| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
12/04/2020 |
140986903 |
01 |
A3 |
H P/E IN PROCESS |
12/04/2020 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 03/04/2021 INSTALLATION OF ROOF PROTECTION FOR ADJACENT PROPE
|
|
Work on Floor(s): OSP
|
07/22/2020 |
140925596 |
01 |
A2 |
X SIGNED OFF |
07/28/2021 |
0014548 RA |
DOYLE |
|
NOT APPLICABLE
|
|
HEREBY FILING TO DOCUMENT NEW METES AND BOUNDS PER NEW ZONING EXHIBITS AS
|
|
Work on Floor(s): 001
|
04/20/2018 |
122790658 |
02 |
A3 |
P APPROVED |
04/24/2018 |
|
CHARLESW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GRD,001,MEZ
|
09/11/2017 |
123141750 |
01 |
A3 |
R PERMIT-ENTIRE |
09/11/2017 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD WITH STAIR TOWER AS PER PLANS. WORK SHALL COMPLY
|
|
Work on Floor(s): OSP
|
03/01/2017 |
122944993 |
01 |
A3 |
X SIGNED OFF |
09/13/2018 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPT
|
|
Work on Floor(s): OSP
|
07/13/2016 |
122790658 |
01 |
A3 |
X SIGNED OFF |
04/27/2018 |
0097111 PE |
CHARLESW |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD STAIR TOWER AS PER DRAWINGS DURING NEW BUILDING
|
|
Work on Floor(s): GRD,001,MEZ
|
04/15/2016 |
122378872 |
05 |
NB |
J P/E DISAPPROVED |
07/22/2016 |
|
GLAS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/15/2016 ERECT 6 STORY AND CELLAR RETAIL BUILDING.
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
06/26/2015 |
122444319 |
01 |
A2 |
J P/E DISAPPROVED |
07/20/2015 |
0062597 PE |
POMERANT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/19/2016 INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTI
|
|
Work on Floor(s): CEL,ROF,001
|
06/26/2015 |
122452210 |
01 |
A2 |
D A/P ENTIRE |
06/26/2015 |
0062597 PE |
POMERANT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/19/2016 INSTALLATION OF NEW AUTOMATIC SMOKE/HEAT DETECTIO
|
|
Work on Floor(s): CEL,ROF,001
|
06/11/2015 |
122440947 |
01 |
A3 |
J P/E DISAPPROVED |
07/06/2015 |
0020204 RA |
GLAS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/19/2016 FILING BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH
|
|
Work on Floor(s): OSP
|
04/27/2015 |
122378872 |
04 |
NB |
R PERMIT-ENTIRE |
09/29/2015 |
0048329 PE |
PATEL |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/15/2016 FILING SUBSEQUENT SUPPORT OF EXCAVATION WORK FOR
|
|
Work on Floor(s): CEL,OSP
|
04/27/2015 |
122378872 |
03 |
NB |
R PERMIT-ENTIRE |
02/12/2016 |
0062597 PE |
POMERANT |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/15/2016 FILING SUBSEQUENT MECHANICAL SYSTEMS AND PLUMBING
|
|
Work on Floor(s): CEL,001,ROF
|
04/27/2015 |
122378872 |
02 |
NB |
R PERMIT-ENTIRE |
09/29/2015 |
0057530 PE |
MARCUS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/15/2016 FILING SUBSEQUENT STRUCTURAL AND FOUNDATION WORK
|
|
Work on Floor(s): CEL,001,ROF
|
04/27/2015 |
122378872 |
01 |
NB |
R PERMIT-ENTIRE |
09/29/2016 |
0020204 RA |
GLAS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/15/2016 ERECT 6 STORY AND CELLAR RETAIL BUILDING.
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
04/07/2015 |
122343794 |
01 |
A3 |
X SIGNED OFF |
09/13/2018 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPT
|
|
Work on Floor(s): OSP
|
01/30/2015 |
122214424 |
02 |
DM |
X SIGNED OFF |
09/09/2015 |
0092183 PE |
PATTERSO |
|
NOT APPLICABLE
|
|
MECHANICAL MEANS FILING FOR FULL DEMOLITION OF 5 STORY STRUCTURE.
