| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/23/2020 |
140870582 |
02 |
A2 |
P APPROVED |
08/12/2020 |
0070906 PE |
COWLEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 012
|
| 09/25/2019 |
140870582 |
01 |
A2 |
X SIGNED OFF |
08/17/2020 |
0070906 PE |
COWLEY |
|
NOT APPLICABLE
|
|
ELEVATOR EXTENSION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS,
|
|
Work on Floor(s): 012
|
| 09/24/2019 |
140870573 |
01 |
A2 |
H P/E IN PROCESS |
09/24/2019 |
0070906 PE |
COWLEY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/24/2019 ELEVATOR EXTENSION AS PER PLANS FILED HEREWITH. N
|
|
Work on Floor(s): 001,012
|
| 09/24/2019 |
140870528 |
01 |
A2 |
H P/E IN PROCESS |
09/24/2019 |
0070906 PE |
COWLEY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/24/2019 ELEVATOR EXTENSION AS PER PLANS FILED HEREWITH. N
|
|
Work on Floor(s): 001,012
|
| 11/14/2018 |
123305654 |
02 |
A2 |
P APPROVED |
01/08/2019 |
|
EACKER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC,OPS,GND 001 thru 012
|
| 08/27/2018 |
123126624 |
01 |
A2 |
X SIGNED OFF |
05/13/2020 |
0026127 RA |
PLATT |
|
NOT APPLICABLE
|
|
RENOVATION OF APT. 7B ON THE SEVENTH FLOOR. MINOR PARTITION CHANGES,
|
|
Work on Floor(s): 007
|
| 10/06/2017 |
140703709 |
01 |
A3 |
X SIGNED OFF |
05/09/2018 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 09/26/2017 |
122872034 |
04 |
A2 |
P APPROVED |
10/03/2017 |
|
SCHWARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 010
|
| 07/31/2017 |
123305654 |
01 |
A2 |
X SIGNED OFF |
05/15/2019 |
0018546 RA |
EACKER |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AND NON-STRUCTURAL SLAB-ON-GRADE REPLACEMENT AS PER DRAWING
|
|
Work on Floor(s): FAC,OPS,GND 001 thru 012
|
| 06/27/2017 |
122872034 |
03 |
A2 |
P APPROVED |
06/28/2017 |
|
SCHWARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 010
|
| 05/31/2017 |
140582821 |
02 |
A2 |
P APPROVED |
07/06/2017 |
|
PLATT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 03/29/2017 |
123040752 |
01 |
A2 |
R PERMIT-ENTIRE |
06/22/2017 |
0082481 PE |
TAHA |
|
NOT APPLICABLE
|
|
LOBBY AIR CONDITIONING SYSTEM INSTALLATION. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): 001
|
| 12/06/2016 |
140582821 |
01 |
A2 |
X SIGNED OFF |
02/06/2018 |
0026127 RA |
PLATT |
|
NOT APPLICABLE
|
|
RENOVATION OF APARTMENT 6A ON THE 6TH FLOOR. NON LOADBEARING PARTITION CHA
|
|
Work on Floor(s): 006
|
| 08/23/2016 |
122872034 |
01 |
A2 |
X SIGNED OFF |
04/20/2018 |
0030575 RA |
GILMORE |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING APARTMENT 10A LOCATED ON THE 010 FLOOR. ARCHITECTUR
|
|
Work on Floor(s): 010
|
| 08/23/2016 |
122872034 |
02 |
A2 |
X SIGNED OFF |
04/20/2018 |
0091112 PE |
SCHWARTZ |
|
NOT APPLICABLE
|
|
PLUMBING AND MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF EXISTING
|
|
Work on Floor(s): 010
|
| 03/08/2016 |
122365582 |
02 |
A2 |
X SIGNED OFF |
10/19/2016 |
0062598 PE |
POLLAK |
|
NOT APPLICABLE
|
|
FILING FOR MECHANICAL WORK; NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
|
|
Work on Floor(s): 003
|
| 03/08/2016 |
122365582 |
01 |
A2 |
X SIGNED OFF |
10/19/2016 |
0010297 RA |
MELVIN |
|
NOT APPLICABLE
|
|
FILING FOR MASONRY RENOVATION TO CLOSE AND MODIFY OPENING FOR AC UNITS; NO
|
|
Work on Floor(s): 003
|
| 04/20/2015 |
122358064 |
01 |
A2 |
X SIGNED OFF |
12/14/2015 |
0062598 RA |
POLLAK |
|
NOT APPLICABLE
|
|
FILING FOR MECHANICAL WORK TO INSTALL TWO CONDENSING UNITS FILED IN CONJUN
|
|
Work on Floor(s): 006
|
| 12/23/2014 |
122220836 |
01 |
A2 |
X SIGNED OFF |
02/29/2016 |
0010297 RA |
MELVIN |
