 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/12/2014 |
121935870 |
01 |
A2 |
R PERMIT-ENTIRE |
03/28/2017 |
0070094 PE |
TURNIER |
|
NOT APPLICABLE
|
|
REPLACEMENT OF (1)SINK, (1)BATHTUB, (1) WC ON EXISTING BATHROOM ROUGHING.
|
|
Work on Floor(s): 1ST
|
| 12/31/2008 |
110109515 |
02 |
A2 |
P APPROVED |
01/02/2009 |
|
RUDIKOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 04/08/2008 |
110109515 |
01 |
A2 |
X SIGNED OFF |
03/18/2009 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE GAS BOILER (NYC BOILER NO MD34667-01). NO CHANGE IN EGRESS, OCCUPA
|
|
Work on Floor(s): CEL
|
| 10/03/2005 |
104250631 |
01 |
A2 |
X SIGNED OFF |
12/20/2006 |
0079980 PE |
MEDITZ |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER ON LOW PRESSURE BOILER WITH GAS BURNER. NO CHANGE IN
|
|
Work on Floor(s): CEL
|