| 02/05/2024 |
124039502 |
01 |
A1 |
J P/E DISAPPROVED |
01/07/2025 |
0023025 RA |
GRAY |
|
NOT APPLICABLE
|
|
APPLICATION FILED IN ORDER TO OBTAIN AN AMENDED CERTIFICATE OF OCCUPANCY.
|
|
Work on Floor(s): BAS
|
| 06/08/2022 |
123713801 |
02 |
A2 |
P APPROVED |
06/27/2022 |
|
SCHLAEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 008
|
| 12/24/2020 |
140995350 |
01 |
A2 |
X SIGNED OFF |
12/16/2022 |
0019026 RA |
TONOS |
|
NOT APPLICABLE
|
|
RENOVATION APARTMENT UNIT 4-B. NO CHANGE TO USE OCCUPANCY OR EGRESS UNDER
|
|
Work on Floor(s): 004
|
| 08/06/2019 |
123713801 |
01 |
A2 |
X SIGNED OFF |
07/18/2022 |
0035052 RA |
SCHLAEN |
|
NOT APPLICABLE
|
|
EXTERIOR RESTORATION AS PER PLANS FILED HEREWITH. SIDEWALK SHED IF REQUIRE
|
|
Work on Floor(s): 001 thru 008
|
| 07/24/2018 |
123553154 |
01 |
A2 |
X SIGNED OFF |
07/10/2020 |
0023025 RA |
GRAY |
|
NOT APPLICABLE
|
|
RENOVATION OF APARTMENT #9C; DEMOLITION OF NON-LOADBEARING PARTITIONS;
|
|
Work on Floor(s): 009
|
| 05/30/2018 |
123354832 |
02 |
A2 |
P APPROVED |
06/14/2018 |
|
SCHLAEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,2ND
|
| 02/21/2018 |
123354832 |
01 |
A2 |
X SIGNED OFF |
08/07/2019 |
0035052 RA |
SCHLAEN |
|
NOT APPLICABLE
|
|
REMOVAL OF GAS SUPPLY TO APARTMENT 2B CURRENTLY LOCATED ON APT 2D RELOCATE
|
|
Work on Floor(s): CEL,2ND
|
| 12/21/2017 |
122570529 |
01 |
A2 |
X SIGNED OFF |
04/06/2020 |
0032981 RA |
QUATELA |
|
NOT APPLICABLE
|
|
PROPOSED COMBINATION OF EXISTING APT # 2C WITH 2D UNDER TPPN# 3/97 AND INT
|
|
Work on Floor(s): 002
|
| 10/25/2017 |
122757775 |
02 |
A2 |
P APPROVED |
01/16/2018 |
|
SCHLAEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 04/08/2016 |
122757775 |
01 |
A2 |
X SIGNED OFF |
01/23/2018 |
0035052 RA |
SCHLAEN |
|
NOT APPLICABLE
|
|
ROOF REPLACEMENT WITH NEW INSULATION. INSTALLATION OF NEW RAILINGS AT PARA
|
|
Work on Floor(s): ROF
|
| 10/23/2015 |
122552638 |
01 |
A2 |
X SIGNED OFF |
02/01/2024 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
INSTALL REPLACEMENT FUEL STORAGE TANK AS PER PLANS. REMOVE EXISTING FUEL S
|
|
Work on Floor(s): CEL
|
| 09/16/2014 |
122132879 |
01 |
A2 |
X SIGNED OFF |
02/25/2016 |
0025687 RA |
DIXON |
|
NOT APPLICABLE
|
|
INSTALL & REMOVE INTERIOR PARTITIONS.REVISE CLOSETS & BEDROOM LAYOUT.RELOC
|
|
Work on Floor(s): 004
|
| 07/22/2014 |
122075397 |
01 |
A2 |
X SIGNED OFF |
10/20/2015 |
0036223 RA |
BERMAN |
|
NOT APPLICABLE
|
|
MODIFICATION TO INTERIOR PARTITIONS ALONG WITH RELATED GENERAL CONSTRUCTIO
|
|
Work on Floor(s): 009
|
| 04/14/2014 |
121977593 |
01 |
A2 |
X SIGNED OFF |
11/05/2015 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE 5000 GALLON OIL TANK WITH TWO (2) 275 OIL TANKS AND CHANGE GRADE O
|
|
Work on Floor(s): CEL
|
| 02/29/2012 |
120598264 |
02 |
A2 |
P APPROVED |
05/21/2012 |
|
KENNETH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 009
|
| 10/14/2011 |
120856886 |
01 |
A2 |
X SIGNED OFF |
02/15/2013 |
0018121 RA |
COMINS |
|
NOT APPLICABLE
|
|
CONSTRUCT INTERIOR NON-LOAD BEARING PARTITIONS, REPLACE FIXTURES IN SAME
|
|
Work on Floor(s): 008
|
| 09/13/2011 |
120822592 |
01 |
A1 |
P APPROVED |
09/23/2011 |
0008701 RA |
ROSS |
|
NOT APPLICABLE
|
|
APPLICATION FILED IN ORDER TO OBTAIN AN AMENDED CERTIFICATE OF OCCUPANCY.
