 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 01/11/2018 |
140730608 |
PR |
E LAA FILED |
01/11/2018 |
MP 002384 |
SCHWAMB, |
|
IN APT# 2E ON THE 2ND FLOOR, IN BATHROOM REMOVE (1) BATH-TUB AND REPLACE W
|
|
Work on Floor(s): 002
|
| 06/16/2017 |
140657171 |
PR |
I LAA SIGNED OFF |
03/15/2018 |
MP 002084 |
MORALES |
|
ON 008 FLOOR / APARTMENT 8C: DIRECT REPLACEMENT 1 BATHTUB, 1 LAVATORY, AND
|
|
Work on Floor(s): 008
|
| 03/07/2016 |
140466519 |
PR |
E LAA FILED |
03/07/2016 |
OBI 005336 |
ENNIST |
|
CONVERT THE BOILER FROM #6 OIL TO #2 OIL. THE PRIMARY OIL HEATER WILL BE
|
|
Work on Floor(s): 001,002
|
| 02/13/2008 |
103875843 |
PR |
I LAA SIGNED OFF |
03/27/2008 |
MP 001370 |
QUARATIN |
|
IN THE BATHROOM REMOVE BATHTUB AND INSTALL SHOWER STALL IN ITS PLACE. INST
|
|
Work on Floor(s): PEN
|