| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/30/2020 |
140984380 |
01 |
A3 |
X SIGNED OFF |
01/13/2022 |
0035839 RA |
O'CONNER |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HANGING SCAFFOLD AS PER PLAN. NO CHANGE IN
|
|
Work on Floor(s): OSP
|
| 10/19/2020 |
140966505 |
01 |
A3 |
X SIGNED OFF |
01/13/2022 |
0035839 RA |
O'CONNER |
|
NOT APPLICABLE
|
|
STORAGE OF EQUIPMENT, MATERIAL AND DEBRIS UP TO 300 PSF ON TOP OF HEAVY DU
|
|
Work on Floor(s): OSP
|
| 10/10/2017 |
121182718 |
23 |
NB |
P APPROVED |
10/30/2017 |
|
FUSARO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 021
|
| 07/06/2017 |
121323987 |
03 |
A3 |
P APPROVED |
08/29/2017 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GND
|
| 03/27/2017 |
121182718 |
22 |
NB |
P APPROVED |
04/11/2017 |
|
FUSARO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 021
|
|
122989597 |
01 |
A2 |
A PRE-FILED |
01/06/2017 |
0068611 PE |
RABINOVI |
|
NOT APPLICABLE
|
|
ADDITION TO AN EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO
|
|
Work on Floor(s): 001
|
| 04/29/2016 |
122359795 |
05 |
A2 |
P APPROVED |
06/03/2016 |
|
TAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001
|
| 03/03/2016 |
122415403 |
02 |
A2 |
P APPROVED |
03/18/2016 |
|
CUONO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 02/26/2016 |
121323987 |
02 |
A3 |
P APPROVED |
03/01/2016 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GND
|
| 02/11/2016 |
121182718 |
21 |
NB |
P APPROVED |
02/12/2016 |
|
FUSARO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 021
|
| 01/13/2016 |
122162033 |
01 |
A2 |
D A/P ENTIRE |
01/13/2016 |
0075441 PE |
CHIU |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/30/2017 INSTALLATION OF A FIRE ALARM SYSTEM AS PER PLANS
|
|
Work on Floor(s): 001
|
| 12/30/2015 |
121182718 |
20 |
NB |
P APPROVED |
01/04/2016 |
|
FUSARO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 021
|
| 12/29/2015 |
122255585 |
01 |
A2 |
X SIGNED OFF |
05/16/2017 |
0075441 PE |
CHIU |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR THE RELOCATION OF 14 SPRINKLER HEADS AND BRANCHLINES,
|
|
Work on Floor(s): 001
|
| 11/10/2015 |
121182718 |
19 |
NB |
P APPROVED |
11/16/2015 |
0055504 PE |
DEPINTO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,0RF,0PH,PH1 001 thru 020
|
| 08/25/2015 |
122359535 |
02 |
A2 |
P APPROVED |
08/26/2015 |
|
TAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 08/14/2015 |
122404308 |
01 |
A2 |
X SIGNED OFF |
03/15/2016 |
0067012 PE |
JOHN |
|
NOT APPLICABLE
|
|
FILING FOR COGENERATION SYSTEM AS PER PLANS. NO CHANGE TO USE EGRESS OR
|
|
Work on Floor(s): CEL,ROF 001 thru 020
|
| 06/23/2015 |
122209127 |
02 |
A2 |
P APPROVED |
07/28/2015 |
|
TAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 MANUAL AUTOMATIC SMOKE/CO DETECT/SPRINKLER
|
|
Work on Floor(s): CEL,001
|
| 05/27/2015 |
122415403 |
01 |
A2 |
X SIGNED OFF |
05/02/2016 |
0080959 PE |
CUONO |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK FOR INSTALLATION OF STAIRS BETWEEN CEL AND 001, AS SHOWN O
|
|
Work on Floor(s): CEL,001
|
| 05/13/2015 |
121182718 |
18 |
NB |
P APPROVED |
07/22/2015 |
|
FUSARO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 021
|
| 05/05/2015 |
122359795 |
04 |
A2 |
P APPROVED |
05/08/2015 |
|
TAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001
|
| 04/22/2015 |
121182718 |
17 |
NB |
P APPROVED |
05/20/2015 |
0055504 PE |
DEPINTO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,0RF,0PH,PH1 001 thru 020
|
| 04/06/2015 |
