 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/01/2022 |
122719273 |
06 |
A1 |
P APPROVED |
05/21/2022 |
|
THOMPSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 11/01/2019 |
122719273 |
05 |
A1 |
P APPROVED |
11/12/2019 |
|
THOMPSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 03/19/2018 |
122719273 |
04 |
A1 |
P APPROVED |
03/29/2018 |
0074657 PE |
FISKAA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL
|
| 10/03/2017 |
123159429 |
01 |
A2 |
X SIGNED OFF |
10/05/2018 |
0019756 RA |
TURNER |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT 6F NEW KITCHEN, NEW BATHROOMS MINOR PARTI
|
|
Work on Floor(s): 006
|
| 07/26/2017 |
122946134 |
01 |
A2 |
X SIGNED OFF |
02/23/2018 |
0013258 RA |
FERRANTE |
|
NOT APPLICABLE
|
|
MINOR PARTITION WORK AND PLUMBING WITHIN APARTMENT 14-D. NO CHANGE IN USE
|
|
Work on Floor(s): 014
|
| 04/27/2017 |
122719273 |
03 |
A1 |
P APPROVED |
05/02/2017 |
0074657 PE |
FISKAA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL
|
| 03/02/2017 |
123032841 |
01 |
A2 |
X SIGNED OFF |
07/06/2017 |
0011690 RA |
ATTICK |
|
NOT APPLICABLE
|
|
REPLACE FINISHES ON FLOORS, UPGRADE KITCHEN, REPLACE FIREPLACE MANTEL, PAI
|
|
Work on Floor(s): 010
|
| 05/04/2016 |
122719273 |
02 |
A1 |
X SIGNED OFF |
07/29/2022 |
0074657 PE |
FISKAA |
|
NOT APPLICABLE
|
|
INSTALLATION OF PLUMBING FIXTURES. REMOVAL OF MECHANICAL DUCTWORK. INSTALL
|
|
Work on Floor(s): CEL
|
| 05/04/2016 |
122719273 |
01 |
A1 |
X SIGNED OFF |
07/29/2022 |
0026396 RA |
THOMPSON |
|
NOT APPLICABLE
|
|
NEW PARTITION AND BATHROOM AT CELLAR'S SUPERINTENDENT APARTMENT. AMEND EXI
|
|
Work on Floor(s): CEL
|
| 03/08/2016 |
122704813 |
01 |
A2 |
X SIGNED OFF |
12/22/2017 |
0018942 RA |
LEGARDEU |
|
NOT APPLICABLE
|
|
COMBINATION OF APTS 4A AND 4B, INCLUDING PARTITION CHANGES. MINOR MECHANIC
|
|
Work on Floor(s): 004
|
| 10/13/2015 |
122552344 |
01 |
A2 |
X SIGNED OFF |
10/03/2016 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING APARTMENT, INSTALLATION OF NEW THRU-WALL HVAC UNITS
|
|
Work on Floor(s): 011
|
| 09/24/2015 |
122535033 |
01 |
A2 |
F ASSIGNED TO P/E |
09/25/2015 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/19/2015 RENOVATION OF EXISTING APARTMENT, INSTALLATION OF
|
|
Work on Floor(s): 011
|
| 11/05/2014 |
122185385 |
01 |
A2 |
R PERMIT-ENTIRE |
12/12/2014 |
0025088 RA |
CONATY |
|
NOT APPLICABLE
|
|
REMOVAL OF NONBEARING PARTITIONS AND DOORS, INSTALLATION OF NEW THROUGH TH
|
|
Work on Floor(s): 011
|
| 07/30/2014 |
122082735 |
01 |
A2 |
X SIGNED OFF |
03/09/2015 |
0013322 RA |
TSUE |
|
NOT APPLICABLE
|
|
NEW THRU WALL AIR-CONDITIONING UNITS FOR APARTMENT #15BC ON THE 15TH FLOOR
|
|
Work on Floor(s): 015
|
| 12/13/2013 |
121577980 |
03 |
A2 |
P APPROVED |
02/26/2014 |
|
LOFFREDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 016
|
| 08/20/2013 |
120151129 |
03 |
A2 |
P APPROVED |
09/09/2013 |
|
MELVIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 015
|
| 07/30/2013 |
110356800 |
02 |
A2 |
P APPROVED |
11/22/2013 |
|
MELVIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PEN 001 thru 015
|
| 06/21/2013 |
121577980 |
02 |
A2 |
P APPROVED |
07/10/2013 |
|
LOFFREDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 016
|
| 03/22/2013 |
121577980 |
01 |
A2 |
X SIGNED OFF |
04/10/2014 |
0022466 RA |
LOFFREDO |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATIONS AS INDICATED ON PLANS.NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): 016
|
| 12/19/2012 |
121466760 |
01 |
A2 |
X SIGNED OFF |
02/27/2014 |
0022466 RA |
LOFFREDO |
|
NOT APPLICABLE
|
|
NON-LOAD BEARING INTERIOR DEMOLITION AS INDICATED ON PLANS.NO CHANGE IN US
|
|
Work on Floor(s): 017
|
| 06/12/2012 |
121107569 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS. DURING REMEDIAL REPAIRS.
