| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/30/2020 |
123701431 |
01 |
A2 |
X SIGNED OFF |
04/09/2021 |
0033036 RA |
DARGO |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS,
|
|
Work on Floor(s): 003
|
| 12/13/2019 |
140828424 |
03 |
A2 |
P APPROVED |
01/10/2020 |
|
SHANNON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 11/04/2019 |
140828424 |
02 |
A2 |
P APPROVED |
11/19/2019 |
|
SHANNON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 06/05/2019 |
123720090 |
01 |
A3 |
X SIGNED OFF |
03/02/2021 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF MATERIAL HOIST AS PER PLANS DURING FACADE REPAIR. NO CHANG
|
|
Work on Floor(s): OSP
|
| 05/23/2019 |
123722695 |
01 |
A2 |
X SIGNED OFF |
03/09/2021 |
0024743 RA |
BATES |
|
NOT APPLICABLE
|
|
RECONSTRUCTION OF 17 LINEAR FEET OF THE WEST END OF THE SOUTH PARAPET AS P
|
|
Work on Floor(s): 010
|
| 04/29/2019 |
123892378 |
01 |
A2 |
X SIGNED OFF |
03/03/2021 |
0024743 RA |
BATES |
|
NOT APPLICABLE
|
|
EXTERIOR REPAIR OF PENTHOUSE ROOF AND BULKHEAD AS PER DRAWINGS. NO CHANGE
|
|
Work on Floor(s): PEN
|
| 02/13/2019 |
123419283 |
02 |
A2 |
P APPROVED |
02/21/2019 |
|
POLLAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 01/25/2019 |
140828424 |
01 |
A2 |
X SIGNED OFF |
03/20/2020 |
0033802 RA |
SHANNON |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF 8TH FL APT#8 A. RENOVATION OF THE KITCHEN AND 2 BAT
|
|
Work on Floor(s): 008
|
| 07/03/2018 |
123419283 |
01 |
A2 |
X SIGNED OFF |
03/22/2019 |
0062598 PE |
POLLAK |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW BOILER, REMOVAL OF TWO EXISTING BOILERS, MODIFICATION
|
|
Work on Floor(s): CEL
|
| 05/09/2018 |
123347011 |
02 |
A2 |
P APPROVED |
02/03/2020 |
|
WEISMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 07/24/2017 |
123347011 |
01 |
A2 |
X SIGNED OFF |
02/16/2021 |
0011605 RA |
WEISMAN |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR INTERIOR NON-STRUCTURAL DEMO, GENERAL CONSTRUCTION A
|
|
Work on Floor(s): 006
|
| 02/17/2017 |
122859219 |
02 |
A2 |
P APPROVED |
03/08/2017 |
|
WEINTRAU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 09/27/2016 |
122859219 |
01 |
A2 |
X SIGNED OFF |
01/02/2020 |
0027327 RA |
WEINTRAU |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 8B. WORK TO INCLUDE REMOVAL OF INTERI
|
|
Work on Floor(s): 008
|
| 07/22/2016 |
122681008 |
02 |
A2 |
P APPROVED |
08/12/2016 |
|
WONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 05/12/2016 |
122345202 |
02 |
A2 |
P APPROVED |
06/06/2016 |
|
MELVIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PEN 001 thru 010
|
| 04/18/2016 |
122727120 |
01 |
A3 |
X SIGNED OFF |
04/04/2021 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS DURING REMEDIAL REPAIRS.
|
|
Work on Floor(s): OSP
|
| 02/22/2016 |
122681008 |
01 |
A2 |
X SIGNED OFF |
11/23/2016 |
0016552 RA |
WONG |
|
NOT APPLICABLE
|
|
RENOVATE APT # 3B. MINOR NON BEARING PARTITION REMOVAL. NEW PARTITIONS AND
|
|
Work on Floor(s): 003
|
| 10/02/2015 |
122545200 |
01 |
A3 |
X SIGNED OFF |
05/04/2021 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF 70' LONG HEAVY-DUTY (600 PSF) SIDEWALK BRIDGE, 8'-14' HIGH
|
|
Work on Floor(s): OSP
|
| 07/09/2015 |
122345202 |
01 |
A2 |
X SIGNED OFF |
04/27/2017 |
0010297 RA |
MELVIN |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS
|
|
Work on Floor(s): PEN 001 thru 010
|
| 06/17/2015 |
122184233 |
02 |
A2 |
P APPROVED |
06/24/2015 |
|
AVIDAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 11/14/2014 |
122184233 |
01 |
A2 |
X SIGNED OFF |
05/25/2016 |
0030429 RA |
AVIDAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT #8F. WORK TO INCLUDE MINOR INTERIOR
|
|
Work on Floor(s): 008
|
| 08/20/2013 |
121754182 |
01 |
A2 |
X SIGNED OFF |
06/12/2015 |
0018040 RA |
MARINO |
|
NOT APPLICABLE
|
|
HEREWITH THIS APPLICATION IS BEING FILED FOR PROPOSED APARTMENT RENOVATION
|
|
Work on Floor(s): 001,002
|
| 03/14/2013 |
121062394 |
02 |
A2 |
P APPROVED |
04/11/2013 |
|
TAHA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 009
|
| 02/27/2013 |
121453998 |
03 |
A3 |
D A/P ENTIRE |
07/18/2013 |
|
HICKEY |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 07/23/2013
|
|
Work on Floor(s): OSP
|
| 02/25/2013 |
121453998 |
02 |
A3 |
P APPROVED |
02/26/2013 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 12/21/2012 |
121468795 |
01 |
A2 |
X SIGNED OFF |
07/28/2014 |
0027456 RA |
BERRIDGE |
|
NOT APPLICABLE
|
|
DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS & DOORS. REPLACE FIX
|
|
Work on Floor(s): 009
|
| 12/06/2012 |
121453998 |
01 |
A3 |
X SIGNED OFF |
08/16/2013 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS DURING REMEDIAL REPAIRS.
