 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/03/2017 |
140486267 |
05 |
A2 |
P APPROVED |
06/08/2017 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,004 001 thru 002
|
| 01/13/2017 |
140486267 |
04 |
A2 |
P APPROVED |
01/24/2017 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMODEL APTS A&B ON BASEMENT LEVEL,1A & 1B
|
|
Work on Floor(s): CEL,BAS,004 001 thru 002
|
| 08/04/2016 |
140486267 |
03 |
A2 |
P APPROVED |
08/10/2016 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,004 001 thru 002
|
| 05/04/2016 |
140486267 |
02 |
A2 |
P APPROVED |
05/06/2016 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INTERIOR RENOVATION OF APT A ON THE BASEMEN
|
|
Work on Floor(s): CEL,BAS,004 001 thru 002
|
| 04/25/2016 |
140486267 |
01 |
A2 |
R PERMIT-ENTIRE |
08/14/2024 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL APTS A&B ON BASEMENT LEVEL,1A & 1B ON 1ST FLR,2A ON THE 2ND FLR,4A
|
|
Work on Floor(s): CEL,BAS,004 001 thru 002
|
| 03/17/2005 |
104063754 |
01 |
A2 |
Q PERMIT-PARTIAL |
04/28/2005 |
0026717 RA |
Gregory |
|
NOT APPLICABLE
|
|
At 1st floor rear apt. # 1B, re-surface of walls, partitions, ceiling and
|
|
Work on Floor(s): 001
|
| 06/30/1998 |
101894238 |
01 |
A2 |
R PERMIT-ENTIRE |
09/11/1998 |
0016584 RA |
TIHANYI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/25/2017 ISTALL NEW GLASS ENCLOSURE WITH SIDE WALLS AT THE
|
|
Work on Floor(s): 004
|
| 03/02/1998 |
101685918 |
01 |
A1 |
P APPROVED |
04/21/1998 |
0016584 RA |
TIHANYI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/22/2016 INSTALL CONVENIENT STAIR TO PENTHOUSE ON 4TH FLOO
|
|
Work on Floor(s): 4TH,PH
|
| 09/26/1997 |
101672995 |
01 |
A2 |
R PERMIT-ENTIRE |
10/29/1997 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
REPLACE OLD BOILER AND INSTALL A HB SMIT G300-9 GAS BOILER 600,00 BTU
|
|
Work on Floor(s): CEL
|