 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/21/2020 |
104766040 |
15 |
A1 |
P APPROVED |
07/20/2020 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 04/10/2020 |
104766040 |
14 |
A1 |
P APPROVED |
04/28/2020 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 01/15/2020 |
104766040 |
13 |
A1 |
P APPROVED |
02/07/2020 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 09/16/2019 |
104766040 |
12 |
A1 |
G PAA FEE DUE |
09/16/2019 |
|
ELLIS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/16/2019
|
|
Work on Floor(s): BAS
|
| 07/17/2019 |
104766040 |
11 |
A1 |
P APPROVED |
07/26/2019 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 04/02/2019 |
104766040 |
10 |
A1 |
P APPROVED |
04/03/2019 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 01/02/2019 |
104766040 |
09 |
A1 |
P APPROVED |
01/04/2019 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 04/20/2018 |
123393826 |
01 |
A2 |
X SIGNED OFF |
11/23/2018 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
FILING A NEW PLUMBING SCHEDULE. NO DEMOLITION. NO CHANGE TO EGRESS, USE OR
|
|
Work on Floor(s): CEL,001
|
| 11/13/2017 |
123114744 |
01 |
PA |
J P/E DISAPPROVED |
01/09/2018 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/17/2018
|
|
Work on Floor(s): 001
|
| 10/13/2017 |
104766040 |
08 |
A1 |
P APPROVED |
04/26/2018 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 10/12/2017 |
122660977 |
05 |
A2 |
P APPROVED |
10/19/2017 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 09/13/2017 |
122660977 |
04 |
A2 |
P APPROVED |
09/29/2017 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 08/08/2017 |
122660977 |
03 |
A2 |
P APPROVED |
09/12/2017 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 05/01/2017 |
122660977 |
02 |
A2 |
P APPROVED |
05/11/2017 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 04/11/2017 |
104766040 |
07 |
A1 |
P APPROVED |
10/03/2017 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 12/28/2016 |
104766040 |
06 |
A1 |
P APPROVED |
03/01/2017 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 01/15/2016 |
122660977 |
01 |
A2 |
X SIGNED OFF |
11/23/2018 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
RELOCATE FIXTURES AND INVERT LOCATIONS OF BATHROOM AND KITCHEN. NO CHANGE
|
|
Work on Floor(s): 002
|
| 10/16/2015 |
140417172 |
01 |
A2 |
D A/P ENTIRE |
10/16/2015 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/16/2015 CROSS-SWITCHING KITCHEN AND BATHROOM LOCATIONS. A
|
|
Work on Floor(s): 002
|
| 11/06/2014 |
120577232 |
03 |
A2 |
P APPROVED |
01/08/2015 |
|
PITERA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,CEL 001 thru 005
|
| 09/24/2014 |
122142911 |
01 |
A2 |
J P/E DISAPPROVED |
10/22/2014 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/23/2015 APPLICANT FILING FOR MECHANICAL WORK TYPE IN CONJ
|
|
Work on Floor(s): CEL,1ST,002,003,004,005
|
| 06/18/2014 |
104198119 |
02 |
A2 |
D A/P ENTIRE |
06/19/2014 |
|
ELLIS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/01/2015
|
|
Work on Floor(s): CEL
|
| 03/27/2014 |
121399316 |
02 |
A2 |
D A/P ENTIRE |
03/28/2014 |
|
ELLIS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/12/2018
|
|
Work on Floor(s): CEL
|
| 10/30/2013 |
120577232 |
02 |
A2 |
P APPROVED |
03/05/2014 |
|
PITERA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,CEL 001 thru 005
|
| 10/11/2013 |
121808776 |
01 |
A2 |
X SIGNED OFF |
11/27/2018 |
0071220 PE |
WOJCIESZ |
|
NOT APPLICABLE
|
|
INSTALL HVAC AS PER PLANS.
|
|
Work on Floor(s): OSP,CEL,001
|
| 04/12/2013 |
104766040 |
05 |
A1 |
P APPROVED |
05/08/2013 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 1)CONCRETE STRENGHT OF ROOF TERRACE PER FIE
|
|
Work on Floor(s): BAS
|
| 03/01/2013 |
121544089 |
01 |
A2 |
X SIGNED OFF |
11/19/2018 |
0075814 PE |
RITIENI |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW, MANUAL AND AUTOMATIC, SMOKE/HEAT/CO DETECTION, SPRINK
|
|
Work on Floor(s): CEL,BAS
|
| 10/04/2012 |
121399316 |
01 |
A2 |
X SIGNED OFF |
12/13/2018 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
INSTALL AN ANSEL SYSTEM. NO CHANGE TO OCCUPANCY, EGRESS OR ZONING
|
|
Work on Floor(s): CEL
|
| 02/09/2012 |
104766040 |
04 |
A1 |
D A/P ENTIRE |
02/23/2012 |
|
ELLIS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/12/2013
|
|
Work on Floor(s): BAS
|
| 11/03/2011 |
104766040 |
03 |
A1 |
P APPROVED |
01/24/2012 |
|
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 02/01/2011 |
120347142 |
01 |
PA |
J P/E DISAPPROVED |
06/03/2011 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/17/2018
|
|
Work on Floor(s): 001
|
| 01/19/2011 |
120577232 |
01 |
A2 |
X SIGNED OFF |
11/20/2015 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR SPRINKLER SYSTEM : IN CONJUNCTION WITH PLUMBING WORK
|
|
Work on Floor(s): ROF,CEL 001 thru 005
|
| 12/22/2010 |
104378442 |
05 |
A2 |
P APPROVED |
01/19/2011 |
|
ELIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 005
|
| 10/20/2010 |
104378442 |
04 |
A2 |
P APPROVED |
10/26/2010 |
|
ELIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 005
|
| 04/08/2010 |
120313730 |
01 |
A3 |
X SIGNED OFF |
11/21/2018 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF 34 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BLDG ALTERA
|
|
Work on Floor(s): OSP
|
| 11/27/2009 |
104766040 |
02 |
A1 |
P APPROVED |
11/02/2011 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 11/21/2008 |
104378442 |
03 |
A2 |
P APPROVED |
02/25/2009 |
|
ELIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 005
|
| 05/28/2008 |
104378442 |
02 |
A2 |
P APPROVED |
06/10/2008 |
|
ELIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 005
|
| 06/19/2007 |
104766040 |
01 |
A1 |
X SIGNED OFF |
08/24/2020 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
1)CONCRETE STRENGHT OF ROOF TERRACE PER FIELD TESTS. 2)PLUMBING FIXTURE LA
|
|
Work on Floor(s): BAS
|
| 03/27/2006 |
104378442 |
01 |
A2 |
X SIGNED OFF |
06/27/2014 |
0028533 RA |
ELIS |
|
NOT APPLICABLE
|
|
NO CHANGE USE, EGRESS OR OCCUPANCY .ADD SPRINKLERS FROM DOMESTIC WAT
|
|
Work on Floor(s): ROF 001 thru 005
|
| 08/18/2005 |
104198119 |
01 |
A2 |
X SIGNED OFF |
06/22/2015 |
0028533 RA |
ELLIS |
|
NOT APPLICABLE
|
|
INSTALL BOILER & HW UNIT W/TANK IN EXISTBOILER ROOM. REMOVE 2-275 FO
|
|
Work on Floor(s): 5
|