| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/04/2007 |
110036997 |
02 |
A2 |
X SIGNED OFF |
04/09/2008 |
0076552 PE |
BARBATO |
|
NOT APPLICABLE
|
|
REFRAMING FOR NEW STAIR BETWEEN 1ST AND 2ND FLOORS, AS PER PLANS SUBMITTED
|
|
Work on Floor(s): BAS,001,002
|
| 12/04/2007 |
110036997 |
01 |
A2 |
X SIGNED OFF |
04/09/2008 |
0021776 RA |
REGO |
|
NOT APPLICABLE
|
|
PARTITIONS, CEILING AND PLUMBING WORK IN THE BASEMENT, 1ST AND 2ND FLOORS
|
|
Work on Floor(s): BAS,001,002
|
| 10/23/2006 |
104571385 |
01 |
A2 |
X SIGNED OFF |
02/25/2008 |
0021776 RA |
REGO |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION IN THE BASEMENT AND REMOVAL OF STAIR BETWEEN 1ST & 2ND
|
|
Work on Floor(s): BAS,001,002
|
| 03/30/2006 |
104392186 |
01 |
A3 |
X SIGNED OFF |
01/20/2010 |
OT |
DEL MAST |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD STAIR TOWER 7' LONG X 50' HIGH DURING FACADE RE
|
|
Work on Floor(s): 001
|
| 03/28/2006 |
104391150 |
01 |
A3 |
X SIGNED OFF |
01/20/2010 |
OT |
DEL MAST |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 22' DURING FACADE REPAIR. NO CH
|
|
Work on Floor(s): 001
|
| 11/13/2003 |
103616598 |
01 |
A3 |
X SIGNED OFF |
01/30/2015 |
0000000 OT |
Bitonti |
|
NOT APPLICABLE
|
|
Erection of 20 L.F. of heavy duty sidewalk shed as per BSA Minutes 341-74S
|
|
Work on Floor(s): 001
|
| 08/29/2001 |
101559591 |
09 |
A1 |
P APPROVED |
10/30/2001 |
0018829 RA |
AHARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 04/10/2001 |
101559591 |
08 |
A1 |
P APPROVED |
11/01/2001 |
0018829 RA |
AHARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 03/13/2001 |
101559591 |
07 |
A1 |
D A/P ENTIRE |
08/13/2001 |
0018829 RA |
AHARI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/01/2001
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 12/02/1999 |
101559591 |
06 |
A1 |
P APPROVED |
03/23/2000 |
0018829 RA |
AHARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 11/18/1999 |
101559591 |
05 |
A1 |
P APPROVED |
11/29/1999 |
0059849 PE |
GASPAREC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 03/30/1999 |
102058041 |
01 |
A3 |
X SIGNED OFF |
04/25/2001 |
|
BUTNNER |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHED 22FT DURING FACADE REPAIR SHED TO COMPLY WITH
|
|
Work on Floor(s): GRD
|
| 10/15/1998 |
101559591 |
04 |
A1 |
X SIGNED OFF |
11/29/2001 |
0059849 PE |
GASPAREC |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW SPRINKLER HEADS THROUGHOUT THE ENTIRE BLDG AS PE
|
|
Work on Floor(s): CEL,BAS,ROF,PEN 001 thru 004
|
| 09/11/1998 |
101559591 |
03 |
A1 |
X SIGNED OFF |
11/29/2001 |
0007830 PE |
BENIGNO |
|
NOT APPLICABLE
|
|
INSTALLATION OF STRUCTURAL STEEL AS INDICATED ON DRAWINGS FILED
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/11/1998 |
101559591 |
02 |
A1 |
X SIGNED OFF |
11/29/2001 |
0059849 PE |
GASPAREC |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW HVAC UNIT AND DUCT WORK INSTALLATION OF PLUMBING
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/09/1998 |
102061901 |
01 |
A2 |
X SIGNED OFF |
01/10/2000 |
0059264 PE |
DRAPER |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION AS PER PLANS,IN CONJUNCTION WITH ALT TYPE 1 APPL
|
|
Work on Floor(s): CEL 001 thru 004
|
| 11/18/1997 |
101559591 |
01 |
A1 |
X SIGNED OFF |
11/29/2001 |
0018829 RA |
AHARI |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING CLASS A MD TO CONVERT INTO ONE FAMILY DWELLING.
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 10/21/1992 |
100489188 |
01 |
A1 |
X SIGNED OFF |
08/23/1993 |
0012583 RA |
SIRIS |
|
NOT APPLICABLE
|
|
PROPOSE TO CHANGE THE USE OF THE BASEMENT LEVEL FROM APARTMENT
|
|
Work on Floor(s): BMT
|
|
104391971 |
01 |
A3 |
B A/P UNPAID |
03/28/2006 |
|
|
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/17/2015
|