122359795 |
03 |
A2 |
X SIGNED OFF |
06/08/2016 |
0080959 PE |
CUONO |
|
NOT APPLICABLE
|
|
SUBSEQUENT STRUCTURAL WORK, AS SHOWN ON PLANS AS SHOWN ON DRAWINGS FILED
|
|
Work on Floor(s): CEL,001
|
| 04/06/2015 |
122359795 |
02 |
A2 |
X SIGNED OFF |
06/08/2016 |
0077896 PE |
TAN |
|
NOT APPLICABLE
|
|
MECHANICAL WORK ON THE CELLAR AND 1ST FLOORS. PLUMBING WORK ON THE CELLAR
|
|
Work on Floor(s): CEL,001
|
| 04/06/2015 |
122359795 |
01 |
A2 |
X SIGNED OFF |
06/08/2016 |
0028319 RA |
DESBRISA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATIONS ON THE 1ST FLOOR AND CELLAR AS SHOWN ON DRAWINGS FILE
|
|
Work on Floor(s): CEL,001
|
| 04/06/2015 |
122359535 |
01 |
A2 |
X SIGNED OFF |
11/20/2015 |
0077896 PE |
TAN |
|
NOT APPLICABLE
|
|
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON CELLAR AND 1ST FLOOR, AS SHOW
|
|
Work on Floor(s): CEL,001
|
| 03/19/2015 |
122255549 |
01 |
A2 |
X SIGNED OFF |
01/12/2016 |
0015478 RA |
PORTER |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR INTERIOR BUILD OUT OF TENANT SPACE AS PER PLANS FILED
|
|
Work on Floor(s): 001
|
| 03/16/2015 |
122337462 |
01 |
A2 |
X SIGNED OFF |
12/01/2016 |
0029249 RA |
NICOLAZZ |
|
NOT APPLICABLE
|
|
FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW JOB #121182718
|
|
Work on Floor(s): CEL,001,TO, 021
|
| 02/13/2015 |
121330336 |
03 |
A2 |
P APPROVED |
03/02/2015 |
|
DEPINTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,RF 001 thru 020
|
| 01/20/2015 |
122246818 |
01 |
A3 |
P APPROVED |
04/02/2015 |
0021470 RA |
FUSARO |
|
NOT APPLICABLE
|
|
RESPECTFULLY SUBMITTING HEREWITH APPLICATION FOR A FIRE PROTECTION PLAN (F
|
|
Work on Floor(s): CEL,RF, PH, PH1 001 thru 020
|
| 11/25/2014 |
121182718 |
16 |
NB |
P APPROVED |
11/26/2014 |
0055504 PE |
DEPINTO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,0RF,0PH,PH1 001 thru 020
|
| 11/20/2014 |
122209127 |
01 |
A2 |
X SIGNED OFF |
01/28/2016 |
0077896 PE |
TAN |
|
NOT APPLICABLE
|
|
MANUAL AUTOMATIC SMOKE/CO DETECT/SPRINKLER FIRE ALARM SYSTEM.
|
|
Work on Floor(s): CEL,001
|
| 11/06/2014 |
121330336 |
02 |
A2 |
P APPROVED |
11/14/2014 |
|
DEPINTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,RF 001 thru 020
|
| 11/06/2014 |
121182718 |
15 |
NB |
P APPROVED |
11/14/2014 |
0055504 PE |
DEPINTO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,0RF,0PH,PH1 001 thru 020
|
| 10/16/2014 |
121182718 |
14 |
NB |
P APPROVED |
10/28/2014 |
0055504 PE |
DEPINTO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,0RF,0PH,PH1 001 thru 020
|
| 10/08/2014 |
121182718 |
13 |
NB |
P APPROVED |
03/13/2015 |
|
FUSARO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 021
|
| 09/04/2014 |
121182718 |
12 |
NB |
P APPROVED |
09/26/2014 |
|
FUSARO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 021
|
| 08/20/2014 |
140243378 |
01 |
A3 |
X SIGNED OFF |
12/19/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BU
|
|
Work on Floor(s): OSP
|
| 08/18/2014 |
121757740 |
04 |
A2 |
P APPROVED |
09/02/2014 |
|
KATZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 012
|
| 07/11/2014 |
121182718 |
11 |
NB |
P APPROVED |
07/28/2014 |
|
FUSARO |
|
GRANTED 10/15/2012
|
|
POST APPROVAL AMENDMENT FOR 01 FILING FOR THE CONSTRUCTION OF NEW MIXED -U
|
|
Work on Floor(s): CEL 001 thru 021
|
| 07/09/2014 |
121182718 |
10 |
NB |
G PAA FEE DUE |
07/09/2014 |
|
FUSARO |
|
GRANTED 10/15/2012
|
|
DOC WITHDRAWN 07/11/2014 FILING FOR THE CONSTRUCTION OF NEW MIXED-USE BUIL
|
|
Work on Floor(s): CEL 001 thru 021
|