| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 01/13/2017 |
140594747 |
PR |
I LAA SIGNED OFF |
02/01/2017 |
FSC 000878 |
MCMAHON |
|
INSTALLATION OF 1 NEW SPRINKLER HEAD USING 2' OF 1" PIPE ON 64TH FLOOR.
|
|
Work on Floor(s): 064
|
| 12/15/2016 |
140586266 |
PR |
E LAA FILED |
12/15/2016 |
FSC 000177 |
BOWER |
|
JOB CLOSED 03 18 2019
|
|
Work on Floor(s): 064
|
| 02/29/2016 |
122308065 |
PR |
I LAA SIGNED OFF |
06/11/2016 |
FSC 000378 |
KLANSKY |
|
APPROXIMATELY 30 FEET OF PIPE OR LESS IS BEING INSTALLED REARRANGE (3) SPR
|
|
Work on Floor(s): 002
|
| 02/28/2013 |
140058666 |
PR |
E LAA FILED |
02/28/2013 |
MP 000510 |
BISSO |
|
RELOCATE (1) NON RESIDENTIAL SINK, (1) COFFEE MAKER AND (1) WATER DISPENSE
|
|
Work on Floor(s): 063
|
| 12/10/2003 |
102305104 |
PR |
I LAA SIGNED OFF |
12/19/2003 |
MP 001537 |
KORBL JR |
|
FURNISH AND INSTALL 1-3" FLOR DRAIN WITH 25'OF3"WASTE AND 2"VENT PIPING.
|
|
Work on Floor(s): 012
|