| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/26/2022 |
121380362 |
07 |
A2 |
P APPROVED |
12/16/2022 |
|
ZABOLOTS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 08/17/2021 |
121380362 |
06 |
A2 |
P APPROVED |
11/09/2021 |
0071371 PE |
ZABOLOTS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 06/17/2021 |
121380362 |
05 |
A2 |
P APPROVED |
11/03/2021 |
|
SHOEMAKE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 02/15/2019 |
123660305 |
01 |
A2 |
P APPROVED |
04/03/2019 |
0017827 RA |
SHOEMAKE |
|
NOT APPLICABLE
|
|
FILING NEW ALT2 APPLICATION FOR GENERAL CONSTRUCTION. ALL ACCORDING TO SUB
|
|
Work on Floor(s): ROF
|
| 02/15/2019 |
123660305 |
03 |
A2 |
P APPROVED |
04/03/2019 |
0062489 PE |
SPOSATO |
|
NOT APPLICABLE
|
|
FILING NEW ALT2 APPLICATION FOR MECHANICAL WORK. ALL ACCORDING TO SUBMITTE
|
|
Work on Floor(s): ROF
|
| 02/15/2019 |
123660305 |
02 |
A2 |
P APPROVED |
04/03/2019 |
0084716 PE |
KREMMIDA |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER
|
|
Work on Floor(s): ROF
|
| 05/15/2018 |
121380362 |
04 |
A2 |
P APPROVED |
05/24/2018 |
|
SPOSATO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 01/20/2017 |
122995786 |
01 |
A2 |
X SIGNED OFF |
02/27/2024 |
0074163 PE |
LUCZAK |
|
NOT APPLICABLE
|
|
SPRINKLER WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER T
|
|
Work on Floor(s): BAS,001,002,003,004,ROF
|
| 07/08/2016 |
140518777 |
01 |
A3 |
X SIGNED OFF |
10/03/2017 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLAN. WORK SHALL COMPLY WITH 2014 BUI
|
|
Work on Floor(s): OSP
|
| 07/08/2016 |
140518697 |
01 |
A3 |
X SIGNED OFF |
10/06/2017 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. WORK SHALL COMPLY WITH 2014 BUI
|
|
Work on Floor(s): OSP
|
| 11/14/2014 |
140281264 |
01 |
A3 |
X SIGNED OFF |
08/09/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN NO CHANGE
|
|
Work on Floor(s): OSP
|
| 11/14/2014 |
140281255 |
01 |
A3 |
X SIGNED OFF |
08/14/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN NO CHANGE
|
|
Work on Floor(s): OSP
|
| 09/08/2014 |
122113765 |
01 |
A3 |
X SIGNED OFF |
05/30/2019 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 09/08/2014 |
122113774 |
01 |
A3 |
R PERMIT-ENTIRE |
09/08/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/21/2014 INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOL
|
|
Work on Floor(s): OSP
|
| 09/08/2014 |
122092029 |
01 |
A3 |
R PERMIT-ENTIRE |
09/08/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/21/2014 INSTALLATION OF TWO MATERIAL ONLY 1000 LB CAPACIT
|
|
Work on Floor(s): OSP
|
| 01/27/2014 |
121905055 |
01 |
A2 |
R PERMIT-ENTIRE |
07/23/2014 |
0061028 PE |
CHEN |
|
NOT APPLICABLE
|
|
SHORING AND BRACING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPAN
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/27/2014 |
121905055 |
02 |
A2 |
R PERMIT-ENTIRE |
01/28/2014 |
0084716 PE |
KREMMIDA |
|
NOT APPLICABLE
|
|
DEMOLITION SEQUENCING. MINOR EXCAVATION WORK. REMOVING EXISTING
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 10/03/2012 |
121380362 |
03 |
A2 |
R PERMIT-ENTIRE |
12/18/2013 |
0071371 PE |
ZABOLOTS |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCC
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 10/03/2012 |
121380362 |
02 |
A2 |
R PERMIT-ENTIRE |
12/06/2013 |
