 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/28/2020 |
140931516 |
01 |
A3 |
P APPROVED |
07/28/2020 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
PROPOSED FACADE SSP FILING (AS ALT3) IN CONJUNCTION WITH DOB JOB #: 14092
|
|
Work on Floor(s): FAC,ROF 001 thru 015
|
| 07/22/2020 |
140921448 |
01 |
A2 |
X SIGNED OFF |
08/25/2021 |
0060694 PE |
PORCELLO |
|
NOT APPLICABLE
|
|
FACADE REPAIRS & ASSOCIATED WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN
|
|
Work on Floor(s): FAC
|
| 03/26/2020 |
140894058 |
01 |
A2 |
H P/E IN PROCESS |
03/26/2020 |
0060694 PE |
PORCELLO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 05/25/2020 FACADE REPAIRS & ASSOCIATED WORK AS PER PLANS FILE
|
|
Work on Floor(s): FAC
|
| 02/26/2020 |
140888868 |
01 |
A2 |
X SIGNED OFF |
08/04/2020 |
0095364 PE |
ROMAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH
|
|
Work on Floor(s): 004
|
| 08/27/2018 |
123048905 |
02 |
A3 |
P APPROVED |
10/31/2018 |
0087018 PE |
CONNOLLY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 05/15/2018 |
140765358 |
01 |
A2 |
X SIGNED OFF |
09/07/2018 |
0039316 RA |
AKERMAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH.
|
|
Work on Floor(s): 015
|
| 11/16/2017 |
140717286 |
01 |
A2 |
X SIGNED OFF |
08/07/2018 |
0095847 PE |
ARENA |
|
NOT APPLICABLE
|
|
REPLACE GAS/OIL BURNER ON NYC BOILER NO. MD41089-01. CHANGE GRADE OF FUEL
|
|
Work on Floor(s): CEL
|
| 03/21/2017 |
123048905 |
01 |
A3 |
X SIGNED OFF |
06/14/2019 |
0087018 PE |
CONNOLLY |
|
NOT APPLICABLE
|
|
REPLACEMENT OF EXISTING TELECOMMUNICATIONS ANTENNAS WITH
|
|
Work on Floor(s): ROF
|
| 01/19/2017 |
122998364 |
01 |
A3 |
X SIGNED OFF |
07/07/2021 |
0073766 PE |
ABUJAWDE |
|
NOT APPLICABLE
|
|
INSTALL NEW TELECOMMUNICATIONS CABINETS, RELATED DUNNAGE AND RELATED ANTEN
|
|
Work on Floor(s): RF
|
| 08/07/2015 |
140387230 |
01 |
A2 |
X SIGNED OFF |
11/17/2015 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL METAL CHIMNEY LINER PER PLANS.
|
|
Work on Floor(s): CEL,ROF 001 thru 015
|
| 06/17/2015 |
120793356 |
06 |
A1 |
P APPROVED |
06/25/2015 |
|
ROTHSTEI |
|
GRANTED 11/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 11/13/2014 |
120793356 |
05 |
A1 |
P APPROVED |
12/30/2014 |
|
ROTHSTEI |
|
GRANTED 11/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 10/22/2014 |
140269028 |
01 |
A3 |
X SIGNED OFF |
01/16/2015 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 08/26/2014 |
120793356 |
04 |
A1 |
P APPROVED |
09/25/2014 |
|
ROTHSTEI |
|
GRANTED 11/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 08/07/2014 |
121797948 |
03 |
A2 |
P APPROVED |
08/08/2014 |
|
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 07/23/2014 |
140230499 |
01 |
A2 |
H P/E IN PROCESS |
07/23/2014 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/18/2014 INSTALL METAL CHIMNEY LINER PER PLANS.
