| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/20/2020 |
140982578 |
01 |
A2 |
X SIGNED OFF |
04/27/2021 |
0074869 PE |
KHANZADA |
|
NOT APPLICABLE
|
|
APPLICATION FOR CONSTRUCTION OF CEILING WITH STRUCTURAL STEEL SUPPORT IN C
|
|
Work on Floor(s): CEL
|
| 07/11/2019 |
123778581 |
01 |
A2 |
X SIGNED OFF |
12/06/2019 |
0017474 RA |
GADALETA |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR LOBBY RENOVATION TO MODIFY EXISTING PARTITIONS, WALL
|
|
Work on Floor(s): LOB
|
| 01/24/2019 |
121748252 |
04 |
A2 |
P APPROVED |
01/25/2019 |
|
MONROE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 014
|
| 01/23/2019 |
121748252 |
03 |
A2 |
D A/P ENTIRE |
01/24/2019 |
|
MONROE |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/24/2019
|
|
Work on Floor(s): ROF 001 thru 014
|
| 12/20/2016 |
121748252 |
02 |
A2 |
P APPROVED |
03/29/2017 |
|
MONROE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 014
|
| 08/13/2013 |
121748252 |
01 |
A2 |
X SIGNED OFF |
02/07/2019 |
0034900 RA |
MONROE |
|
NOT APPLICABLE
|
|
7TH CYCLE FACADE INSPECTION SAFETY PROGRAM (FISP) REPAIR; MASONRY REPAIRS
|
|
Work on Floor(s): ROF 001 thru 014
|
| 04/29/2013 |
121604148 |
01 |
A3 |
X SIGNED OFF |
02/20/2015 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 06/14/2012 |
121103689 |
01 |
A2 |
J P/E DISAPPROVED |
06/25/2012 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
AIR CONDITIONING UNIT INSTALATION. THERE WILL BE NO CHANGE IN USE EGRESS O
|
|
Work on Floor(s): CEL,OSP
|
| 07/12/2010 |
120407746 |
01 |
A2 |
X SIGNED OFF |
08/30/2010 |
0024582 RA |
PARK |
|
NOT APPLICABLE
|
|
TO INSTALL (1) 5 TON SPLIT-TYPE A/C UNIT AT 1ST FLOOR LOBBY AND TO OBTAIN
|
|
Work on Floor(s): 001
|
| 01/14/2010 |
104892957 |
04 |
A2 |
P APPROVED |
01/19/2010 |
|
Gerner |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): LOB
|
| 08/21/2009 |
120137921 |
01 |
A3 |
X SIGNED OFF |
08/09/2012 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 30 L.F. AS PER PLAN AT
|
|
Work on Floor(s): OSP
|
| 07/17/2009 |
120013617 |
02 |
A2 |
P APPROVED |
08/03/2009 |
|
GADALETA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 04/15/2009 |
120013617 |
01 |
A2 |
R PERMIT-ENTIRE |
04/29/2010 |
0017474 RA |
GADALETA |
|
NOT APPLICABLE
|
|
DEMOLITION, GENERAL CONSTRUCTION AND PLUMBING ASSOCIATED WITH THE CONVERSI
|
|
Work on Floor(s): CEL,001
|
| 06/12/2008 |
110195823 |
01 |
A2 |
R PERMIT-ENTIRE |
06/17/2008 |
0078958 PE |
COHEN |
|
NOT APPLICABLE
|
|
REPLACE (2) LOW PRESSURE BOILERS AND (2) OIL BURNERS.
|
|
Work on Floor(s): CEL
|
| 12/04/2007 |
104892957 |
03 |
A2 |
P APPROVED |
12/18/2007 |
0015360 RA |
Gerner |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): LOB
|
| 10/04/2007 |
104892957 |
02 |
A2 |
P APPROVED |
10/05/2007 |
0015360 RA |
Gerner |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PEN 001 thru 015
|
| 09/12/2007 |
104892957 |
01 |
A2 |
R PERMIT-ENTIRE |
10/12/2007 |
0015360 RA |
Gerner |
|
NOT APPLICABLE
|
|
Removal and installation of interior non load bearing partitions and relat
|
|
Work on Floor(s): LOB
|
| 01/05/2007 |
104652840 |
01 |
A2 |
R PERMIT-ENTIRE |
01/18/2007 |
0010297 RA |
MELVIN |
|
NOT APPLICABLE
|
|
MASONRY RECONSTRUCTION AT WATER TOWERAS PER DRAWINGS. NO CHANGE IN
|
|
Work on Floor(s): ROF
|
| 07/12/2004 |
103832747 |
01 |
A2 |
X SIGNED OFF |
09/03/2004 |
0012636 RA |
Fox |
|
NOT APPLICABLE
|
|
To remove a minor non-bearing partition to combine two recreation areas at
|
|
Work on Floor(s): CEL
|
| 05/09/2003 |
103449975 |
01 |
A2 |
P APPROVED |
05/09/2003 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
General construction to include new partition in cel. & skylight at first
|
|
Work on Floor(s): CEL,001
|
| 08/06/2001 |
102496354 |
02 |
A2 |
D A/P ENTIRE |
10/31/2001 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 03/22/2001 |
102496354 |
01 |
A2 |
R PERMIT-ENTIRE |
09/09/2002 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
General construction to include new partition in cel ,1st floor apartment
|
|
Work on Floor(s): CEL,001
|
| 03/22/2001 |
102496345 |
01 |
A2 |
R PERMIT-ENTIRE |
03/29/2001 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
General construction to include new partition in cel. No change in use, eg
|
|
Work on Floor(s): CEL
|
| 05/03/2000 |
102616698 |
01 |
A2 |
X SIGNED OFF |
03/01/2002 |
0010297 RA |
MELVIN |
|
NOT APPLICABLE
|
|
MASONRY RECONSTRUCTION AS PER DRAWINGS N O CHANGE IN USE, EGRESS OR OCCU
|
|
Work on Floor(s): ENT
|
| 03/10/2000 |
102659455 |
01 |
A3 |
R PERMIT-ENTIRE |
10/19/2000 |
|
ZAHARIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 140' DURING FACADE REPAIR.
|
|
Work on Floor(s): GRD
|
| 09/27/1995 |
101085843 |
01 |
A3 |
X SIGNED OFF |
01/22/1996 |
0049104 PE |
DROESSLE |
|
NOT APPLICABLE
|
|
REPAIRS TO CRACKED AND BROKEN BRICKS ON ELEVATOR BULHEAD WALLS ON PENTHO
|
|
Work on Floor(s): ROF
|
| 10/12/1990 |
100125785 |
01 |
A3 |
R PERMIT-ENTIRE |
10/16/1990 |
|
BUETTNER |
|
NOT APPLICABLE
|
|
RESPECTFULLY REQUEST TO ERECT A SHED OF 40' W 71 ST DURING FACADE REPAIR
|
|
Work on Floor(s): GRD
|