0084716 PE |
KREMMIDA |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 10/03/2012 |
121380362 |
01 |
A2 |
R PERMIT-ENTIRE |
08/17/2020 |
0017827 RA |
SHOEMAKE |
|
NOT APPLICABLE
|
|
INTERIOR AND EXTERIOR WORK TO AN EXISTING ONE FAMILY HOUSE. NO CHANGE OF U
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/19/2012 |
121383528 |
01 |
A2 |
J P/E DISAPPROVED |
10/11/2012 |
0071565 PE |
LOBO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/03/2021 SPRINKLER WORK AS PER PLANS. NO CHANGE OF USE, EG
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 05/24/2011 |
120702141 |
01 |
A2 |
X SIGNED OFF |
06/13/2023 |
0017827 RA |
SHOEMAKE |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF AN EXISTING ONE FAMILY, INCLUDING PARTITION CHANGES
|
|
Work on Floor(s): 003,004,005
|
| 03/21/2011 |
104512403 |
06 |
A1 |
P APPROVED |
03/29/2011 |
|
MANN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 01/11/2011 |
104512403 |
05 |
A1 |
P APPROVED |
01/21/2011 |
|
MANN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 12/16/2010 |
104512403 |
04 |
A1 |
P APPROVED |
12/20/2010 |
|
MANN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 01/18/2008 |
110076587 |
01 |
A3 |
X SIGNED OFF |
04/12/2010 |
0078402 PE |
Blinn |
|
NOT APPLICABLE
|
|
Erect Temporary Scaffold 20' x 40' tall in conj. with work under Appl.#
|
|
Work on Floor(s): 001
|
| 10/31/2007 |
110006788 |
01 |
A3 |
X SIGNED OFF |
07/29/2009 |
OT |
Hama |
|
NOT APPLICABLE
|
|
Erect 25' of Temporary Heavy Duty Sidewalk Shed 300 psf 8' tall for protec
|
|
Work on Floor(s): 001
|
| 09/13/2007 |
104512403 |
03 |
A1 |
P APPROVED |
04/08/2008 |
0021910 RA |
Kaye |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 08/10/2006 |
104512403 |
02 |
A1 |
X SIGNED OFF |
03/31/2011 |
0006815 PE |
Benigno |
|
NOT APPLICABLE
|
|
File structural plans in conjunction with architecturals for conversion to
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 08/10/2006 |
104512403 |
01 |
A1 |
X SIGNED OFF |
03/31/2011 |
0024860 RA |
MANN |
|
NOT APPLICABLE
|
|
Convert existing multiple dwelling to single family residence. Scope of
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 01/09/2006 |
104320682 |
01 |
A2 |
X SIGNED OFF |
09/27/2010 |
0021910 RA |
Kaye |
|
NOT APPLICABLE
|
|
Install new boiler and flue. No change to use, egress or occupancy.
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/09/2005 |
104235800 |
01 |
A2 |
R PERMIT-ENTIRE |
11/18/2009 |
0021910 RA |
Kaye |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/22/2011 File to renovate existing 5 story townhouse. Work
|
|
Work on Floor(s): BAS 001 thru 004
|
| 09/07/2005 |
104225731 |
01 |
A3 |
X SIGNED OFF |
03/24/2010 |
OT |
OBER |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD 25' LONG BY 50' HIGH DURING FACADE REPAIR. NO CHA
|
|
Work on Floor(s): 001
|
| 09/06/2005 |
104224288 |
01 |
A3 |
X SIGNED OFF |
03/24/2010 |
OT |
OBER |
|
NOT APPLICABLE
|
|
INSTALLAION OF A HEAVY DUTY SIDEWALK SHED 30' DURING FACADE REPAIR. NO CHA
|
|
Work on Floor(s): 001
|
| 05/20/2005 |
104109153 |
01 |
A2 |
Q PERMIT-PARTIAL |
06/14/2005 |
0061152 PE |
GEIGER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/22/2011 INTERIOR DEMOLITION TO EXISTING RESIDENTIAL BLDG.
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|