 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/30/2017 |
121274959 |
01 |
A2 |
P APPROVED |
06/30/2017 |
0039888 PE |
BUTTERFI |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO MERGE APT-5B & 5C (5TH FLOOR) IT'S INCLUDE REMOVAL
|
|
Work on Floor(s): 005
|
| 08/04/2016 |
122683854 |
02 |
A2 |
P APPROVED |
08/18/2016 |
|
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,0TO,ROF
|
| 04/29/2016 |
122683854 |
01 |
A2 |
R PERMIT-ENTIRE |
05/19/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
FILING FOR THE EXHAUST SYSTEM AT COMMERCIAL KITCHEN, THERE IS NO CHANGE, E
|
|
Work on Floor(s): 001,0TO,ROF
|
| 04/12/2016 |
140481752 |
01 |
A2 |
X SIGNED OFF |
05/23/2016 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPA
|
|
Work on Floor(s): CEL,ROF
|
| 02/15/2016 |
122121257 |
03 |
A2 |
P APPROVED |
02/24/2016 |
|
DEMOU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 12/15/2015 |
122288327 |
03 |
A2 |
P APPROVED |
12/17/2015 |
|
KEPTSI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 03/20/2015 |
122288327 |
01 |
A2 |
X SIGNED OFF |
03/26/2018 |
0076847 PE |
KEPTSI |
|
NOT APPLICABLE
|
|
FILING APPLICATION TO REPLACE EXISTING OIL BOILER WITH (1)NEW GAS BOILER A
|
|
Work on Floor(s): CEL
|
| 12/11/2014 |
122121257 |
02 |
A2 |
P APPROVED |
12/22/2014 |
|
DEMOU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 09/04/2014 |
122121257 |
01 |
A2 |
X SIGNED OFF |
03/03/2016 |
0013563 RA |
DEMOU |
|
NOT APPLICABLE
|
|
PROPOSE CONVERSION OF EXISTING STORE TO DRINKING AND EATING ESTABLISHMENT
|
|
Work on Floor(s): CEL,001
|
| 06/06/2014 |
122033192 |
01 |
A2 |
Q PERMIT-PARTIAL |
06/06/2014 |
0013563 RA |
DEMOU |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION OF EXISTING STORE AS PER PLAN. NO CHANGE IN USE, EGRES
|
|
Work on Floor(s): CEL,001
|
| 07/17/2013 |
121716722 |
01 |
A2 |
X SIGNED OFF |
12/04/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION, TO INCLUDE NEW PARTITIONS AT APARTMENTS 5H. NO CHANG
|
|
Work on Floor(s): 5TH
|
| 06/07/2013 |
121676454 |
01 |
A2 |
X SIGNED OFF |
10/31/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION, INTERIOR RENOVATION AT APARTMENTS (1G, 2F, 3B, 4G, A
|
|
Work on Floor(s): 001 thru 005
|
| 02/27/2012 |
120984943 |
01 |
A3 |
R PERMIT-ENTIRE |
02/27/2012 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER TH
|
|
Work on Floor(s): OSP
|
| 02/21/2012 |
120981072 |
01 |
A3 |
R PERMIT-ENTIRE |
04/19/2012 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE
|
|
Work on Floor(s): OSP
|
| 11/12/2009 |
120041267 |
05 |
NB |
D A/P ENTIRE |
11/13/2009 |
|
FOGARTY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 016
|
| 10/28/2009 |
120187644 |
01 |
A3 |
J P/E DISAPPROVED |
11/12/2009 |
0028860 RA |
FOGARTY |
|
NOT APPLICABLE
|
|
BPP FILED HEREWITH.
|
|
Work on Floor(s): OSP
|
| 07/07/2009 |
120041267 |
04 |
NB |
P APPROVED |
11/05/2009 |
0073548 PE |
CLICKMAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF BOILER SYSTEM AS PER PLANS FILED HEREWITH IN CONJUNCTION
|
|
Work on Floor(s): CEL 001 thru 016
|
| 07/07/2009 |
120041267 |
03 |
NB |
P APPROVED |
11/05/2009 |
0073548 PE |
CLICKMAN |
|
NOT APPLICABLE
|
|
MECHANICAL & PLUMBING PLANS FILED IN CONJUNCTION WITH 16TH STORY
|
|
Work on Floor(s): CEL 001 thru 016
|
| 07/07/2009 |
120041267 |
02 |
NB |
P APPROVED |
11/05/2009 |
0084251 PE |
DING |
|
NOT APPLICABLE
|
|
FOUNDATION AND SSTRUCTURAL PLANS FILED IN CONJUNCTION WITH 16 STORY
|
|
Work on Floor(s): CEL 001 thru 016
|
| 06/08/2009 |
120054109 |
01 |
A2 |
J P/E DISAPPROVED |
06/10/2009 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH IN
|
|
Work on Floor(s): CEL 001 thru 016
|
| 06/03/2009 |
120041267 |
01 |
NB |
P APPROVED |
11/05/2009 |
0028860 RA |
FOGARTY |
|
NOT APPLICABLE
|
|
PROPOSE TO ERECT 16 STORY RETAIL/RESIDENTIAL NEW BUILDING.
|
|
Work on Floor(s): CEL 001 thru 016
|
| 06/26/2008 |
110285450 |
01 |
A2 |
P APPROVED |
09/09/2008 |
0061438 PE |
TEUFEL |
|
NOT APPLICABLE
|
|
HEREWITH THIS APPLICATION IS TO LEGALIZE WORK WITHOUT PERMIT PERTAINING TO
|
|
Work on Floor(s): 005
|
| 06/26/2008 |
110285469 |
01 |
A2 |
X SIGNED OFF |
09/30/2009 |
0061438 PE |
TEUFEL |
|
NOT APPLICABLE
|
|
HEREWITH THIS APPLICATION IS TO LEGALIZE WORK WITHOUT PERMIT, TO RESOLVE E
|
|
Work on Floor(s): 004,005,006
|
| 09/26/2003 |
103574632 |
01 |
A2 |
Q PERMIT-PARTIAL |
09/29/2003 |
0010495 RA |
Hagmann |
|
NOT APPLICABLE
|
|
New tenant layout of existing retail space on first and cellar levels, wit
|
|
Work on Floor(s): CEL,001
|
| 05/26/2000 |
102626393 |
01 |
A2 |
X SIGNED OFF |
07/31/2000 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER AND CHANGE GRADE OF FUEL OIL FROM #4 TO #2. NO
|
|
Work on Floor(s): CEL
|
| 03/14/1997 |
101496374 |
01 |
A2 |
Q PERMIT-PARTIAL |
03/27/1997 |
0007310 RA |
WESTPHAL |
|
NOT APPLICABLE
|
|
REFURBISH EXISTING UG#6, MINOR PLUMBING WORK. INSTALL COUNTERS AND DELI
|
|
Work on Floor(s): 1
|
|
122288327 |
02 |
A2 |
A PRE-FILED |
12/14/2015 |
|
KEPTSI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/15/2018
|
|
Work on Floor(s): CEL
|