|
|
Work on Floor(s): 001,005
|
01/30/2015 |
122214424 |
01 |
DM |
X SIGNED OFF |
09/09/2015 |
0092183 PE |
PATTERSO |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF A 5 STORY STRUCTURE, USING FULL MECHANICAL MEANS. MECH
|
|
Work on Floor(s): 001,005
|
11/21/2014 |
122079357 |
02 |
A2 |
P APPROVED |
12/18/2014 |
|
LEE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004
|
09/03/2014 |
122079357 |
01 |
A2 |
X SIGNED OFF |
12/26/2014 |
0035061 RA |
LEE |
|
NOT APPLICABLE
|
|
REMOVAL OF NON-BEARING PARTITION, WINDOW AND PLUMBING FIXTURE. NO CHANGE I
|
|
Work on Floor(s): CEL,001,002,003,004
|
12/19/2012 |
121396435 |
02 |
A3 |
P APPROVED |
12/20/2012 |
|
PERDEK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
11/08/2012 |
121396435 |
01 |
A3 |
X SIGNED OFF |
08/27/2018 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF ROOF PROTECTION AS PER DRAWINGS DURING NEW BUILDING CONSTR
|
|
Work on Floor(s): OSP
|
02/03/2012 |
120969988 |
01 |
A2 |
X SIGNED OFF |
03/22/2012 |
0060597 PE |
SHAPIRO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TIE BACKS AT EXISTING PARTY WALL TO STABILIZE DURING DEMOL
|
|
Work on Floor(s): 001 thru 005
|
11/08/2010 |
120513266 |
01 |
A2 |
P APPROVED |
11/08/2010 |
0038964 PE |
GREEN |
|
NOT APPLICABLE
|
|
APPLICATION FILE TO INSTALL CHIMNEY FLUE PIPE NO CHANGE TO USE, OCCUPA
|
|
Work on Floor(s): OSP
|
04/14/2010 |
120322098 |
01 |
A2 |
R PERMIT-ENTIRE |
04/15/2010 |
0052393 PE |
BECK |
|
NOT APPLICABLE
|
|
REPAIR EXISTING DAMAGED ROOF AS PER PLANS. NO CHANGE TO EGRESS, OCCUPANCY
|
|
Work on Floor(s): 00R
|
04/12/2010 |
120318664 |
01 |
A3 |
R PERMIT-ENTIRE |
04/12/2010 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF 35 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR EMERGENCY
|
|
Work on Floor(s): OSP
|
04/12/2010 |
120318673 |
01 |
A3 |
R PERMIT-ENTIRE |
08/19/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS FOR EMERGENCY REPAIRS. SIDEW
|
|
Work on Floor(s): OSP
|
|
110306758 |
01 |
A2 |
A PRE-FILED |
08/01/2008 |
0026161 RA |
ZIZMOR |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION WORK FOR INTERIOR ALTERATIONS. NO CHANGE TO USE, EGR
|
|
Work on Floor(s): 003
|
06/04/2008 |
110194986 |
01 |
A2 |
R PERMIT-ENTIRE |
06/13/2008 |
0026161 RA |
ZIZMOR |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EG
|
|
Work on Floor(s): 003
|
09/27/2007 |
104909734 |
01 |
SG |
R PERMIT-ENTIRE |
11/30/2007 |
|
DONOHUE |
|
NOT APPLICABLE
|
|
INSTALL NONILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER SIGN ON BULDING
|
|
Work on Floor(s): 001
|
06/15/2007 |
104797098 |
02 |
A2 |
R PERMIT-ENTIRE |
08/21/2007 |
0066073 PE |
Guth III |
|
NOT APPLICABLE
|
|
Mechanical and plumbing changes on the basement, 1st and 2nd floor as indi
|
06/15/2007 |
104797098 |
01 |
A2 |
R PERMIT-ENTIRE |
08/21/2007 |
0015580 RA |
Baker |
|
NOT APPLICABLE
|
|
General construction on the basement, 1st and 2nd floor as indicated on
|
|
Work on Floor(s): BAS,001,002
|
08/05/2004 |
103854214 |
01 |
A3 |
X SIGNED OFF |
01/23/2006 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
Install heavy duty sidewalk shed a total of 40 ft long at 36 East 57 Stree
|
|
Work on Floor(s): 001
|
03/26/2004 |
103737217 |
01 |
A2 |
X SIGNED OFF |
04/01/2005 |
0010736 RA |
Terzis |
|
NOT APPLICABLE
|
|
Removal of existing non bearing partitions. Installation of partitions, hu
|
|
Work on Floor(s): 005
|
04/25/2003 |
103445130 |
01 |
A2 |
X SIGNED OFF |
05/16/2003 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE GAS BOILER (NYC BOILER NO. 45604-01) NO CHANGE IN EGRESS, OCCUPANC
|
|
Work on Floor(s): CEL
|
03/22/1999 |
101937763 |
02 |
A2 |
P APPROVED |
09/28/1999 |
0021727 PE |
Grasso |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
11/04/1998 |
101942105 |
01 |
A1 |
J P/E DISAPPROVED |
11/03/1999 |
0010059 RA |
GOLDBERG |
|
NOT APPLICABLE
|
|
CHANGE OF OCCUPANCY IN CELLAR FROM STORA TO RETAIL.
|
|
Work on Floor(s): 1, 2
|
08/31/1998 |
102063810 |
01 |
A2 |
P APPROVED |
06/23/1999 |
0049789 PE |
Hinkley |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/01/2000 Installtion of sprinkler heads on the cellar leve
|
|
Work on Floor(s): CEL
|
08/28/1998 |
101938842 |
01 |
A3 |
R PERMIT-ENTIRE |
10/30/1998 |
0012074 RA |
SAWICKI |
|
NOT APPLICABLE
|
|
ERECTION OF FENCE
|
|
Work on Floor(s): 1
|
08/12/1998 |
101937763 |
01 |
A2 |
R PERMIT-ENTIRE |
01/12/1999 |
0021727 PE |
Grasso |
|
NOT APPLICABLE
|
|
Plumbing changes on the 1st floor as indicated on drawings.
|
|
Work on Floor(s): 001
|
08/12/1998 |
101937754 |
01 |
A2 |
X SIGNED OFF |
04/29/2002 |
0065551 PE |
Schipani |
|
NOT APPLICABLE
|
|
Mechanical changes on the 1st and 2nd floor as indicated on drawings.
|
|
Work on Floor(s): 001,002
|