|
NOT APPLICABLE
|
|
MASONRY RENOVATION AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
|
|
Work on Floor(s): 006
|
| 02/12/2014 |
121539460 |
02 |
A2 |
P APPROVED |
02/25/2014 |
|
DANA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 012
|
| 12/18/2013 |
120718170 |
04 |
A2 |
P APPROVED |
12/18/2013 |
|
GLASS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 03/29/2013 |
120766215 |
03 |
A2 |
P APPROVED |
04/26/2013 |
|
MELVIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 MASONRY RECONSTRUCTION AS PER DRAWINGS. NO
|
|
Work on Floor(s): 011,012,ROF
|
| 02/21/2013 |
121539460 |
01 |
A2 |
X SIGNED OFF |
12/11/2015 |
0025093 RA |
DANA |
|
NOT APPLICABLE
|
|
RENOVATE APT.12B.WORK TO INCLUDE REMOVAL & INSTALLATION OF NON LOAD BEARIN
|
|
Work on Floor(s): 012
|
| 02/11/2013 |
121530931 |
02 |
A2 |
X SIGNED OFF |
01/02/2014 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
APT 6B APARTMENT RENOVATION: PROVIDE (1) TWO TON AND (1) TWO AND A HALF TO
|
| 02/11/2013 |
121530931 |
01 |
A2 |
X SIGNED OFF |
01/02/2014 |
0018485 RA |
ZIRINSKY |
|
NOT APPLICABLE
|
|
MINOR APARTMENT WORK- RENOVATION OF THREE EXISTING BATHROOMS. NEW SPLIT SY
|
| 11/05/2012 |
121064846 |
05 |
A2 |
P APPROVED |
11/14/2012 |
|
COLE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 10/11/2012 |
121064846 |
04 |
A2 |
P APPROVED |
10/17/2012 |
|
COLE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 08/22/2012 |
121064846 |
03 |
A2 |
P APPROVED |
09/12/2012 |
|
COLE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 05/02/2012 |
121064846 |
02 |
A2 |
X SIGNED OFF |
03/22/2013 |
0059584 PE |
RUBIANO |
|
NOT APPLICABLE
|
|
MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF AN EXISTING APARTMEN
|
|
Work on Floor(s): 003
|
| 05/02/2012 |
121064846 |
01 |
A2 |
X SIGNED OFF |
03/22/2013 |
0017848 RA |
COLE |
|
NOT APPLICABLE
|
|
RENOVATION OF AN EXISTING APARTMENT #3B ON THE 3RD FLOOR. ARCHITECTURAL AN
|
|
Work on Floor(s): 003
|
| 02/15/2012 |
120821744 |
02 |
A3 |
P APPROVED |
02/16/2012 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 01/24/2012 |
120718170 |
03 |
A2 |
P APPROVED |
11/27/2013 |
|
GLASS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 01/13/2012 |
120949082 |
01 |
A2 |
X SIGNED OFF |
07/14/2014 |
0016076 RA |
STRONG |
|
NOT APPLICABLE
|
|
MINOR RENOVATION OF APARTMENT 5A. REPLACEMENT AND RELOCATION OF PLUMBING
|
|
Work on Floor(s): 005
|
| 12/27/2011 |
120766215 |
02 |
A2 |
P APPROVED |
01/20/2012 |
|
MELVIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011,012,ROF
|
| 11/30/2011 |
120912771 |
01 |
A2 |
X SIGNED OFF |
08/16/2012 |
0029481 RA |
KINLIN |
|
NOT APPLICABLE
|
|
RENOVATIONS TO APT. #11B. WORK TO INCLUDE INTERIOR DEMOLITION, GENERAL
|
|
Work on Floor(s): 011
|
| 11/16/2011 |
120718170 |
02 |
A2 |
P APPROVED |
12/05/2011 |
|
GLASS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 11/04/2011 |
120885701 |
01 |
A3 |
R PERMIT-ENTIRE |
05/04/2012 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD SUPPORT BEAM AS PER PLAN AT 161 WEST 86 STREET. D
|
|
Work on Floor(s): OSP
|
| 10/12/2011 |
120856920 |
01 |
A3 |
R PERMIT-ENTIRE |
05/04/2012 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLAN AT 161 WEST 86 STREET. DURING MA
|
|
Work on Floor(s): OSP
|
| 09/30/2011 |
120572567 |
02 |
A2 |
P APPROVED |
10/03/2011 |
|
DEUTSCH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 09/16/2011 |
120821744 |
01 |
A3 |
X SIGNED OFF |
03/10/2014 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED APPROXIMATELY 41 L.F. AS PER PLAN
|
|
Work on Floor(s): OSP
|