 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/23/2021 |
123485781 |
02 |
A2 |
P APPROVED |
06/24/2021 |
|
DERAMO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 009
|
| 12/29/2020 |
140996153 |
01 |
A2 |
X SIGNED OFF |
05/11/2021 |
0023066 RA |
LIBASCI |
|
NOT APPLICABLE
|
|
MINOR DEMOLITION OF NON BEARING PARTITIONS INTERIOR RENOVATION OF EXISTING
|
|
Work on Floor(s): 008
|
| 06/09/2020 |
140908267 |
01 |
A2 |
X SIGNED OFF |
02/17/2022 |
0031153 RA |
FASULO |
|
NOT APPLICABLE
|
|
INTERIOR AND MINOR EXTERIOR RENOVATION OF EXISTING APARTMENT ON THE 2ND FL
|
|
Work on Floor(s): 002
|
| 05/29/2020 |
123922835 |
01 |
A2 |
X SIGNED OFF |
05/14/2021 |
0039770 RA |
WANG |
|
NOT APPLICABLE
|
|
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING UNIT 4B LOCATED ON T
|
|
Work on Floor(s): 004
|
| 04/23/2020 |
123520635 |
02 |
A2 |
P APPROVED |
03/25/2021 |
|
CANTON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 12/27/2019 |
140821056 |
02 |
A3 |
P APPROVED |
12/27/2019 |
|
PHAGOO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/11/2019 |
123485781 |
01 |
A2 |
X SIGNED OFF |
08/26/2021 |
0038547 RA |
DERAMO |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR APARTMENT RENOVATIONS AS PER PLANS FILED. NO CHANGE IN
|
|
Work on Floor(s): 009
|
| 12/04/2018 |
140821056 |
01 |
A3 |
R PERMIT-ENTIRE |
12/30/2019 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF A 600 LB CAPACITY ELECTRIC MATERIAL ONLY HOIST DURING BLDG
|
|
Work on Floor(s): OSP
|
| 07/09/2018 |
123520635 |
01 |
A2 |
X SIGNED OFF |
04/19/2021 |
0046441 PE |
CANTON |
|
NOT APPLICABLE
|
|
FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): FAC
|
| 05/01/2018 |
140755617 |
02 |
A2 |
P APPROVED |
05/10/2018 |
|
NISONOV |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 APPLICATION FILED FOR INSTALLATION OF DUCTL
|
|
Work on Floor(s): CEL,LOB,OSP
|
| 04/24/2018 |
140755617 |
01 |
A2 |
R PERMIT-ENTIRE |
05/14/2018 |
0091692 PE |
NISONOV |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR INSTALLATION OF DUCTLESS SPLIT SYSTEM IN REAR YARD T
|
|
Work on Floor(s): CEL,LOB,OSP
|
| 01/23/2018 |
123191553 |
01 |
A2 |
R PERMIT-ENTIRE |
03/21/2018 |
0091145 PE |
WALCOTT |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS FOR MINOR KITCHEN AND BATHROOM RENOVATION OF AN EXISTI
|
|
Work on Floor(s): 012
|
| 07/10/2017 |
123327079 |
01 |
A2 |
X SIGNED OFF |
06/05/2018 |
0016162 RA |
TURNER |
|
NOT APPLICABLE
|
|
MINOR RENOVATION TO UNIT 8AB
|
|
Work on Floor(s): 008
|
| 09/03/2015 |
122517071 |
01 |
A2 |
X SIGNED OFF |
06/17/2016 |
0015595 RA |
PORTER |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING APT. 7A ON THE SEVENTH FLOOR.WORK INCLUDES GENERAL
|
|
Work on Floor(s): 007
|
| 07/07/2015 |
122435953 |
01 |
A2 |
X SIGNED OFF |
10/07/2016 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. INSTALL NEW
|
|
Work on Floor(s): CEL,ROF
|
| 04/15/2015 |
122370102 |
01 |
A2 |
X SIGNED OFF |
01/27/2017 |
0073954 PE |
ESTILOW |
|
NOT APPLICABLE
|
|
MODIFICATIONS TO THE EXISTING HVAC SYSTEM AS PER PLANS (HVAC UPGRADE.) NO
|
|
Work on Floor(s): PEN,ROF
|
| 03/31/2015 |
122347889 |
01 |
A2 |
X SIGNED OFF |
03/21/2016 |
0015569 RA |
WILLCOX |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO RENOVATE APT 6B ON 6TH FLOOR TO INCLUDE NEW WOOD F
|
|
Work on Floor(s): 6TH
|
| 02/23/2015 |
121135084 |
03 |
A2 |
P APPROVED |
04/16/2015 |
|
SILVER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 12/04/2014 |
121135084 |
02 |
A2 |
P APPROVED |
12/10/2014 |
|
SILVER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 02/27/2014 |
121926880 |
01 |
A2 |
R PERMIT-ENTIRE |
04/02/2015 |
0014327 RA |
ZIMMERMA |
|
NOT APPLICABLE
|
|
