FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
07/09/2014 |
120762790 |
03 |
A1 |
G PAA FEE DUE |
07/09/2014 |
|
BARTLE |
|
GRANTED 10/18/2011
|
|
DOC WITHDRAWN 07/16/2014
|
|
Work on Floor(s): 004,0PH,MEZ
|
07/07/2014 |
120762790 |
02 |
A1 |
P APPROVED |
07/08/2014 |
|
BARTLE |
|
GRANTED 10/18/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004,0PH,MEZ
|
10/25/2013 |
140128378 |
01 |
A3 |
X SIGNED OFF |
02/21/2014 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
10/02/2012 |
121394990 |
01 |
A2 |
X SIGNED OFF |
03/03/2014 |
0017017 RA |
JAMES |
|
NOT APPLICABLE
|
|
FACADE REPAIR INCLUDING REPLACEMENT OF STUCCO COATING AS PER PLANS FILED
|
|
Work on Floor(s): FAC
|
07/22/2011 |
120762790 |
01 |
A1 |
X SIGNED OFF |
07/17/2014 |
0163271 RA |
BARTLE |
|
GRANTED 10/18/2011
|
|
RENOVATIONS TO THE EXISTING DUPLEX APARTMENT LOCATED ON 4TH FLOOR AND PENT
|
|
Work on Floor(s): 004,0PH,MEZ
|
11/23/2009 |
110237994 |
02 |
A2 |
P APPROVED |
12/04/2009 |
|
JAMES |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
08/04/2008 |
110306446 |
01 |
A3 |
X SIGNED OFF |
05/06/2014 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
INSTALL SIDEWALK SHED A TOTAL OF 20 L.F.AT 309 WEST 82 STREET. DURING REME
|
|
Work on Floor(s): 001
|
08/04/2008 |
110306428 |
01 |
A3 |
R PERMIT-ENTIRE |
03/16/2009 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
ERECT PIPE SCAFFOLD AS PER PLAN AT 309 WEST 82 STREET. DURING REMEDIAL REP
|
|
Work on Floor(s): 001
|
07/09/2008 |
110237994 |
01 |
A2 |
X SIGNED OFF |
12/09/2009 |
0017017 RA |
JAMES |
|
NOT APPLICABLE
|
|
FACADE & MANSARD ROOF & DORMER REPAIR
|
|
Work on Floor(s): ROF 001 thru 004
|
04/16/2008 |
110146155 |
01 |
A2 |
R PERMIT-ENTIRE |
05/15/2008 |
0023916 RA |
INTILI |
|
NOT APPLICABLE
|
|
MINOR INTERIOR PARTITION CHANGES WITH GENERAL CONSTRUCTION AND PLUMBING WO
|
|
Work on Floor(s): CEL
|
04/25/2007 |
104748775 |
01 |
A3 |
X SIGNED OFF |
05/06/2014 |
OT |
MIRANDA |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 20 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
04/25/2007 |
104747981 |
01 |
A3 |
R PERMIT-ENTIRE |
04/25/2007 |
0018466 RA |
WHITE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 20 LINEAR FEET X 60 FEET HIGH PIPE SCAFFOLD TO
|
|
Work on Floor(s): OSP
|
08/19/2004 |
103584587 |
02 |
A2 |
P APPROVED |
04/21/2005 |
0066311 PE |
HONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
10/10/2003 |
103584587 |
01 |
A2 |
X SIGNED OFF |
08/03/2005 |
0066311 PE |
HONG |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT INCLUDING REMOVAL AND INSTALLATION OF
|
|
Work on Floor(s): 002
|
03/03/2003 |
103401310 |
01 |
A3 |
X SIGNED OFF |
05/06/2014 |
|
SIWIEC |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLDING 25' WID E BY 30' HIGH. NO CHANGE IN USE
|
|
Work on Floor(s): GRD
|
11/15/2002 |
103315191 |
01 |
A2 |
X SIGNED OFF |
05/27/2003 |
0017017 RA |
JAMES |
|
NOT APPLICABLE
|
|
REPAIR OF DEFECTIVE MASONRY ON STREET ELEVATION : 4TH FLOOR PARAPET &
|
|
Work on Floor(s): 3, 4
|
08/08/2002 |
103227704 |
01 |
A3 |
X SIGNED OFF |
05/06/2014 |
|
GREGORIO |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SHED 20' DURING FACADE REPAIR. NO
|
|
Work on Floor(s): GRD
|
08/08/2002 |
103225822 |
01 |
A3 |
X SIGNED OFF |
05/06/2014 |
0654301 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD 20' LONG BY 30' HIGH DURING FACADE REPAIR.
|
|
Work on Floor(s): GRD
|
11/29/1995 |
101158435 |
01 |
A2 |
J P/E DISAPPROVED |
12/04/1995 |
0019756 RA |
TURNER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/08/1996 INSTALL GAS FIRED FORCED AIR HEATING UNIT
|
|
Work on Floor(s): 4, PEN
|
11/09/1994 |
100938611 |
01 |
A2 |
X SIGNED OFF |
03/07/1996 |
0019756 RA |
TURNER |
|
NOT APPLICABLE
|
|
MOVE EXISTING PENTHOUSE BACK APPROXIMATELY 16' INCREASE S.F.
|
|
Work on Floor(s): 4, PH
|