Premises: 252 WEST 71 STREET MANHATTAN BIN: 1030384    Block: 1162    Lot: 55

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
07/17/2023 123721687 06 A1 P APPROVED 11/18/2024 BIANCHI GRANTED 10/11/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): ROF,CEL,BAS,OSP 001 thru 004

08/30/2022 123721687 05 A1 P APPROVED 09/27/2022 BIANCHI GRANTED 10/11/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): ROF,CEL,BAS,OSP 001 thru 004

05/12/2021 122730786 03 A1 G PAA FEE DUE 05/12/2021 BIANCHI GRANTED 08/03/2016
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): ROF,CEL,BAS 001 thru 004

05/11/2021 123721687 04 A1 P APPROVED 08/16/2021 BIANCHI GRANTED 10/11/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): ROF,CEL,BAS,OSP 001 thru 004

01/09/2020 123721687 03 A1 P APPROVED 02/13/2020 0035023 RA BIANCHI GRANTED 10/11/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): ROF,CEL,BAS,OSP 001 thru 004

01/09/2020 122730786 02 A1 P APPROVED 02/18/2020 0035023 RA BIANCHI GRANTED 08/03/2016
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): ROF,CEL,BAS 001 thru 004

05/24/2019 123721687 02 A1 R PERMIT-ENTIRE 11/14/2019 0074213 PE PILLA GRANTED 10/11/2019
 SUBSEQUENT FILING FOR STRUCTURAL WORKS.
 Work on Floor(s): CEL,BAS,ROF 001 thru 004

05/20/2019 123721687 01 A1 R PERMIT-ENTIRE 03/13/2020 0035023 RA BIANCHI GRANTED 10/11/2019
 PROPOSED 1-STORY VERTICAL ENLARGEMENT @ EXISTING SINGLE FAMILY BUILDING; R
 Work on Floor(s): ROF,CEL,BAS,OSP 001 thru 004

03/23/2016 122730786 01 A1 R PERMIT-ENTIRE 09/16/2019 0035023 RA BIANCHI GRANTED 08/03/2016
 PROPOSED 1-STORY VERTICAL ENLARGEMENT @ EXISTING SINGLE FAMILY BUILDING WI
 Work on Floor(s): ROF,CEL,BAS 001 thru 004

06/28/2013 121183717 02 A1 F ASSIGNED TO P/E 01/22/2014 CHIN GRANTED 07/25/2012
 POST APPROVAL AMENDMENT FOR 01 HORIZONTAL EXTENSTION OF EXIST 3RD FLOOR &
 Work on Floor(s): CEL,BAS 001 thru 005

06/05/2012 121183717 01 A1 R PERMIT-ENTIRE 04/21/2014 0013891 RA CHIN GRANTED 07/25/2012
 VERTICAL EXTENSION OF THE EXISTING 1 FAMILY AND BASEMENT BATHROOM RENOVATI
 Work on Floor(s): CEL,BAS 001 thru 004

05/26/2009 110036817 04 A2 P APPROVED 07/07/2009 TAN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL,BAS 001 thru 003

06/23/2008 110036817 03 A2 P APPROVED 07/11/2008 TAN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL,BAS 001 thru 003

11/30/2007 110036817 02 A2 X SIGNED OFF 08/12/2010 0077896 PE TAN NOT APPLICABLE
 ALTER H.V.A.C. SYSTEM AND REPLACE AND INSTALL FIXTURES AS SHOWN ON DRAWI
 Work on Floor(s): CEL,BAS 001 thru 003

11/30/2007 110036817 01 A2 X SIGNED OFF 08/12/2010 0053150 PE CESCA NOT APPLICABLE
 CONSTRUCT GREENHOUSE AT BASEMENT LEVEL CONSTRUCT NEW SHAFT FOR SINGLE FA
 Work on Floor(s): CEL 001 thru 003

02/18/1998 101798510 01 A1 Q PERMIT-PARTIAL 12/18/1998 0010783 RA KOVACH NOT APPLICABLE
 CHANGE OF USE ON THE BASEMENT CONVERTED TO OFFICE, PENTHOUSE ADDITION
 Work on Floor(s): BAS,PEN,3RD