

02/06/2008 101648889 08 A1 P APPROVED 02/06/2008 0015865 RA FREYER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 2, 3, 4, 5

12/10/2007 101648889 07 A1 D A/P ENTIRE 12/14/2007 0015865 RA FREYER NOT APPLICABLE
 DOC WITHDRAWN 02/06/2008
 Work on Floor(s): 2, 3, 4, 5

10/26/2007 110001471 01 A3 X SIGNED OFF 06/19/2008 0020419 RA Hulme NOT APPLICABLE
 ERECT PIPE SCAFFOLD 20 L.F. x 50' H AT 113 EAST 60 STREET. DURING REMEDIA
 Work on Floor(s): 001

03/20/2007 104709816 01 A3 X SIGNED OFF 06/11/2008 0020419 RA Hulme NOT APPLICABLE
 INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 21 FT LONG AT 113 EAST 60 STRE
 Work on Floor(s): 001

03/20/2007 101648889 06 A1 D A/P ENTIRE 11/29/2007 0015865 RA FREYER NOT APPLICABLE
 DOC WITHDRAWN 02/06/2008
 Work on Floor(s): 2, 3, 4, 5

10/26/2006 101648889 05 A1 P APPROVED 01/10/2007 0015865 RA FREYER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 2, 3, 4, 5

02/19/2004 101648889 04 A1 P APPROVED 02/27/2004 0015865 RA FREYER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 2, 3, 4, 5

04/25/2002 103125299 01 A2 R PERMIT-ENTIRE 02/20/2004 0015865 RA Freyer NOT APPLICABLE
 JOB WITHDRAWN 07/27/2018 Installation of air conditioning units. No chang
 Work on Floor(s): ROF,003,004,005

06/29/2000 101648889 03 A1 P APPROVED 10/16/2006 0015865 RA FREYER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 2, 3, 4, 5

09/08/1999 102204561 01 A3 R PERMIT-ENTIRE 09/15/1999 0057210 PE Wapner NOT APPLICABLE
 JOB WITHDRAWN 07/25/2018 Erect 20LF heavy duty Pipe Scaffold @75psf.
 Work on Floor(s): 001

07/01/1999 101648889 02 A1 P APPROVED 07/15/1999 0015865 RA FREYER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 2, 3, 4, 5

06/11/1999 102207185 01 A3 R PERMIT-ENTIRE 09/09/1999 0057210 PE Wapner NOT APPLICABLE
 JOB WITHDRAWN 07/25/2018 Erect 20LF Sidewalk Shed @ 300psf. Shed to comply
 Work on Floor(s): 001

12/12/1997 101648889 01 A1 X SIGNED OFF 11/07/2008 0015865 RA FREYER NOT APPLICABLE
 COMBINE EXISTING 2 APTS INTO 1, ADD A 5TH FLOOR. GENERAL CONSTRUCTION