| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 12/06/2017 |
140722467 |
PR |
I LAA SIGNED OFF |
05/02/2019 |
FSC 001014 |
GUINTA |
|
INSTALL 4 SPRINKLER HEADS ON 1ST FLOOR FED BY SUPPLY PIPE IN CELLAR USING
|
|
Work on Floor(s): CEL,OSP
|
| 03/16/2011 |
110533263 |
PR |
I LAA SIGNED OFF |
03/19/2012 |
MP 000909 |
SCARPINI |
|
DIRECTLY REPLACE 17 ROOF DRAINS AS FOLLOWS: ONE ON 11 FL, TWO ON 13 FL, TH
|
|
Work on Floor(s): 011,013,016,019,020 022 thru 023
|
| 11/16/2010 |
110522060 |
PR |
I LAA SIGNED OFF |
03/16/2011 |
FSC 000323 |
FULEP |
|
RE-ARRANGE 4 FIRE SPRINKLER HEADS WITH APPROXIMATELY 40'X1" PIPE ON THE 3R
|
|
Work on Floor(s): 003
|
| 11/02/2010 |
110520464 |
PR |
I LAA SIGNED OFF |
07/12/2011 |
MP 001851 |
BAUER |
|
REMOVE AND CAP AT 3RD FLOOR 3 URINALS, 12 TOILETS, 11 LAVATORIES, 2 SINKS
|
|
Work on Floor(s): 003
|
| 11/09/2009 |
110490834 |
PR |
E LAA FILED |
11/19/2009 |
FSC 000055 |
GUINTA |
|
JOB CLOSED 08 05 2019 EXTEND SIAMESE CONNECTION ON 42 STREET THRU TEMPORAR
|
|
Work on Floor(s): OSP,001
|
| 10/25/2005 |
102383500 |
PR |
I LAA SIGNED OFF |
03/17/2006 |
MP 001851 |
BAUER |
|
INSTALL A HAND SINK IN LOBBY 15' OF 1 1/2" OF PIPING THE NEWSTAND THE WATE
|
|
Work on Floor(s): 001
|
| 09/28/1998 |
101452884 |
PR |
E LAA FILED |
09/28/1998 |
MP 001011 |
CARBONE |
|
FOUND GAS LEAK ON TWO INCH GAS LINE IN THE BASEMENT HAVE TO CUT OUT APPROX
|
|
Work on Floor(s): 24
|
| 08/06/1991 |
100186380 |
PR |
I LAA SIGNED OFF |
07/11/1991 |
MP 000731 |
ROSS |
|
REMOVAL OF EXISTING ALVATORY AND CONDENSATE DRAIN IN ROOM 112 FILED IN
|
|
Work on Floor(s): 11, THR,U
|
| 01/08/1991 |
100099901 |
PR |
I LAA SIGNED OFF |
03/22/1991 |
MP 001060 |
DOBBIN |
|
REPAIR AND INSTALL DILUTION PH TANK AND PIPING FOR
|
|
Work on Floor(s): 4
|