| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/19/2019 |
120539444 |
10 |
A1 |
P APPROVED |
03/05/2019 |
|
SAMMONS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 05/10/2018 |
120539444 |
09 |
A1 |
P APPROVED |
06/12/2018 |
|
SAMMONS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 12/11/2017 |
101360493 |
03 |
A2 |
P APPROVED |
12/19/2017 |
|
SALAMON |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/14/2018
|
|
Work on Floor(s): BAS
|
| 04/24/2015 |
140321408 |
01 |
A2 |
X SIGNED OFF |
05/27/2016 |
0016284 RA |
TORABY |
|
NOT APPLICABLE
|
|
INSTALLATION OF WOOD JOISTS AT 1ST FLOOR FRAMING, 2-HR RATED ENCLOSURE AT
|
|
Work on Floor(s): BAS,CEL
|
| 04/01/2015 |
140327493 |
01 |
A3 |
X SIGNED OFF |
07/07/2016 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 06/19/2014 |
120539444 |
08 |
A1 |
P APPROVED |
07/17/2014 |
|
SAMMONS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 09/09/2013 |
120539444 |
07 |
A1 |
P APPROVED |
10/17/2013 |
|
SAMMONS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 08/12/2013 |
120539444 |
06 |
A1 |
P APPROVED |
08/20/2013 |
0074163 PE |
LUCZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 04/20/2012 |
121052751 |
01 |
A3 |
X SIGNED OFF |
07/24/2012 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SHORING AS PER PLANS. DURING REMEDIAL REPAIR, WO
|
|
Work on Floor(s): OSP
|
| 11/24/2010 |
120539444 |
04 |
A1 |
X SIGNED OFF |
04/09/2019 |
0074163 PE |
LUCZAK |
|
NOT APPLICABLE
|
|
SPRINKLER WORK IN CONJUNCTION WITH THE CONVERSION AND RENOVATION OF EXISTI
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 11/24/2010 |
120539444 |
03 |
A1 |
X SIGNED OFF |
04/09/2019 |
0063244 PE |
GIBBLE |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK IN CONJUNCTION WITH THE CONVERSION AND RENOVATION OF EXIST
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 11/24/2010 |
120539444 |
02 |
A1 |
X SIGNED OFF |
04/09/2019 |
0038964 PE |
GREEN |
|
NOT APPLICABLE
|
|
MECHANICAL WORK IN CONJUNCTION WITH THE CONVERSION AND RENOVATION OF EXIST
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 11/24/2010 |
120539444 |
01 |
A1 |
X SIGNED OFF |
04/09/2019 |
0021948 RA |
SAMMONS |
|
NOT APPLICABLE
|
|
PLUMBING WORK IN CONJUNCTION WITH THE CONVERSION AND RENOVATION OF EXISTIN
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 12/10/1997 |
101360493 |
02 |
A2 |
P APPROVED |
12/16/1997 |
0060930 PE |
SALAMON |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/14/2018
|
|
Work on Floor(s): BAS
|
| 08/06/1996 |
101360493 |
01 |
A2 |
R PERMIT-ENTIRE |
08/12/1997 |
0060930 PE |
SALAMON |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/14/2018 INSTALLATION OF BOILER AND HOT WATER HEATER. NO CH
|
|
Work on Floor(s): BAS
|
| 07/21/1995 |
101090748 |
01 |
A1 |
R PERMIT-ENTIRE |
11/04/1996 |
0609301 PE |
SALAMON |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/30/2012 INSTALLATION OF NEW PARTITIONS.REMOVAL OF EXISTIN
|
|
Work on Floor(s): BAS,2FL,3FL
|
|
120539444 |
05 |
A1 |
A PRE-FILED |
08/07/2013 |
|
LUCZAK |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/29/2013
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|