FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
12/15/2011 |
120923386 |
01 |
A2 |
X SIGNED OFF |
10/03/2012 |
0068464 PE |
RINI |
|
NOT APPLICABLE
|
|
HEREWITH FILING TO REMOVE SPRINKLER SYSTEM IN CONJUNCTION WITH DEMOLITION
|
|
Work on Floor(s): CEL 001 thru 005
|
11/14/2011 |
120894764 |
01 |
DM |
X SIGNED OFF |
03/13/2012 |
0060597 PE |
SHAPIRO |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF FIVE STORY STRUCTURE, USING MECHANICAL MEANS.
|
|
Work on Floor(s): 001 thru 005
|
10/28/2011 |
120877747 |
01 |
A3 |
X SIGNED OFF |
07/06/2012 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): 001
|
08/27/2010 |
120456746 |
01 |
A3 |
X SIGNED OFF |
05/09/2012 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 21 L.F. AS PER PLAN AT
|
|
Work on Floor(s): OSP
|
04/03/1998 |
101521676 |
03 |
A2 |
D A/P ENTIRE |
04/03/1998 |
0015891 RA |
HAVERSON |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/07/1998
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
01/06/1998 |
101563050 |
06 |
A2 |
P APPROVED |
01/06/1998 |
0000065 PE |
BHATIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
12/16/1997 |
101521676 |
02 |
A2 |
P APPROVED |
12/16/1997 |
0015891 RA |
HAVERSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
11/05/1997 |
101563050 |
05 |
A2 |
G PAA FEE DUE |
11/05/1997 |
0000065 PE |
BHATIA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/05/1997
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
08/19/1997 |
101709661 |
01 |
A1 |
X SIGNED OFF |
12/19/2001 |
0015891 RA |
HAVERSON |
|
NOT APPLICABLE
|
|
NO WORK TO BE DONE UNDER THIS APPL. FILING HEREWITH CHANGE IN USE
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
07/07/1997 |
101563050 |
04 |
A2 |
X SIGNED OFF |
04/24/1998 |
0000065 PE |
BHATIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW GAS BOILER AND RE- LATED PIPING AS PER PLANS FILED
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
07/07/1997 |
101563050 |
03 |
A2 |
X SIGNED OFF |
04/24/1998 |
0041646 PE |
DESIMONE |
|
NOT APPLICABLE
|
|
INSTALLATION OF STRUCTURAL STEEL FOR A NEW CONVENIENCE STAIR FROM THE
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
07/07/1997 |
101563050 |
02 |
A2 |
X SIGNED OFF |
04/24/1998 |
0000065 PE |
BHATIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF HVAC SYSTEM, ROOFTOP A/C UNIT, NEW GAS BOILER, PLUMBING
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
07/03/1997 |
101563050 |
01 |
A2 |
X SIGNED OFF |
04/24/1998 |
0015891 RA |
HAVERSON |
|
NOT APPLICABLE
|
|
INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS ELEVATORS
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
05/21/1997 |
101521676 |
01 |
A2 |
X SIGNED OFF |
04/13/1999 |
0015891 RA |
HAVERSON |
|
NOT APPLICABLE
|
|
REMOVAL OF NON LOAD BEARING PARTITIONS AND FINISHES AS PER PLANS FILED
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|