| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/07/2012 |
104588625 |
15 |
A1 |
P APPROVED |
01/10/2013 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 07/20/2011 |
104588625 |
14 |
A1 |
P APPROVED |
09/12/2011 |
0072030 PE |
Falconer |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 02/28/2011 |
104588625 |
13 |
A1 |
P APPROVED |
03/09/2011 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 11/17/2010 |
104588625 |
12 |
A1 |
P APPROVED |
11/30/2010 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 11/15/2010 |
104588625 |
11 |
A1 |
P APPROVED |
11/16/2010 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 09/21/2010 |
104588625 |
10 |
A1 |
P APPROVED |
09/29/2010 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 07/16/2010 |
104588625 |
09 |
A1 |
P APPROVED |
09/13/2010 |
|
Baird |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 06/04/2010 |
104588625 |
08 |
A1 |
P APPROVED |
09/13/2010 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 03/29/2010 |
120307417 |
01 |
A3 |
X SIGNED OFF |
07/26/2011 |
0072914 PE |
HUMAYUN |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFODING ON THE BALKHEAD ROOF SHED 8'L X 25'H
|
|
Work on Floor(s): ROF
|
| 02/05/2010 |
104588625 |
07 |
A1 |
P APPROVED |
02/10/2010 |
0029016 RA |
Baird |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 02/05/2010 |
104588625 |
06 |
A1 |
P APPROVED |
02/10/2010 |
0072030 |
Falconer |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 02/05/2010 |
104588625 |
05 |
A1 |
P APPROVED |
02/10/2010 |
|
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 01/27/2010 |
120249445 |
01 |
A3 |
X SIGNED OFF |
11/11/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFODING IN THE BACK OF THE BUILDING 17" L X 64'-8"
|
|
Work on Floor(s): GRD
|
| 08/19/2009 |
104588625 |
04 |
A1 |
P APPROVED |
09/16/2009 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 07/14/2009 |
120097448 |
02 |
A3 |
P APPROVED |
07/20/2009 |
|
SYED-NAQ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF SCAFFOLDING 20'L X 48'H.
|
|
Work on Floor(s): GRD
|
| 07/02/2009 |
120097830 |
01 |
A3 |
X SIGNED OFF |
07/26/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 32'L X 14'H X 20'W WITH AN ADDI
|
|
Work on Floor(s): GRD
|
| 07/02/2009 |
120097448 |
01 |
A3 |
X SIGNED OFF |
07/26/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLDING 20'L X 48'H.
|
|
Work on Floor(s): GRD
|
| 12/08/2008 |
110401896 |
01 |
A3 |
P APPROVED |
01/12/2009 |
0068605 PE |
PILLORI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/17/2011 HEREWITH SUBMTTING PROPOSED EXCAVATION DETAILS IN
|
|
Work on Floor(s): CEL
|
| 05/08/2008 |
110156900 |
01 |
A2 |
X SIGNED OFF |
08/10/2011 |
0069119 PE |
CADER |
|
NOT APPLICABLE
|
|
APPLICATION FILED HEREWITH FOR TEMPORARY SHORING. APPLICATION FILED IN
|
|
Work on Floor(s): CEL
|
| 04/21/2008 |
110142550 |
01 |
A3 |
X SIGNED OFF |
11/05/2010 |
0072827 PE |
PITERIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A PIPE SCAFFOLD 20' LONG X 110' HIGH (FROM GRADE) IN REAR
|
|
Work on Floor(s): 1
|
| 03/28/2007 |
104588625 |
03 |
A1 |
X SIGNED OFF |
03/04/2013 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
This subsequent application is being filed for Mechanical, Plumbing and
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 03/28/2007 |
104588625 |
02 |
A1 |
X SIGNED OFF |
03/04/2013 |
0072030 PE |
Falconer |
|
NOT APPLICABLE
|
|
This subsequent application is being filed for Structural work as per plan
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|
| 10/23/2006 |
104588625 |
01 |
A1 |
X SIGNED OFF |
03/04/2013 |
0029016 RA |
Baird |
|
NOT APPLICABLE
|
|
This Alt I application is being filed for conversion of the existing build
|
|
Work on Floor(s): CEL,BAS,PEN 001 thru 005
|