FLASHING REPLACEMENT ALONG THE EXTERIOR PENTHOUSE WALLS. NO CHANGE IN USE
|
|
Work on Floor(s): ROF
|
| 10/28/2013 |
121825640 |
01 |
A2 |
X SIGNED OFF |
03/24/2016 |
0090189 PE |
BRIJLALL |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW BACKFLOR PREVENTION DEVICE. NO CHANGE TO USE, EGRESS
|
|
Work on Floor(s): CEL
|
| 08/21/2013 |
121642222 |
02 |
A2 |
X SIGNED OFF |
03/25/2014 |
0015782 RA |
ALLON |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK FOR APT. RENOVATION NO CHANGE TO USE OCCUPANCY OR EGRES
|
|
Work on Floor(s): 007,008
|
| 07/16/2013 |
121642222 |
01 |
A2 |
X SIGNED OFF |
03/25/2014 |
0015782 RA |
ALLON |
|
NOT APPLICABLE
|
|
RESPECTFULLY PROPOSE INTERIOR ALTERATIONS AS PER THE PLANS REMOVING A
|
|
Work on Floor(s): 007 thru 008
|
| 05/20/2013 |
121135084 |
01 |
A2 |
R PERMIT-ENTIRE |
01/27/2014 |
0020651 RA |
SILVER |
|
NOT APPLICABLE
|
|
OT/PL/MH WORKTYPE IS FILED FOR INTERIOR ALTERATION/PARTIAL DEMO,PLUMBING A
|
|
Work on Floor(s): 006
|
| 04/01/2013 |
121440967 |
02 |
A2 |
P APPROVED |
05/29/2013 |
|
LANE |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/11/2017
|
|
Work on Floor(s): BAS
|
| 03/11/2013 |
121551999 |
01 |
A2 |
X SIGNED OFF |
09/09/2014 |
0025077 RA |
CARRANO |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION, INCLUDES DEMOLITION OF PARTITION, INSTALLATION WITH
|
|
Work on Floor(s): 004
|
| 12/18/2012 |
121440967 |
01 |
A2 |
R PERMIT-ENTIRE |
04/11/2013 |
0073324 PE |
LANE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/11/2017 GAS CONVERSION. NO CHANGE IN USE. EGRESS OR OCCU
|
|
Work on Floor(s): BAS
|
| 06/05/2012 |
120832509 |
05 |
A2 |
P APPROVED |
06/05/2012 |
|
CHINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 010
|
| 06/04/2012 |
120832509 |
04 |
A2 |
P APPROVED |
06/22/2012 |
|
CHINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 010
|
| 05/09/2012 |
120163250 |
05 |
A2 |
P APPROVED |
08/02/2012 |
|
TAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 008
|
| 12/13/2011 |
120832509 |
03 |
A2 |
X SIGNED OFF |
03/04/2013 |
0059584 PE |
RUBIANO |
|
NOT APPLICABLE
|
|
MECHANICAL WORK TYPE FILED IN ORDER TO FILE TR-2 FOR HVAC INSPECTIONS AS P
|
|
Work on Floor(s): 010
|
| 09/29/2011 |
120832509 |
02 |
A2 |
X SIGNED OFF |
03/04/2013 |
0031606 RA |
CHINA |
|
NOT APPLICABLE
|
|
RELOCATE EXISTING GAS METER
|
|
Work on Floor(s): 010
|
| 09/29/2011 |
120832509 |
01 |
A2 |
X SIGNED OFF |
03/04/2013 |
0031606 RA |
CHINA |
|
NOT APPLICABLE
|
|
CONSTRUCT INTERIOR NON-LOAD BEARING PARTITIONS,REPLACE AND RELOCATE PLUMBI
|
|
Work on Floor(s): 010
|
| 09/12/2011 |
120703275 |
02 |
A2 |
P APPROVED |
09/27/2011 |
|
TAYLOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF FOUR (4) THROUGH-WALL AIR C
|
|
Work on Floor(s): 011
|
| 05/25/2011 |
120703275 |
01 |
A2 |
X SIGNED OFF |
11/10/2011 |
0022383 RA |
TAYLOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF FOUR (4) THROUGH-WALL AIR CONDITIONING UNITS & WALL SLEEVE
|
|
Work on Floor(s): 011
|
| 12/11/2009 |
120163250 |
04 |
A2 |
P APPROVED |
12/21/2009 |
|
TAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 008
|
| 12/08/2009 |
120163250 |
03 |
A2 |
P APPROVED |
12/21/2009 |
|
ROLSTON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 10/27/2009 |
120115954 |
02 |
A2 |
P APPROVED |
12/08/2009 |
|
BORGES |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 09/24/2009 |
120163250 |
02 |
A2 |
X SIGNED OFF |
09/14/2012 |
0077896 PE |
TAN |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION AND
|
|
Work on Floor(s): 008
|
| 09/24/2009 |
120163250 |
01 |
A2 |
X SIGNED OFF |
09/14/2012 |
0029147 RA |
ROLSTON |
|
NOT APPLICABLE
|
|
RENOVATION AND COMBINATION OF EXISTING APARTMENTS 8A AND 8B ON THE 8TH FLO
|
|
Work on Floor(s): 008
|