|
|
Work on Floor(s): CEL,BAS,001,008
|
| 02/04/2011 |
120598264 |
01 |
A2 |
X SIGNED OFF |
06/06/2012 |
0008701 RA |
KENNETH |
|
NOT APPLICABLE
|
|
EXTERIOR FACADE REPAIR AS PER PLANS SUBMITTED NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): 001 thru 009
|
| 09/09/2010 |
120467262 |
01 |
A2 |
X SIGNED OFF |
11/16/2011 |
0023025 RA |
GRAY |
|
NOT APPLICABLE
|
|
DEMOLITION OF INTERIOR NON-LOADBEARING PARTITONS; CONSTRUCTION OF NEW
|
|
Work on Floor(s): 002
|
| 04/13/2010 |
120319431 |
01 |
A2 |
X SIGNED OFF |
03/06/2012 |
0008701 RA |
ROSS |
|
NOT APPLICABLE
|
|
REMOVAL OF A VOLUNTARY FIRE ESCAPE FROM 2ND STORY REAR OF BUILDING FIRE
|
|
Work on Floor(s): 2ND
|
| 03/05/2009 |
104901108 |
02 |
A2 |
P APPROVED |
04/28/2009 |
|
ROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 09/18/2007 |
104901108 |
01 |
A2 |
X SIGNED OFF |
02/25/2011 |
0008701 RA |
ROSS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APT.MINOR PARTITIONS WORK, NEW
|
|
Work on Floor(s): BAS
|
| 10/05/2004 |
103940620 |
01 |
A2 |
X SIGNED OFF |
05/11/2016 |
0007343 RA |
Calwil |
|
NOT APPLICABLE
|
|
Combine Apts 3A and 3B into one ( 1 ) class "A" apt. Remove kitchen in Ap
|
|
Work on Floor(s): 003
|
| 11/05/2003 |
103610479 |
01 |
A2 |
X SIGNED OFF |
09/01/2016 |
0028283 RA |
Ragab |
|
NOT APPLICABLE
|
|
Kitchen and Bathroom renovation. No change in occupancy. No change in egre
|
|
Work on Floor(s): 006
|
| 05/17/1999 |
102179278 |
01 |
A3 |
X SIGNED OFF |
07/07/2004 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED: 180' LONG
|
| 07/16/1998 |
101897609 |
01 |
A2 |
X SIGNED OFF |
05/11/2016 |
0012098 RA |
VILKAS |
|
NOT APPLICABLE
|
|
CREATING CONVENIENCE OPENING BETWEEN APTS 3A & 3B , AS PER PLANS
|
|
Work on Floor(s): 3
|
| 12/04/1996 |
101446561 |
01 |
A2 |
X SIGNED OFF |
08/07/1997 |
0012098 RA |
VILKAS |
|
NOT APPLICABLE
|
|
TO INSTALL CONVENIENCE DOORS BETWEEN APARTMENTS 3A & 3B. NO CHANGE
|
|
Work on Floor(s): 3
|
|
110161459 |
01 |
A1 |
3 SUSPENDED |
05/14/2008 |
0008701 RA |
ROSS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/27/2011 APPLICATION FILED IN ORDER TO OBTAIN AN AMENDED C
|
|
Work on Floor(s): BAS
|