| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/23/2025 |
121203884 |
21 |
NB |
P APPROVED |
02/18/2025 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 06/21/2024 |
121203884 |
20 |
NB |
P APPROVED |
06/24/2024 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 06/17/2024 |
121203884 |
19 |
NB |
P APPROVED |
06/20/2024 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 11/15/2023 |
121203884 |
18 |
NB |
P APPROVED |
11/16/2023 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 08/10/2023 |
121203884 |
17 |
NB |
P APPROVED |
08/14/2023 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 05/10/2023 |
121203884 |
16 |
NB |
P APPROVED |
05/11/2023 |
0072050 PE |
GERAZOUN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 014
|
| 04/20/2023 |
121203884 |
15 |
NB |
P APPROVED |
04/27/2023 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 12/08/2022 |
121203884 |
14 |
NB |
P APPROVED |
01/12/2023 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 10/17/2022 |
141002965 |
03 |
A2 |
D A/P ENTIRE |
05/23/2024 |
|
SCHMERZL |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/28/2024
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 014
|
| 01/12/2022 |
121203884 |
13 |
NB |
P APPROVED |
01/12/2023 |
0072050 PE |
GERAZOUN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 014
|
| 11/08/2021 |
121203884 |
12 |
NB |
P APPROVED |
11/17/2022 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 10/14/2021 |
141002965 |
02 |
A2 |
P APPROVED |
10/26/2021 |
|
SCHMERZL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 014
|
| 09/07/2021 |
140725696 |
03 |
A2 |
P APPROVED |
09/15/2021 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 09/03/2021 |
121203884 |
11 |
NB |
P APPROVED |
09/13/2021 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 08/26/2021 |
121203884 |
10 |
NB |
P APPROVED |
11/17/2021 |
0072050 PE |
GERAZOUN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 014
|
| 08/03/2021 |
140725696 |
02 |
A2 |
P APPROVED |
08/12/2021 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 07/16/2021 |
141003955 |
01 |
A2 |
X SIGNED OFF |
05/25/2023 |
0020635 RA |
SCHMERZL |
|
NOT APPLICABLE
|
|
HEREWITH FILING TEMPORARY USE PERMIT FOR MODEL APARTMENT ON 5TH FLOOR UNIT
|
|
Work on Floor(s): 005
|
| 07/15/2021 |
121203884 |
09 |
NB |
P APPROVED |
08/06/2021 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 06/07/2021 |
141002965 |
01 |
A2 |
X SIGNED OFF |
05/30/2024 |
0020635 RA |
SCHMERZL |
|
NOT APPLICABLE
|
|
HEREWITH FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NB APPLICATION
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 014
|
| 12/02/2020 |
121203884 |
08 |
NB |
P APPROVED |
12/03/2020 |
0072050 PE |
GERAZOUN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 014
|
| 11/25/2020 |
123904775 |
01 |
SC |
U COMPLETED |
08/09/2021 |
0036207 RA |
CHEN |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR CONDO TAX LOT APPORTIONMENT.TAX LOT 12-01- 1221.
|
|
Work on Floor(s): 001 thru 014
|
| 04/28/2020 |
123794796 |
01 |
A2 |
X SIGNED OFF |
09/05/2024 |
0011452 RA |
BEE |
|
NOT APPLICABLE
|
|
REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS AS PER PL
|
|
Work on Floor(s): 001
|
| 04/21/2020 |
140897322 |
01 |
A2 |
D A/P ENTIRE |
04/21/2020 |
0011452 RA |
BEE |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 06/20/2020 REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEAR
|
|
Work on Floor(s): 001
|
| 04/21/2020 |
123910777 |
01 |
A2 |
H P/E IN PROCESS |
04/30/2020 |
0011452 RA |
BEE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/18/2021 REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEA
|
|
Work on Floor(s): 001
|
| 02/25/2020 |
140860450 |
03 |
A3 |
P APPROVED |
02/27/2020 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 6,000 LB DUAL PERSONNEL/MAT
|
|
Work on Floor(s): OSP
|
| 02/11/2020 |
140860450 |
02 |
A3 |
P APPROVED |
02/14/2020 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 02/05/2020 |
123401826 |
02 |
A2 |
P APPROVED |
02/06/2020 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 014
|
| 09/17/2019 |
121203884 |
07 |
NB |
P APPROVED |
03/18/2020 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 08/30/2019 |
140860450 |
01 |
A3 |
X SIGNED OFF |
07/19/2021 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF 6,000 LB DUAL PERSONNEL/MATERIAL HOIST CAR AS PER PLANS
|
|
Work on Floor(s): OSP
|
| 07/16/2019 |
140860316 |
01 |
A3 |
H P/E IN PROCESS |
07/16/2019 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 09/14/2019 INSTALLATION OF 6000 LB DUAL CAR HOIST AS PER PLAN
|
|
Work on Floor(s): OSP
|
| 02/04/2019 |
140830527 |
01 |
A3 |
H P/E IN PROCESS |
02/04/2019 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 04/05/2019 INSTALLATION OF OVERHEAD/ROOF PROTECTION AS PER PL
|
|
Work on Floor(s): OSP
|
| 11/16/2018 |
121203884 |
06 |
NB |
P APPROVED |
11/27/2018 |
|
CHEN |
|
AMENDED 08/06/2021
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 08/23/2018 |
123401826 |
01 |
A2 |
X SIGNED OFF |
07/08/2021 |
0072050 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR THE INSTALLATION OF A PRESSURIZED STANDPIPE ALARM SYST
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 014
|
| 04/17/2018 |
123458793 |
01 |
A2 |
X SIGNED OFF |
06/04/2024 |
0072050 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 014
|
| 04/09/2018 |
140741204 |
01 |
A3 |
X SIGNED OFF |
01/03/2023 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
BUILDING PAVEMENT PLAN FILED IN CONJUNCTION WITH NB#121203884 FOR A STREET
|
|
Work on Floor(s): OSP
|
| 12/21/2017 |
123165403 |
01 |
A2 |
R PERMIT-ENTIRE |
04/17/2018 |
0087797 PE |
SANTIAGO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/12/2019 FILING HEREWITH FOR INTERIOR REMOVAL AS PER PLANS
|
|
Work on Floor(s): BAS,001,MEZ,ROF
|
| 02/13/2018 |
140725696 |
01 |
A2 |
X SIGNED OFF |
03/29/2022 |
0072050 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB#12120388
|
|
Work on Floor(s): SC, CEL,ROF 001 thru 014
|
| 11/17/2017 |
121203884 |
05 |
NB |
R PERMIT-ENTIRE |
06/19/2019 |
0072575 PE |
KAECK |
|
AMENDED 08/06/2021
|
|
SUBSEQUENT FILING FOR SHEETING, SHORING AND EXCAVATION WORK ASSOCIATED WIT
|
|
Work on Floor(s): SC1,CEL
|
| 08/18/2017 |
121203884 |
04 |
NB |
R PERMIT-ENTIRE |
06/19/2019 |
0072050 PE |
GERAZOUN |
|
AMENDED 08/06/2021
|
|
SUBSEQUENT FILING FOR PLUMBING AND MECHANICAL WORK ASSOCIATED WITH NB
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 014
|
| 08/18/2017 |
121203884 |
03 |
NB |
R PERMIT-ENTIRE |
06/19/2019 |
0064095 PE |
MURRAY |
|
AMENDED 08/06/2021
|
|
SUBSEQUENT FILING FOR SUPERSTRUCTURE WORK ASSOCIATED WITH THE NEW BUILDING
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 014
|