|
|
Work on Floor(s): CEL,ROF 001 thru 015
|
| 07/10/2014 |
122034477 |
02 |
A2 |
P APPROVED |
07/17/2014 |
|
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 07/02/2014 |
122044689 |
01 |
A2 |
X SIGNED OFF |
08/07/2014 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
SIDEWALK REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY U
|
|
Work on Floor(s): GRO
|
| 06/12/2014 |
122037624 |
01 |
A2 |
X SIGNED OFF |
11/17/2014 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL NEW GAS SERVICE, METER AND PIPING AND CONNECT TO EXISTING GAS/OIL
|
|
Work on Floor(s): CEL
|
| 06/10/2014 |
122034477 |
01 |
A2 |
X SIGNED OFF |
11/25/2014 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
PLUMBING WORK FILED IN CONJUNCTION WITH ALTERATION 1 APPLICATION 120793356
|
|
Work on Floor(s): CEL,001
|
| 05/13/2014 |
121797948 |
02 |
A2 |
P APPROVED |
08/07/2014 |
|
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 02/04/2014 |
120793356 |
03 |
A1 |
P APPROVED |
03/13/2014 |
|
ROTHSTEI |
|
GRANTED 11/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01 CONVERT FIRST FL APARTMENT TO COMMECIAL SPA
|
|
Work on Floor(s): 001
|
| 10/01/2013 |
121797948 |
01 |
A2 |
X SIGNED OFF |
11/25/2014 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
INSTALL NEW AIR CONDITIONING UNIT ON FIRST FLOOR
|
|
Work on Floor(s): 001
|
| 07/02/2013 |
121703406 |
01 |
A3 |
X SIGNED OFF |
12/10/2013 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 07/02/2013 |
121703424 |
01 |
A3 |
X SIGNED OFF |
11/25/2013 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIR AS PER PLAN. NO
|
|
Work on Floor(s): OSP
|
| 06/04/2013 |
121631993 |
01 |
A2 |
X SIGNED OFF |
11/10/2014 |
0075376 PE |
SCHERER |
|
NOT APPLICABLE
|
|
INSTALLATION OF ADDITIONAL HVAC EQUIPMENT FOR EXISTING TELECOMMUNICATIONS
|
|
Work on Floor(s): RF
|
| 08/27/2012 |
121355238 |
01 |
A3 |
X SIGNED OFF |
07/26/2013 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO
|
|
Work on Floor(s): OSP
|
| 08/02/2012 |
121176921 |
01 |
A3 |
X SIGNED OFF |
07/01/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 165' LONG AS PER
|
|
Work on Floor(s): 001
|
| 09/13/2011 |
120793356 |
01 |
A1 |
X SIGNED OFF |
03/03/2016 |
0026466 RA |
ROTHSTEI |
|
GRANTED 11/15/2012
|
|
CONVERT FIRST FL APARTMENT TO COMMECIAL SPACE. ADD HORIZONTAL EXTENSION.
|
|
Work on Floor(s): 001
|
| 08/16/2011 |
120793356 |
02 |
A1 |
X SIGNED OFF |
03/03/2016 |
0061752 PE |
LING |
|
GRANTED 11/15/2012
|
|
STRUCTURAL PLANS BEING FILED IN CONJUNCTION WITH ALTERATION 1 JOB TO CONV
|
|
Work on Floor(s): 001
|
| 02/01/2011 |
120593447 |
01 |
A3 |
X SIGNED OFF |
10/16/2013 |
0033662 RA |
MAYNARD |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 248'LONG X 8'-12'
|
|
Work on Floor(s): 001
|
| 10/29/2010 |
120399416 |
02 |
A2 |
P APPROVED |
11/05/2010 |
|
AGNETA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 10/15/2010 |
120502688 |
01 |
A3 |
X SIGNED OFF |
02/03/2014 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 250 LINEAR FEET BY 14 FEET APPROXIMATE HIGH HEAVY DUTY SI
|
|
Work on Floor(s): OSP
|
| 06/29/2010 |
120399416 |
01 |
A2 |
X SIGNED OFF |
02/10/2014 |
0018076 RA |
AGNETA |
|
NOT APPLICABLE
|
|
FILING FOR FACADE RESTORATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHA
|
|
Work on Floor(s): FAC
|
| 06/21/2007 |
104809218 |
01 |
A3 |
X SIGNED OFF |
02/02/2010 |
0075384 PE |
TOMS |
|
NOT APPLICABLE
|
|
INSTALLING TELELCOMMUNICATIONS CABINETSWITH RELATED DUNNAGE AND RELATED
|
|
Work on Floor(s): ROF
|
| 11/21/2005 |
104294130 |
01 |
A2 |
X SIGNED OFF |
09/19/2014 |
0079980 PE |
MEDITZ |
|
NOT APPLICABLE
|
|
INSTALL REPLACEMENT 4500 GALLON ABOVEGROUND FUEL OIL TANK IN EXISTING
|
|
Work on Floor(s): CEL
|
| 08/12/2002 |
103227054 |
01 |
A2 |
X SIGNED OFF |
11/25/2002 |
0053183 PE |
Dooley |
|
NOT APPLICABLE
|
|
Exterior facade repairs, consisting of repointing. No change to use, egre
|
| 07/16/2002 |
103214558 |
01 |
A3 |
X SIGNED OFF |
11/08/2013 |
|
ZAHARIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED 112'DURING FACADE REPAIR NO CHA
|
|
Work on Floor(s): GRD
|
| 02/26/2002 |
103071097 |
02 |
A2 |
X SIGNED OFF |
11/22/2002 |
0021027 RA |
BEALS |
|
NOT APPLICABLE
|
|
RELATED HVAC ON ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): ROF
|
| 01/14/2002 |
103071097 |
01 |
A2 |
X SIGNED OFF |
11/22/2002 |
0021027 RA |
BEALS |
|
NOT APPLICABLE
|
|
INSTALLING TELECOMMUNICATION SHELTER ON ROOF WITH RELATED DUNNAGE,
|
|
Work on Floor(s): ROF
|