|
|
Work on Floor(s): OSP
|
| 12/06/2012 |
121453989 |
01 |
A3 |
X SIGNED OFF |
07/02/2013 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF BETA MAX MATERIAL HOIST AS PER PLANS. DURING REMEDIAL REPA
|
|
Work on Floor(s): OSP
|
| 11/16/2012 |
120983132 |
03 |
A2 |
P APPROVED |
12/12/2012 |
|
SZAKAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 009
|
| 11/09/2012 |
121496826 |
01 |
A2 |
X SIGNED OFF |
07/25/2013 |
0010297 RA |
MELVIN |
|
NOT APPLICABLE
|
|
MASONRY RECONSTRUCTION AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUP
|
|
Work on Floor(s): 001 006 thru 010
|
| 10/26/2012 |
121424486 |
01 |
A2 |
X SIGNED OFF |
10/04/2013 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
CHANGE GRADE OF FUEL OIL FROM #6 TO #2.
|
|
Work on Floor(s): CEL
|
| 08/23/2012 |
121347024 |
01 |
A2 |
X SIGNED OFF |
03/25/2013 |
0016284 RA |
TORABY |
|
NOT APPLICABLE
|
|
THIS APPICATION IS BEING FILED FOR INTERIOR ALTERATION,REMOVAL OF EXISTING
|
|
Work on Floor(s): 003
|
| 07/11/2012 |
121147464 |
01 |
A3 |
X SIGNED OFF |
12/11/2012 |
0023945 RA |
MAHLER |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED PER PLANS. NO CHANGE IN USE,
|
|
Work on Floor(s): GRD
|
| 05/03/2012 |
121062394 |
01 |
A2 |
R PERMIT-ENTIRE |
04/02/2013 |
0082481 PE |
TAHA |
|
NOT APPLICABLE
|
|
GAS PIPING INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANC
|
|
Work on Floor(s): CEL 001 thru 009
|
| 02/16/2012 |
120983132 |
02 |
A2 |
X SIGNED OFF |
05/29/2013 |
0052834 PE |
SZAKAL |
|
NOT APPLICABLE
|
|
FILING FOR PLUMBING WORK AND MECHANICAL MODIFICATION TO APARTMENT 9E IN
|
|
Work on Floor(s): 009
|
| 02/16/2012 |
120983132 |
01 |
A2 |
X SIGNED OFF |
05/29/2013 |
0030278 RA |
SOLON |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO APARTMENT 9E AS PER PLANS SUBMITTED HEREWITH. NO CH
|
|
Work on Floor(s): 009
|
| 12/08/2011 |
120920450 |
01 |
A3 |
R PERMIT-ENTIRE |
12/08/2011 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): 001
|
| 09/30/2011 |
120839888 |
01 |
A2 |
X SIGNED OFF |
05/23/2012 |
0010297 RA |
MELVIN |
|
NOT APPLICABLE
|
|
MASONRY RECONSTRUCTION AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUP
|
|
Work on Floor(s): 010
|
| 05/06/2011 |
120686052 |
01 |
A3 |
X SIGNED OFF |
09/14/2012 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. AS PER PLANS. DURING REMEDIAL RE
|
|
Work on Floor(s): OSP
|
| 05/03/2011 |
120657654 |
01 |
A3 |
R PERMIT-ENTIRE |
05/10/2011 |
0010059 RA |
GOLDBERG |
|
NOT APPLICABLE
|
|
9TH & 10TH FLOOR - DEMOLISH BRICK FROM LINTEL UP TO THE BOTTOM OF THE WIND
|
|
Work on Floor(s): 009,010
|