 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 05/30/2013 |
140083362 |
PR |
E LAA FILED |
05/30/2013 |
OBI 005277 |
PALLADIN |
|
INSTALLATION OF (2) TEMPORARY 275 GALLON FUEL OIL STORAGE TANKS IN CELLAR
|
|
Work on Floor(s): CEL
|
| 04/24/2013 |
140073024 |
PR |
E LAA FILED |
04/24/2013 |
OBI 004269 |
VITTORIA |
|
INSTALL ONE INDUSTRIAL COMBUSTION DEG54 MEA#86-70-E EQUIPMENT TO BURN STR
|
|
Work on Floor(s): BLR 001 thru 002
|
| 09/11/2012 |
110580194 |
PR |
E LAA FILED |
09/20/2012 |
OBI 005157 |
PICCININ |
|
FILE 2 275 GALLON TEMPORARY OIL TANKS AND CONNECT TO EXISTING BOILER & BUR
|
|
Work on Floor(s): CEL
|
| 05/26/2011 |
110542388 |
PR |
I LAA SIGNED OFF |
03/02/2012 |
MP 001549 |
DEMARINI |
|
INSTALL ONE 3" WATTS 909 RPZ, MEA#145-83-M, DEP APPROVAL#11028795 IN THE C
|
|
Work on Floor(s): CEL
|
| 04/01/2010 |
110500805 |
PR |
I LAA SIGNED OFF |
06/23/2011 |
MP 001177 |
O'GRADY |
|
INSTALL 2 SPRINKLER HEADS TO COVER THE EXISTING 3 DRYERS.WE WILL INSTALL 2
|
|
Work on Floor(s): BAS
|