|
|
Work on Floor(s): OSP
|
| 06/07/2012 |
121052662 |
02 |
A3 |
P APPROVED |
06/08/2012 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 04/23/2012 |
121052662 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY STEEL PIPE SCAFFOLD AS PER PLANS. DURING REMEDI
|
|
Work on Floor(s): OSP
|
| 03/20/2012 |
120866679 |
02 |
A3 |
P APPROVED |
03/22/2012 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/07/2012 |
121001165 |
01 |
A2 |
X SIGNED OFF |
03/07/2013 |
0032526 RA |
LAVAIL |
|
NOT APPLICABLE
|
|
MINOR INTERIOR RENOVATIONS TO APARTMENT #10A AS PER PLANS SUBMITTED HEREWI
|
|
Work on Floor(s): 010
|
| 11/21/2011 |
120151129 |
02 |
A2 |
P APPROVED |
12/16/2011 |
|
MELVIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 015
|
| 11/14/2011 |
120895237 |
01 |
A2 |
X SIGNED OFF |
09/18/2013 |
0061028 PE |
CHEN |
|
NOT APPLICABLE
|
|
TEMPORARY SHORING INSTALLATION AS PER DRAWINGS. NO CHANGE IN USE, EGRESS
|
|
Work on Floor(s): 0PH,015
|
| 10/21/2011 |
120866679 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF 15 FEET LONG PIPE SCAFFOLD, 20'-3" FEET HIGH, LOCATED AT 1
|
|
Work on Floor(s): OSP
|
| 08/18/2011 |
120657431 |
02 |
A3 |
P APPROVED |
08/18/2011 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/18/2011 |
120548274 |
02 |
A3 |
P APPROVED |
08/18/2011 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 04/11/2011 |
120657431 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF 20'-3" HIGH, 8' LONG PIPE SCAFFOLD LOCATED AT 16 FLOOR TER
|
|
Work on Floor(s): OSP
|
| 12/14/2010 |
120557753 |
01 |
A2 |
X SIGNED OFF |
07/27/2011 |
0018942 RA |
LEGARDEU |
|
NOT APPLICABLE
|
|
RENOVATION OF AN EXISTING 2 BEDROOM COOP APARTMENT.
|
|
Work on Floor(s): 010
|
| 12/07/2010 |
120548274 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF 17'-2" HIGH, 22' LONG PIPE SCAFFOLD LOCATED AT SOUTH ELEVA
|
|
Work on Floor(s): OSP
|
| 09/14/2010 |
120467468 |
01 |
A2 |
X SIGNED OFF |
06/01/2011 |
0015046 RA |
SCHIMENT |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION TO APARTMENT #3A ON 3RD FL NEW KITCHEN CABINE
|
|
Work on Floor(s): 3RD
|
| 08/23/2010 |
120453366 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF STEEL PIPE SCAFFOLDING SECTIONS ON ROOF WITH ENCLOSED HAND
|
|
Work on Floor(s): OSP
|
| 08/04/2010 |
120433343 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF 27' LONG HEAVY DUTY SIDEWALK SHED, 10' HIGH, SIDEWALK SHED
|
|
Work on Floor(s): 001
|
| 07/26/2010 |
120419519 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF 124 FEET LONG PIPE SCAFFOLD, 57 FEET HIGH, LOCATED AT 16TH
|
|
Work on Floor(s): OSP
|
| 04/21/2010 |
120327173 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INATALLATION OF PIPE SCAFFOLD AS PER PLANS DURING CHIMNEY RESTORATION.PIPE
|
|
Work on Floor(s): OSP
|
| 01/15/2010 |
120246448 |
01 |
A2 |
X SIGNED OFF |
07/02/2010 |
0015046 RA |
SCHIMENT |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION TO APARTMENT #6E ON THE 6TH FLOOR. NEW KITCHE
|
|
Work on Floor(s): 006
|
| 11/18/2009 |
120195895 |
01 |
A3 |
X SIGNED OFF |
04/23/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INATALLATION OF PIPE SCAFFOLD APPROXIMATELY 24' LONG BY 17' HIGH AT THE 16
|
|
Work on Floor(s): OSP
|