 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/16/2019 |
123133448 |
03 |
A2 |
P APPROVED |
04/29/2019 |
|
FISKAA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 02/27/2019 |
121231363 |
06 |
A2 |
P APPROVED |
03/06/2019 |
|
TCHELIST |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 01/17/2019 |
121231363 |
05 |
A2 |
P APPROVED |
01/22/2019 |
|
TCHELIST |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 12/26/2018 |
123133448 |
02 |
A2 |
P APPROVED |
01/07/2019 |
|
FISKAA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 09/28/2018 |
121231363 |
04 |
A2 |
P APPROVED |
10/03/2018 |
|
TCHELIST |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 08/07/2018 |
121231363 |
03 |
A2 |
P APPROVED |
08/09/2018 |
|
TCHELIST |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 03/27/2018 |
121231363 |
02 |
A2 |
P APPROVED |
03/28/2018 |
|
TCHELIST |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 01/04/2018 |
123133448 |
01 |
A2 |
X SIGNED OFF |
12/24/2019 |
0074657 PE |
FISKAA |
|
NOT APPLICABLE
|
|
HEREBY FILING APPLICATION FOR THE INSTALLATION OF SPLIT HVAC UNIT, THE
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 05/26/2017 |
121231363 |
01 |
A2 |
X SIGNED OFF |
04/29/2019 |
0024032 RA |
TCHELIST |
|
NOT APPLICABLE
|
|
FILING APPLICATION FOR THE INTERIOR RENOVATION OF EXISTING 1 FAMILY TOWNHO
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 12/24/2015 |
120691778 |
06 |
A1 |
P APPROVED |
12/30/2015 |
|
INGUI |
|
AMENDED 04/24/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 03/09/2015 |
120691778 |
05 |
A1 |
P APPROVED |
03/13/2015 |
|
INGUI |
|
AMENDED 04/24/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 02/04/2015 |
120793374 |
04 |
A2 |
P APPROVED |
09/29/2015 |
|
MAZOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 01/29/2015 |
122241779 |
01 |
A2 |
X SIGNED OFF |
07/15/2016 |
0088010 PE |
DIVILIO |
|
NOT APPLICABLE
|
|
SPRINKLER AND MECHANICAL WORK BEING FILED IN CONJUNCTION WITH APPLICATION
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 005
|
| 01/08/2015 |
140295106 |
01 |
A3 |
X SIGNED OFF |
03/02/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL
|
|
Work on Floor(s): OSP
|
| 09/11/2014 |
120691778 |
04 |
A1 |
P APPROVED |
09/12/2014 |
|
INGUI |
|
AMENDED 04/24/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 09/17/2013 |
120793374 |
03 |
A2 |
P APPROVED |
10/03/2013 |
|
SILBERT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 09/13/2013 |
120691778 |
03 |
A1 |
P APPROVED |
09/17/2013 |
|
ROTHSTEI |
|
AMENDED 04/24/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 06/11/2013 |
140086813 |
01 |
A3 |
X SIGNED OFF |
05/19/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLAN. WORK SHALL COMPLY WITH 2008 BUI
|
|
Work on Floor(s): OSP
|
| 05/13/2013 |
120793374 |
02 |
A2 |
P APPROVED |
05/23/2013 |
|
SILBERT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 STRUCTURAL DRAWINGS FILED TO ADD NEW 5TH FL
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 04/20/2012 |
120691778 |
02 |
A1 |
P APPROVED |
04/24/2013 |
|
ROTHSTEI |
|
AMENDED 04/24/2013
|
|
POST APPROVAL AMENDMENT FOR 01 CONVERT MULTIPLE DWELLLING TO SINGLE FAMILY
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 08/16/2011 |
120793374 |
01 |
A2 |
X SIGNED OFF |
07/12/2016 |
0066773 PE |
MAZOR |
|
NOT APPLICABLE
|
|
STRUCTURAL DRAWINGS FILED TO ADD NEW 5TH FL REAR NEW EXTENSION AT CELLAR,
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 06/28/2011 |
120735776 |
01 |
A3 |
R PERMIT-ENTIRE |
06/30/2011 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/28/2016 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED
|
|
Work on Floor(s): OSP
|
| 06/16/2011 |
120627526 |
02 |
A2 |
P APPROVED |
06/30/2011 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/21/2015 REMODEL ALL APARTMENTS IN THE BUILDING. ONE APAR
|
|
Work on Floor(s): BAS 001 thru 004
|
| 05/17/2011 |
120691778 |
01 |
A1 |
X SIGNED OFF |
07/22/2016 |
0026595 RA |
INGUI |
|
AMENDED 04/24/2013
|
|
CONVERT MULTIPLE DWELLLING TO SINGLE FAMILY HOUSE.AND NEW 5TH FLOOR, ADD
|
|
Work on Floor(s): CEL,BAS 001 thru 005
|
| 03/09/2011 |
120627526 |
01 |
A2 |
R PERMIT-ENTIRE |
06/25/2013 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/21/2015 REMODEL ALL APARTMENTS IN THE BUILDING. ONE APAR
|
|
Work on Floor(s): BAS 001 thru 004
|
| 10/14/1998 |
101959016 |
01 |
A2 |
R PERMIT-ENTIRE |
01/26/1999 |
0049789 PE |
HINKLEY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/15/2015 MINOR INTERIOR CHANGES WITH MECH & PLBG
|
|
Work on Floor(s): BAS,4TH
|
| 03/23/1994 |
100790654 |
01 |
A1 |
X SIGNED OFF |
07/15/1994 |
0049789 PE |
HINKLEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF CONVENIENCE STAIR FROM 1ST TO 2ND FLOOR.BASEMENT,FIRST
|
|
Work on Floor(s): BNM,1FL,2FL
|